Full Text
6293 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 3889 ] NEW DEL HI, FRIDAY , SEPTEMBER 2 7, 2024 /ASVINA 5, 194 6
CG-DL-E-27092024-257557
MINISTRY OF COAL
NOTIFICATION
New Delhi, the 27th September, 2024
S.O. 4247 (E).—Whereas by the notification of the Government of India in the Ministry of Coal number
S.O. 4942(E) , dated the 14th November, 202 3, issued under sub -section (1) of section 7 of the Coal Bearing Areas
(Acquisition and Development) Act, 1957 (20 of 1957) (hereinafter referred as to the said Act) , and published in the
Gazette of India, Extraordinary, Part II, Section 3, Sub -section (ii), dated the 16th November, 2023, the Central
Government gave notice of its intension to acquire 4.21 hectares (approximately) or 10.4 0 acres (approximately) the
land and all rights in or over such land describ ed in the Schedule annexed to that notification;
And whereas the competent authority in pursuance of section 8 of the said Act has made his report to the
Central Government;
And whereas the Central Government , after considering the aforesaid report and after consulting the
Government of West Bengal, is satisfied that the lands measuring 4.21 hectares (approximately) or 10.40 acres
(approximately) and all rights in or over such land as described in Sch edule appended hereto should be acquired;
Now, therefore, in exercise of the powers conferred by sub-section (1) of section 9 of the said Act, the
Central Government hereby declares that all rights in or over the land measuring 4.21 hectare s (approximately) or
10.40 acres (approximately) as described in the Schedule are hereby acquired.
The plan bearing number GM/JNR/LAND/2024 -25/CBA(Sec 9)/205 dated 11th June, 2024 of the area
covered by this notification may be inspected in the office of the Collector, District Paschim Burdwan (W est Bengal )
or in the office of the Coal Controller , Coal Controller’s Organization, Ministry of Coal, Scope Minar, 5th Floor, Core
II, Laxmi Nagar, Delhi 110092 or in the Office of the Director Technical (Project and Planning), Eastern Coalfields
Limited, Sanctoria, Post Office Dishergarh, District Paschim Bardhaman 713333 , West Bengal .
SCHEDULE
Name of the Coal Mining Block : North and Central Bankola Block and Konardihi Block
District: Paschim Bardhaman, State: West Bengal
[Plan bearing number GM/JNR/LAND/2024 -25/CBA(SEC 9)/205 dated the 11th June, 2024]
All Rights:
Sl.
No. Name of Mouza JL Number PS District Area (In hectares) Remarks
1. Chakbabahal
17 Andal Paschim
Bardhaman 2.31 Part
2. Konardihi
14 Pandaveswar Paschim
Bardhaman 1.90 Part
Total 4.21 Ha .
(Approx.)
Total area: 4.21 hectares (approximately) or 10.40 acres (approximately)
1. Plots to be acquired in Mouza – Chakbanbahal, J.L.No. 17, P.S: Andal, RS Plot Nos. 340(P) and 357(P).
2. Plots to be acquired in Mouza – Konardihi, J.L.No. 14, P.S: Pandaveswar, RS Plot Nos. 2872(P), 1914(P),
1917(P) and 1919(P).
Boundary Description:
The plots to be acquired lie within the polygons A 1A2A3A4A5A6A7A8A9A1, B1B2B3B4B1, C1C2C3C4C1,
D1D2D3D4D5D1, E1E2E3E4E1 and F 1F2F3F4F1 as mentioned in the Plan No. GM/JNR/LAND/2024 -25/CBA(Sec -9)/205
dated 11.06.2024 The plots lie in mouzas Chakbanbahal and Konardihi under Andal and Pandaveswar Block. The
aforesaid polygons are described below: -
Polygon - A1A2A3A4A5A6A7A8A9A1:
1) Line A 1-A2: The line starts from the point A 1 on the common boundary of mouzas Ckakbanbahal, J.L.
no. 17 and Ckakbakala, J.L. no. 19. , runs towards east up to the point A 2 across the middle of the R.S.
Plot no.340 of the mouza Ckakbanbahal, J.L. no. 17.
2) Line A 2-A3: The line starts from the point A 2, runs towards north -east up to the point A 3 within the R.S.
Plot no.340 of the mouza Ckakbanbahal, J.L. no. 17.
3) Line A 3-A4: The line starts from the point A 3, runs towards south -east up to the point A 4 within the R.S.
Plot no.340 of the mouza Ckakbanbahal, J.L. no. 17.
4) Line A 4-A5: The line starts from the point A 4, runs towards east up to the point A 5 on the common
boundary of the R.S. Plot no.339 and 340 of the mouza Ckakbanbahal, J.L. no. 17.
5) Line A 5-A6: The line starts from the point A 5, runs towards north -east along the common boundary of
R.S. Plot nos. 339 & 340 of the mouza Ckakbanbahal, J.L. no. 17 and ends on the common boundary of
R.S. Plot nos. 339 and 340 of the mouza Ckakbanbahal, J.L. no. 17 at point A 6.
6) Line A 6-A7: The line starts from the point A 6, runs towards east up to the point A 7 within the R.S. Plot
no.340 of the mouza Ckakbanbahal, J.L. no. 17.
7) Line A 7-A8: The line starts from the point A 7, runs towards south up to the point A 8 within the R.S. Plot
no.340 of the mouza Ckakbanbahal, J.L. no. 17.
8) Line A 8-A9: The line starts from the point A 8, runs towards east up to the point A 9 on the common
boundary of mouzas Ckakbanbahal , J.L. no. 17 and Ckakbakala, J.L. no. 19.
9) Line A 9-A1: The line starts from the point A 9, runs towards south -west up to the point A 1.
Polygon B1B2B3B4B1:
1) Line B 1-B2: The line starts from the point B 1 situated on the common boundary line of R.S. Plot nos. 355
and 357 of mouza Chakbanbahal, runs towards south -east and ends at the point B 2 on the common
boundary of R.S. Plot no. 357 of mouza Chakbanbahal and R.S.Plot no.256 of mouza Shyamsundarpur,
J.L. no. 16.
2) Line B 2-B3:- The line starts from the point B 2, runs towards north up to B 3 which is situated on the tri -
juction of the R.S. Plot nos. 355 and 357 of mouza Chakbanbahal, J.L. no. 17 and R.S. Plot no. 256 of
mouza Shyamsundarpur, J.L. no. 16.
3) Line B 3-B4:- The line starts from the point B 3, runs towards west up to the point B 4 on the common
boundary of the R.S. Plot nos. 355 and 357 of mouza Chakbanbahal, J.L. no. 17.
4) Line B 4-B1:- The line starts from the point B 4, runs towards south -west up to the point B 1.
Polygon - C1C2C3C4C 1:
1) Line C 1-C2: The line starts from the point C 1 on the common boundary of the R.S. Plot nos. 2872 and
2875 of mouza Konardihi, J.L. no. 14, runs towards north -east across R.S.Plot no. 2872 of mouza
Konardihi, J.L. no. 14 up to the point C 2 on the common boundary of the R.S. Plot nos. 2872 and 2873
of mouza Konardihi, J.L. no. 14.
2) Line C 2-C3: The line starts from the point C 2, runs towards north -west up to the point C 3 on the
common boundary of the R.S. Plot nos. 2872 and 2873 of mouza Konardihi, J.L. no. 14.
3) Line C 3-C4: The line starts from the point C 3, runs towards south -west across R.S.Plot no. 2872 of
mouza Konardihi, J.L. no. 14 up to the point C 4 on the common boundary of mouzas Konardihi, J.L.
no. 14 and Shyamsundarpur, J.L. no.16.
4) Line C 4-C1: The line strats from the point C 4, runs towards south -east up to the point C 1.
Polygon - D1D2D3D4D5D1:
1) Line D 1-D2: The line starts from the point D 1 on the common boundary of R.S.Plot nos. 2993 and 1914
of mouza Konardihi, J.L.no. 14, runs towards north -east across R.S. Plot no. 1914 up to the point D 2 on
the common boundary of R.S. Plot nos. 1914 and 1916 of mouza Konardihi, J.L.no. 14.
2) Line D 2-D3: The line starts from the point D 2, runs towards north -west up to the point D 3on the common
boundary of R.S. Plot nos. 1914 and 1916 of mouza Konardihi, J.L.no. 14.
3) Line D 3-D4: The line starts from the point D 3, runs towards south -west across the R.S.Plot no. 1914 up
to the point D 4on the common boundary of R.S. Plot nos. 1914 and 1916 of mouza Konardihi, J.L.
no. 14.
4) Line D 4-D5: The line starts from the point D 4, runs eastwards up to the point D 5 on the common
boundary of R.S. Plot nos. 1914 and 2993 of mouza Konardihi, J.L.no. 14.
5) Line D 5-D1: The line starts from the point D 5, runs southwards up to the point D 1.
Polygon - E1E2E3E4E1:
1) Line E 1-E2: The line starts from the point E 1 on the common boundary of R.S.Plot nos. 1916 & 1917 of
mouza Konardihi, J.L.no. 14, runs towards north -east across R.S. Plot no. 1917 up to the point E 2 on
the common boundary of R.S. Plot nos. 1917 and 1918 of mouza Konardihi, J.L.no. 14.
2) Line E 2-E3: The line starts from the point E 2, runs towards north -west up to the point E 3along the
common boundary of R.S. Plot nos. 1917 and 1919 of mouza Konardihi, J.L.no. 14.
3) Line E 3-E4: The line starts from the point E 3, runs towards south -west across R.S.Plot no. 1917 of
mouza Konardihi, J.L.no. 14 up to the point E 4on the common boundary of R.S. Plot nos. 1917 and
1916 of mouza Konardihi, J.L.no. 14.
4) Line E 4-E1: The line starts from the point E 4, runs towards south -east along the common boundary of
R.S. Plot nos. 1917 and 1916 of mouza Konardihi, J.L.no. 14 and closes on the point E 1.
Polygon - F1F2F3F4F1:
1) Line F 1-F2: The line starts from the point F 1 on the common boundary of R.S.Plot nos. 1918
and 1919 of mouza Konardihi, J.L.no. 14, runs towards north -east across R.S. Plot no. 1919 up to
the point F 2 on the common boundary of R.S. Plot nos. 1919 and 1920 of mouza Konardihi, J.L.
no. 14.
2) Line F 2-F3: The line starts from the point F 2, runs towards north -west up to the point F 3 along the
common boundary of R.S. Plot nos. 1919 and 1920 of mouza Konardihi, J.L.no. 14.
3) Line F 3-F4: The line starts from the point F 3, runs towards south -west across R.S.Plot no. 1919 of
mouza Konardihi, J.L.no. 14 up to the point F 4on the common boundary of R.S. Plot nos. 1918 and
1919 of mouza Konardihi, J.L.no. 14.
4) Line F 4-F1: The line starts from the point F 4, runs towards south -east along the common boundary
of R.S. Plot nos. 1918 and 1919 of mouza Konardihi, J.L.no. 14 and closes on the point F 1.
[F. No. 43015/ 6/2022 -LAIR]
SANJEEV KUMAR KASSI , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text