Notification under the Guidelines circulated under Section 63 of the Electricity Act, 2003 notifying three inter-state transmission schemes under the Tariff Based Competitive Bidding (TBCB) mode, together with a separate order de-notifying a previously notified transmission scheme.

Detailed Summary

The Ministry of Power (S.O. 3706(E), dated 29th August 2024), in exercise of powers under sub-para 3.2 of Para 3 of the Guidelines under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), and on the recommendation of the 21st meeting of the National Committee on Transmission, notifies three transmission schemes under TBCB mode with designated Bid-Process Coordinators (BPCs): (1) the transmission system for supply of power to Green Hydrogen/Ammonia manufacturing potential in the Kandla area of Gujarat (Phase-I: 3 GW), including a new 765/400 kV Kandla substation and the Halvad-Kandla 765 kV double-circuit line (approximately 140 km), with PFC Consulting Limited as BPC; (2) the transmission system for evacuation of power from the Rajasthan Renewable Energy Zone Phase-V (Sirohi/Nagaur Complex), including works at Sirohi substation and the Sirohi-Mandsaur-Khandwa 765 kV double-circuit lines (approximately 320 km and 260 km), with REC Power Development and Consultancy Limited as BPC; and (3) the North-Eastern Region Expansion Scheme-XXV Part-A (NERES-XXV Part-A), establishing a new 400 kV Bornagar (ISTS) switching station in Assam with associated line reconfigurations, with PFC Consulting Limited as BPC; a second notification (S.O. 3707(E), same date) records that the transmission scheme for evacuation of power from Chhatarpur SEZ (1500 MW), originally notified vide S.O. 2873(E) dated 19.07.2021 (F.No.15/3/2018-Trans-Pt(1)), was recommended for de-notification at the same 21st NCT meeting held on 06.08.2024 and is accordingly de-notified in its entirety; both orders are issued under F. No. 15/3/2018-Trans-Part(4) and signed by Naorem Indrakumar Singh, Under Secretary.

Full Text

5551 GI/202 4 (1) EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY 1. No. 3377] NEW DELHI, FRIDAY , AUGUST 30, 2024 /BHADRA 8, 194 6 CG-DL-E-31082024-256815 6-6) 2. MINISTRY OF POWER NOTIFICATION New Delhi, the 29th August , 2024 S.O. 3706(E).—In exercise of the powers conferred by sub -para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the recommendations of 21st meeting of National Committee on Transmission, hereby notifies the following transmission schemes under TBCB mode, with details of respective Bid -Process Coordinators (BPCs): — Sl. No. Name & Scope of the Transmission Scheme 1. Transmission System for sup ply of power to Green Hydrogen/ Ammonia manufacturing potential in Kandla area of Gujarat (Phase -I: 3 GW) Tentative implementatio n timeframe : 36 months from SPV transfer BPC: PFC Consulting Limited Scope: Sl. No. Scope of the Transmission Scheme Capacity / Line Length (Km) 1. Establishment of 3x1500 MVA, 765/400 kV Kandla (GIS) with 2x 330 MVAR 765 kV bus reactor and 2x125 MVAR 420 kV bus reactor. Future Provisions : Space for ➢ 765/400 kV ICT along with bays -3 Nos. (on Sec -II) ➢ 765 kV line bays along with switchable line reactor s – 2 Nos. (on Sec -I) & 4 Nos. (on Sec -II) ➢ 765 kV Bus Reactor along with bay: 2 Nos. (on Sec -II) ➢ 765 kV Sectionaliser: 1 -set ➢ 400 kV line bays along with switchable linereactors– 12 Nos. (6 on Sec -I & 6 on Sec -II) ➢ 400/220 kV ICT along with bays -6 Nos.(3 Nos. each on Sec -I & Sec -II) ➢ 400 kV Bus Reactor along with bays: 2 Nos. (Sec -II) ➢ 400 kV Sectionaliz ation bay: 1 -set ➢ 220 kV line bays: 12 Nos. (6 nos. each on Sec -I &Sec-II) ➢ 220 kV Sectionalization bay: 1set ➢ 220 kV BC: 2 Nos. ➢ 2 Nos. STATCOM (±400 MVAR) along with 2x125 MVAr MSC & 1x125 MVAr MSR and associated bays -2Nos. (1 on 400kV Sec -I and 1 on400 kV Se c- II) • 765/400 kV, 1500 MVA ICT -3Nos. • 765 kV ICT bays - 3 Nos. • 400 kV ICT bays - 3 Nos. • 330 MVAR 765 kV bus reactor -2Nos. • 125 MVAR 420 kV bus reactor -2Nos. • 765 kV reactor bay - 2 Nos. • 765 kV line bay - 2 Nos. • 400 kV reactor bay - 2 Nos. • 500 MVA, 765/400 kV 1 -PhSpare ICT -1 • 110 MVAR, 765 kV, 1 -ph reactor (spare unit for line/bus reactor) -1 2. Halvad – Kandla(GIS) 765 kV D/c line 140 km (approx.) 3. 2 Nos. of 765 kV line ba ys at Halvad for termination of Halvad – Kandla 765 kV D/c line 765 kV line bays – 2 Nos. (for Halvad end) 4. 240 MVAr switchab le line reactors on each ckt at Kandla (GIS) end of Halvad – Kandla 765 kV D/c line (with NGR bypass arrangement) • 240 MVAr, 765 kV switchable line reactor - 2 Nos. • Switching equipment for 765 kV line reactor - 2 Nos. • 80 MVAR, 765 kV, 1 -phreactor (spare unit for line/bus reactor) -1 No . 5. ± 400 MVAr ST ATCOM along with 2x125 MVAr MSC & 1x125 MVAr MSR at Kandla(GIS) 400 kV Bus section -I • ±400 MVAr STATCOM along with 2x125 MVAr MSC& 1x125 MVAr MSR • 400 kV bay – 1 No . Note: As per initial discussions with Deen Dayal Port Author ity w.r.t. land allocation done to various Green Hydrogen/Ammonia developers in Kand la area, Kandla S/s is proposed to be located near Bhimasar area and line length of Kandla -Halvad line has been considered accordingly. However, exact location of the substation would be finalized bythe BPC/Survey Agency in consultation with Deen Dayal Port Authority and other stakeholde rs. Further, TSP of Halvad S/s shall provide space for scope at Sl. No. 3 above. 2. Transmission system for evacuation of power from Rajasthan REZ Ph -V (Part -1: 4 GW) [Sirohi/Nagaur] Complex Tentative implementation timeframe: 24 months from SPV transfer BPC: REC Power Development and Consultancy Limited Scope: Sl. No. Description of Transmission Element Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 1. Transmission system for immediate Evacuation of Power from Sirohi S/s (2 GW) 1. 5x500 MVA, 400/ 220 kV ICTs at Sirohi S/s along with trans former bays • 400/220 kV 500 MVA ICTs - 5 Nos. • 400 kV ICT bays -5 Nos. • 220 kV ICT bays - 5 Nos. 2. 6 Nos. 220 kV line bays at Sirohi S/s for RE interconnection • 220 kV line bays – 6 Nos. 3. 220 kV Sectionalize r bay (1 set) along with 220 kV BC (2 Nos.) bay and 220 kV TBC (2 Nos.) bay at Sirohi S/s • 220 kV Sectionalizer bay (1 set) • 220 kV BC (2 Nos.) bay and 220 kV TBC (2 Nos.) bay 2. Transmission system for Common Evacuation of Power from Sirohi PS (2 GW) &Merta -II PS (2GW) 4. Sirohi – Mandsau r PS 765 kV D/c li ne along with 240 MVAr switch able line reactor at Sirohi end and 330 MVAr swit chable line reactor at Mandsaur PS end for each circuit of Sirohi –Mandsaur PS 765KV D/c line Line Length -320 km (approx.) • 765 kV line bays at Sirohi S/s – 2 Nos. • 765 kV line ba ys at Mandsaur PS – 2 Nos. • 765 kV, 240 MVAr switchable line reactors at Sirohi S/s end – 2 Nos. • 765 kV, 330 MVAr switchable line reactors at Mandsaur PS end – 2 Nos. • Switching equipment for 765kV, 240 MVAr switchable line reactors at Sirohi S/s end – 2Nos. • Switching equipment for 765kV, 330 MVAr switchable line reactors at Mandsaur PS end – 2 Nos. 5. Mandsaur PS – Khandwa (New) 765 kV D/c line along with 240 M VAr switchable line reactor for each circu it at each end of Mandsaur PS – Khandwa (New) 765kV D/c line Line Length ~260 km (Approx) • 765 kV line bays at Mandsaur PS – 2 Nos. • 765 kV line bays at Khandwa (New) – 2 Nos. • 765 kV, 240 MVAr switchable line reactors at Mandsaur PS end – 2 Nos. • 765 kV, 240 MVAr switchable line reactors at Khandwa (New) end – 2 Nos. • Switching equipment for 765kV, 240 MVAr switchable line reactors at Mandsaur PS end – 2 Nos. • Switching equipment for 765kV, 240 MVAr switchable line reactors at Khandwa (New)end – 2 Nos. Note: • Developer of Sirohi S/s shall provide space for 2 Nos. of 765 kV line bays, 400/220 kV ICTs, 220 kV line bays. 220 kV Sectionalizer bay along with 220 kV BC bay and 220 kV TBC bay, switchable line reactors (along with switching equipment) at Sirohi S/s as per the scope • Develo per of Mandsaur PS shall provide space for 4 Nos. of 765 kV line bays, switchable line reactors (along with switching equipment) at Mandsaur PS • M/s Sterlite shall provide space for 2 Nos. of 765 kV line bays switchable line reactor (along with switching equipment) at Khandwa S/s • The line lengths menti oned above are approximate as the exact length shall be obtained after the detailed survey 3. North -Eastern Region Expansion Scheme -XXV Part -A (NERES -XXV Part -A) Tentative Implementation Time : 36 months from SPV transfer BPC: PFC Consulting Limited Scope: Sl. No. Scope of the Transmission Scheme Capacity (MVA) / Line length (km) / Nos. 1. Establishment of new 400 kV Bornagar (ISTS) switching station in Assam (765 kV and 220 kV levels to be established in future) Additional space for future expansion: • 6x1500 MVA, 765/400 kV ICTs (19x500 MVA single phase including one spare unit) along with associated ICT bays at both voltage levels • 5x500 MVA, 400/220 kV ICTs along with associated ICT bays at both voltage levels • 765 kV line bays (along with space for swit chable line reactor) for future lines: 8 N os. • 400 kV line bays (along with space for switchable line reactor) for future lines:8 Nos. • 220 kV line bays: 10 Nos. • 4x330 MVAr, 765 kV Bus Reactors (13x110 MVAr single phase including one spare unit) along with associated bays • 3x125 MVAr, 420 kV Bus Reactors along with associated bays • 765 kV Bus Sectionaliser: 1set • 400 kV Bus Sectionaliser: 1set • 220 kV Bus Sectionaliser: 1set • 220 kV Bus Coupler bays: 2 Nos. • 220 kV Transfer Bus Coupler bays: 2 Nos. • 420 kV, 1x125 MV Ar Bus Reactor:2 Nos. • 400 kV bus reactor bays: 2 Nos. • 400 kV line bays: i) 2 Nos. each with provision for installation of 1x80 MVAr switchable line reactor [for termination of Alipurduar (POWERGRI D) – Bornagar (ISTS) 400 kV D/c (Quad) line formed after shifting of Alipurduar (POWERGRID) –Bongaigaon (POWERGRID) 400 kV D/c (Quad) line from Bongaigaon (POWERGRID) end to Bornagar (ISTS) S/s] ii) 2 Nos. [for termination of Bongaigaon (POWERGR ID) – Bornagar (ISTS) 400 kV D/c (Quad) line formed after LILO of both circuits of existing Bongaigaon (POWERGRID) –Balipara (POWERGRID) 400 kV D/c (Quad) line at Bornagar (ISTS)] iii) 2 Nos. each with provision for installation of 1x63 MVAr switchable li ne reactor [for termination of Bornagar (ISTS) – Balipara (POWERGRID) 400 kV D/c (Quad) line formed after LILO of both circuits of existing Bongaigaon (POWERGRID) – Balipara (POWERGRID) 400 kV D/c (Quad) line at Bornagar (ISTS)] 2. LILO of both circuits of existing Bongaigaon (POWERGRID) –Balipara (POWERGRID) 400 kV D/c (Quad) line at Bornagar (ISTS) About 8 km (4 km Loop in + 4 km Loop out) 3. #Disconnection of Alipurduar (POWERGRID) – Bongaigaon (POWERGRID) 400 kV D/c (Quad) line from Bongaigaon (POWERGR ID) end and extension of the line for termination at Bornagar (ISTS) S/s so as to form Alipurduar (POWERGRID) – Bornagar (ISTS) 400 kV D/c (Quad) line About 110 km additional line section 4. Installation of 420 kV, 1x80 MVAr switchable line reactor (along with 500 ohm NGR and NGR bypass arrangement) at Bornagar (ISTS) end in each circuit of Alipurduar (POWERGRID) – Bornagar 400 kV D/c (Quad) line formed after shifting of Alipurduar (POWERGRID) – Bongaigaon (POWERGRID) 400 kV D/c (Quad) line from Bongaigaon (POWERGRID) end to Bornagar (ISTS) S/s • 420 kV, 1x80 MVAr switchable line reactor (al ong with 500 ohmNGR and NGR bypass arrangement) - 2 Nos. • Switching equipment for switchable line reactor of 420 kV,1x80 MVAr - 2 Nos. 5. Installation of 420 kV, 1x63 MVAr switchable line reactor (along with 400 ohm NGR and NGR bypass arrangement) at Bornaga r (ISTS) end in each circuit of Bornagar (ISTS) – Balipara (POWERGRID) 400 kV D/c (Quad) line formed after LILO of both circuits of exis ting Bongaigaon (POWERGRID) – Balipara (POWERGRID) 400 kV D/c (Quad) line • 420 kV, 1x63 MVAr switchable line reactor (alo ng with 400 ohm NGR and NGR bypass arrangement) - 2 Nos. • Switching equipment for switchable line reactor of 420 kV, 1x63 MVAr - 2 Nos. Note: (i) #Siliguri (POWERGRID) – Bongaigaon (POWERGRID) 400kV D/c (Qu ad) line was implemented by M/s East North Interc onnection Company Limited (M/s ENICL, SPV of M/s Sterlite). Li ne bays at both ends were implemented by POWERGRID. Further, this line was LILOe d at Alipurduar (POWERGRID) S/s by POWERGRID along with implementation of line bays for terminati on of line, resul ting in formation of Alipurduar (POWERGRID) – Bongaigaon (POWERGRID) 400kV D/c (Quad) line. The Alipurduar(POWERGRID) – Bongaigaon (POWERGRID) 400 kV D/c (Quad) line (partly owned by M/s ENICL and partly by POWERGRID) is to be disconnected from Bongaiga on (POWERGRID) end and extended for termination at Bornagar (ISTS) S/s so as to form Alipurdua r (POWERGRID) – Bornagar (ISTS) 400kV D/c (Quad) line. Upon shifting of line, the line sectio n left unutilised at Bongaigaon (POWERGRID) end needs t o be kept anti -theft charged so that the same can be used in future fortermination of new line. Further, upon shifting of Alip urduar (POWERGRID) – Bongaigaon (POWERGRID) line from Bongaigaon (POWERGRID) S/s to Bornagar (ISTS) S/s, connectivity of all operat ional communicati on links through Bongaigaon has to be ensured. For the same additional OPGW and FOTE needs to be planned as per requirement. ISTS licensee implementing the NERES -XXXV PartA scheme needs to coordinate with M/s ENICL for line shifting and ke eping the unutili sed line section at Bongaigaon (POWERGRID) end anti -theft charged. (ii) The line lengths mentioned above are approximate as the exact line len gth shall be obtained after the detailed survey. 2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by Ministry of Power in this regard, amended from time to time. [F. No. 15/3/2018 -Trans -Part(4) ] NAOREM INDRAKUMAR SINGH , Under Sec y. NOTIFICATION New Delhi, the 29th August , 2024 S.O. 3707(E).—The following transmission scheme was notified for implementation under Tariff Based Competitive Bidding (TBCB) vide Gazette Notification mentioned in below table: Sl. No. Name of the Scheme Gazette Notification by which Scheme was notified 1 Transmission system for evacuation of power from Chhatarpur SEZ (1500 MW) S.O. 2873(E). Dated 19.07.2021 (F.No.15/3/2018 -Trans -Pt(1)) 2. Above mentioned scheme was recommended for de -notification in 21st meeting of National Committee on Transmission (NCT), held on 06.08.2024. As such, above scheme, i ncluding its scope is hereby de -notified. [F. No. 15/3/2018 -Trans -Part(4) ] NAOREM INDRAKUMAR SINGH , Under Sec y. Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Maya puri, New Delhi -110064 and Published by the Control ler of Pub lications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free