PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 25th April, 2025
PNGRB/Com/10-NGPLTariff(9)/2022(E-4124).—In exercise of the power conferred by clause (t) of sub-
section (2) of section 61 and power conferred under clause (e) of section 11 of the Petroleum and Natural Gas
Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the
following regulations further to amend the Petroleum and Natural Gas Regulatory Board (Determination of Natural
Gas Pipeline Tariff) Regulations, 2008, namely:—
1. Short title and commencement.
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Determination of Natural
Gas Pipeline Tariff) Amendment Regulations, 2025.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. In the Petroleum and Natural Gas Regulatory Board (Determination of Natural Gas Pipeline Tariff) Regulations,
2008,
(a) In Schedule C, after the words, “Hazira Ankleshwar Natural Gas Pipeline System", at the end the
following shall be inserted, namely:—
+-----+------------------------------+-----------------------------------+
| 10. | Indradhanush Gas Grid Limited | North-East Natural gas Pipeline Grid* |
+-----+------------------------------+-----------------------------------+
| | * shall be part of NGGS from date of its commissioning | |
+-----+------------------------------+-----------------------------------+
(b) In Annexure 1 to Schedule D, after the words, “GSPL India Transco Limited", at the end the
following shall be inserted, namely: -
Indradhanush Gas Grid Limited
ANJAN KUMAR MISHRA, Secy.
[ADVT.-III/4/Exty./54/2025-26]
Foot Note: Principal regulation were published in the Gazette of India (Extraordinary) under No. G.S.R.807(E),
dated the 20th November, 2008 and amended vide G.S.R. 986(E), dated 20th December, 2010 and,
F. No. PNGRB/M(C)/11/Final Tariff Filing, dated 30th May, 2012 and, PS/Secy./M(C)/2012, dated
13th September, 2012. and, F. No. PNGRB/M(C)/48, dated 17th February, 2014 and,
F. No. PNGRB/M(C)/100, dated 27th February, 2014 and, F. No. L-MISC/VI/I/20017, dated
01st January, 2015 and, PNGRB/M(C)/110, dated 08th January, 2016, PNGRB/COM/2-NGPL Tariff
(3)/2019, dated 27th May, 2019, and F. No. PNGRB/COM/2-NGPL/Tariff (3)/2019 Vol-II,
dated 27th March, 2020 and F. No. PNGRB/COM/2-NGPL/Tariff (3)/2014 Vol-IV(Part-1) (P-1439)
dated 23rd November, 2020 and F. No. PNGRB/COM/2-NGPL/Tariff (3)/2014 Vol-IV(Part-1)
(P-1439) dated 23rd November, 2020, PNGRB/COM/2-NGPL/Tariff (3) /2019 Vol-IV (P-4121)
dated 17th November, 2022, PNGRB/Com/10-NGPL Tariff (11)/2022 (P-4142) dated 29th March,