Notification under clause 3(a) of Section 20 of the Petroleum and Natural Gas Regulatory Board Act, 2006 declaring two specified ATF pipelines as common/contract carrier.

Detailed Summary

Petroleum and Natural Gas Regulatory Board (PNGRB) Notification F. No. PNGRB/Auth/3-PPPL(07)/2016 (P-4433) dated 25th July 2023, issued under clause 3(a) of Section 20 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006) read with the definition of 'petroleum and petroleum products pipeline' in Regulation 2(i) of the PNGRB (Authorizing Entities to Lay, Build, Operate or Expand Petroleum and Petroleum Products Pipelines) Regulations, 2010, declares two Aviation Turbine Fuel (ATF) pipelines with all connected infrastructure as common/contract carrier: a 15 km, 10-inch pipeline of design capacity 1.44 MMTPA operated by Bharat Petroleum Corporation Limited from BPCL's Mumbai Refinery to Mumbai International Airport, and a 19.65 km, 10-inch pipeline of design capacity 1.10 MMTPA operated by Hindustan Petroleum Corporation Limited from HPCL's Mumbai Refinery to Mumbai International Airport; the notification is signed by Vandana Sharma, Secretary, under Advt.-III/4/Exty./308/2023-24.

Full Text

EXTRAORDINARY PART III—Section 4 PUBLISHED BY AUTHORITY No. 526] NEW DELHI, WEDNES DAY, JULY 26, 2023/ SHR AVANA 4, 1945 CG-DL-E-27072023-247636 PETROLEUM AND NATURAL GAS REGULATORY BOARD NOTIFICATION New D elhi, the 25th July, 2023 F. No. PNGRB/Auth/3 -PPPL (07)/2016 (P -4433) .—In exercise of power conferred by clause 3(a) of Section 20 of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board here by declares the following petroleum and petroleum product (ATF) pipelines along with all connected infrastructure as per definition of “petroleum and petroleum products pipeline” in Regulation 2(i) of the Petroleum and Natural Gas Regulatory Board (Authori zing Entities to Lay, Build, Operate or Expand Petroleum and Petroleum Products Pipelines) Regulations, 2010 as common/contract carrier: - Sl. No. Pipeline Entity Length Diameter Design Capacity 1 Petroleum and Petroleum Product (ATF) pipeline from BPCL’s Mumbai Refinery to Mumbai International Airport Bharat Petroleum Corporation Limited 15 Km. 10 inch 1.44 MMTPA 2 Petroleum and Petroleum Product (ATF) pipeline from HPCL’s Mumbai Refinery to Mumbai International Airport Hindustan Petroleum Corporation Limited 19.65 Km. 10 inch 1.10 MMTPA VANDANA SHARMA, Secy. [ADVT. -III/4/Exty./ 308/2023 -24] Uploaded by Dte . of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi -110064 and Published by the Controller of Publication s, Delhi -110054 .

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free