Core Purpose

The Central Government modifies the scope of an existing transmission scheme for renewable energy integration in Gujarat and notifies new transmission schemes for the Rajasthan REZ Phase-IV (Bikaner Complex) under the TBCB mode.

Detailed Summary

The Central Government, through S.O. 3256(E) and S.O. 3257(E), both dated June 19, 2026, and issued under sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), has taken two primary actions based on the 41st National Committee on Transmission's recommendations. S.O. 3256(E) modifies the scope of the 'Transmission system for Integration of Power from RE Projects in Lakadia REZ in Gujarat-Phase II (7500MW)' scheme, originally notified by S.O. 725(E) dated February 12, 2026. This modification details the establishment of a 765/400 kV and 400/220kV Lakadia-II substation near Chitrod, including specific MVA/MVAr capacities for ICTs, bus reactors, and sectionalizers, and adds/modifies the 140 km Lakadia-II - Halvad 765kV D/c line with associated bays and 240 MVAr switchable line reactors. S.O. 3257(E) notifies several new transmission schemes under the TBCB mode for the 'Rajasthan REZ Phase-IV (Part-6: 6 GW) (Bikaner Complex) (Bikaner-V: 6 GW) Transmission Plan,' divided into Parts A, B, C, and D. Each part has a 36-month implementation period, with REC Power Development and Consultancy Limited (RECPDCL) as the Bid Process Coordinator. These schemes involve establishing multiple 765/400 kV and 400/220 kV pooling stations and substations (e.g., Bikaner-V, Pallu, Panipat, Mohali, Bulandshahr, Lucknow-II, Asana) across Rajasthan, Gujarat, Haryana, Uttar Pradesh, and Punjab. Key elements include various ICTs, bus reactors (e.g., 2x240 MVAr 765kV, 2x125 MVAr 420kV), switchable line reactors (e.g., 240 MVAr, 330 MVAr, 80 MVAr), MSC, MSR, STATCOM units, and numerous transmission lines such as the 135 km 765 kV Bikaner-V PS – Pallu 2xD/c line, 260 km 765 kV Pallu-Panipat 2xD/c line, 160 km 400 kV Panipat S/s – Mohali D/c line, 330 km 765 kV Bulandshahr - Lucknow-II D/c line, and 350 km 765 kV Lucknow-II-Asana D/c line, along with LILO arrangements. General conditions for BPCs include Right of Way (RoW) optimization as per CEA's Committee report dated September 24, 2024, utilizing monopole tower structures in urban/semi-urban or anticipated RoW issue areas, and route finalization via the PM Gati Shakti portal and physical survey. The notification is signed by NAOREM INDRAKUMAR SINGH, Under Secy.(Transmission).

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-24062026-273789 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 3132] | NEW DELHI, FRIDAY, JUNE 19, 2026/JYAISTHA 29, 1948 4524 GI/2026 | (1) 2 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II—SEC. 3(ii)] Scheme Name | Modification in scope/implementation timeframe of the scheme Gujarat-Phase II (7500 MW) Transmission system for Integration of Power from RE Projects in Lakadia REZ | Sl. No. | Scope of Transmission Work | Capacity/km | 1. | Establishment of 765/400 kV, 6x1500MVA & 10x500MVA, 400/220kV Lakadia-II (Near Chitrod) with 2x330 MVAR 765kV Bus reactor and 2x125 MVAR 400kV Bus reactor. [765kV, 400kV & 220kV levels to be established in two sections with Sectionaliser arrangement. The 220kV Sectionaliser shall be kept normally open and may be closed under contingency condition. The 400kV and 765kV Sectionaliser shall be kept normally closed. The bus operation may be reviewed after proposed HVDC implementation as per requirement of Grid operator. (3x1500MVA 765/400kV ICTs, 5x500MVA 400/220kV ICTs, 1x330MVAr 765kV BR & 1x125MVAr 420kV BR shall be on Sec-I & 3x1500MVA 765/400kV ICTs, 5x500MVA 400/220kV ICTS, 1x330MVAr 765kV BR & 1x125MVAr 420kV BR shall be on Sec-II)] | • 765/400 kV, 1500 MVA ICT – 6 Nos. (19x500 MVA single phase units including one spare ICT Unit) | | | • 400/220 kV ICTs - 10 Nos. (5 on Sec-I & 5 on Sec-II) | | | • 765 kV ICT bays – 6 Nos. | | | • 400 kV ICT bays – 16 Nos. | | | • 220kV ICT bays – 10 Nos. | | | • 1x330 MVAr, 765 kV bus reactor- 2 Nos. (7x110 MVAR single phase Reactors including one spare Unit for bus /line reactor) (1 on Sec-I & 1 on Sec-II) | | | • 765 kV Bus reactor bay – 2 Nos. | | | • 765kV line bays: 6 nos. (4 Nos. on Sec-I (2 for Halvad D/c & 2 for Ahmedabad D/c) and 2 Nos. on Sec-II (for Vataman)) | | | • 765 kV Sectionaliser bay: 1 -set | | | • 400 kV Sectionaliser bay: 1- set | | | • 220 kV Sectionaliser bay: 1- set | | | • 220kV BC-2 Nos. | | | • 220kV TBC – 2 Nos. | | | • 1x125 MVAr, 420 kV bus reactor- 2 Nos. (1 on Sec-I & 1 on Sec-II) | | | • 400 kV Bus reactor bay- 2 Nos. | | | • 400 kV line bays - 3 Nos. (2 nos. on Section-I & 1 No. on Sec-II for interconnection of RE Projects) | | Future provision (space for): | | | ➤ 765 kV line bays along with | [PART II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 3 | switchable line reactor - 8 Nos. (2 Nos. on Sec-I & 6 Nos. on Sec-II) | interconnection of RE Projects) | ➤ 765 kV Bus Reactor along with bay: 2 (Section-I पर 1 और Section-II पर 1) | | ➤ 400 kV line bays along with switchable line reactor - 7 (Section-I पर 3 और Section-II पर 4) | | ➤ 420 kV, 125MVAr Bus Reactor along with bays: 2 (Section -I पर 1 और Section-II पर 1) | | ➤ 220 kV line bays: Section -I पर 1 और Section-II पर 1 | | ➤ Synchronous Condenser (+300/-200MVAr) along with 400kV bay – 2 (Section -I पर 1 और Section-II पर 1) | 3. | Lakadia-II - Halvad 765kV D/c line | 140 km. (280ckm) 3a. | 2 Nos. 765 kV line bays at Halvad S/s for Lakadia-II - Halvad 765kV D/c line | 765 kV line bays – 2 Nos. (AIS) 3b. | • 765 kV, 240 MVAr Switchable line reactors on Lakadia-II end of Lakadia-II - Halvad 765 kV D/c line | • 240 MVAr, 765 kV Switchable Line Reactor- 2 Nos. (2 for Lakadia-II end) | | | • 765 kV Switchable Line Reactor bay - 2 Nos. for Lakadia-II end | | | • 80 MVAr spare single-phase reactor at Lakadia-II as proposed under Sl. 9 for above 240 MVAr Switchable Line Reactor shall be utilized. | | [F. No. 15/3/2018-Trans-Part(4)] | | NAOREM INDRAKUMAR SINGH, Under Secy.(Transmission) NOTIFICATION New Delhi, the 19th June, 2026 S.O. 3256(E). — In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government had notified following scheme, for implementation under TBCB mode, vide Gazette Notification mentioned below: SI. No. | Name of the Scheme | Gazette Notification by which Scheme was notified 1. | Transmission system for Integration of Power from RE Projects in Lakadia REZ in Gujarat-Phase II (7500MW) | S.O. 725(E) dated 12.02.2026 [F. No. 34-15/3/2026-Trans] 2. | Now, the Central Government, on the recommendations of 41st National Committee on Transmission has decided to modify the scope of above mentioned scheme. As such, the scope mentioned at Sl. No.1 and 3 of above scheme is hereby modified and Sl No. 3a and 3b are added as mentioned below; other scopes of the Transmission Scheme and Bid Process Co-ordinator shall remain unchanged: Name of the Scheme | Modification in scope/ implementation timeframe of the scheme Transmission system for Integration of Power from RE Projects in Lakadia REZ in Gujarat-Phase II (7500MW) | Sl. No. | Scope of the Transmission Scheme | Capacity/km | 1. | Establishment of 765/400 kV, 6x1500MVA & 10x500MVA, 400/220kV Lakadia-II (Near Chitrod) with 2x330 MVAR 765kV Bus reactor and 2x125 MVAR 400kV Bus reactor. [765kV, 400kV & 220kV levels to be established in two sections with Sectionaliser arrangement. The 220kV Sectionaliser shall be kept normally open and may be closed under contingency condition. The 400kV and 765kV Sectionaliser shall be kept normally closed. The bus operation may be reviewed after proposed HVDC implementation as per requirement of Grid operator. (3x1500MVA 765/400kV ICTs, 5x500MVA 400/220kV ICTs, 1x330MVAr 765kV BR & 1x125MVAr 420kV BR shall be on Sec-I & 3x1500MVA 765/400kV ICTs, 5x500MVA 400/220kV ICTS, 1x330MVAr 765kV BR & 1x125MVAr 420kV BR shall be on Sec-II)] | • 765/400 kV, 1500 MVA ICT – 6 Nos. (19x500 MVA single phase units including one spare ICT Unit) | | | • 400/220 kV ICTs - 10 Nos. (5 on Sec-I & 5 on Sec-II) | | | • 765 kV ICT bays – 6 Nos. | | | • 400 kV ICT bays – 16 Nos. | | | • 220kV ICT bays – 10 Nos. | | | • 1x330 MVAr, 765 kV bus reactor- 2 Nos. (7x110 MVAR single phase Reactors including one spare Unit for bus /line reactor) (1 on Sec-I & 1 on Sec-II) | | | • 765 kV Bus reactor bay – 2 Nos. | | | • 765kV line bays: 6 nos. (4 Nos. on Sec-I (2 for Halvad D/c & 2 for Ahmedabad D/c) and 2 Nos. on Sec-II (for Vataman)) | | | • 765 kV Sectionaliser bay: 1 -set | | | • 400 kV Sectionaliser bay: 1- set | | | • 220 kV Sectionaliser bay: 1- set | | | • 220kV BC-2 Nos. | | | • 220kV TBC – 2 Nos. | | | • 1x125 MVAr, 420 kV bus reactor- 2 Nos. (1 on Sec-I & 1 on Sec-II) | | | • 400 kV Bus reactor bay- 2 Nos. | | | • 400 kV line bays - 3 Nos. (2 nos. on Section-I & 1 No. on Sec-II for interconnection of RE Projects) | | Future provision (space for): | | | ➤ 765 kV line bays along with | [PART II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 5 | switchable line reactors - 8 Nos. (2 Nos. on Sec-I & 6 Nos. on Sec-II) | • 220 kV line bays - 15 Nos. (7 nos. on Sec-I & 8 nos. on Sec-II for interconnection of RE Projects) | ➤ 765 kV Bus Reactor along with bay: 2 Nos. (1 on Sec-I & 1 on Sec-II) | | ➤ 400 kV line bays along with switchable line reactors- 7 Nos. (3 on Sec-I & 4 on Sec-II) | | ➤ 420 kV, 125MVAr Bus Reactor along with bays: 2 Nos. (1 on Sec-I & 1 on Sec-II) | | ➤ 220 kV line bays: 2 No. on Sec-I & 1 Nos. on Section-II | | ➤ Synchronous Condenser (+300/-200MVAr) along with 400kV bay – 2 Nos. (1 on Sec-I & 1 on Sec-II) | 3. | Lakadia-II - Halvad 765kV D/c line | 140 km. (280ckm) 3a. | 2 Nos. 765 kV line bays at Halvad S/s for Lakadia-II - Halvad 765kV D/c line | 765 kV line bays – 2 Nos. (AIS) 3b. | • 765 kV, 240 MVAr Switchable line reactors on Lakadia-II end of Lakadia-II - Halvad 765 kV D/c line | • 240 MVAr, 765 kV Switchable Line Reactor- 2 Nos. (2 for Lakadia-II end) | | | • 765 kV Switchable Line Reactor bay - 2 Nos. for Lakadia-II end | | | • 80 MVAr spare single-phase reactor at Lakadia-II as proposed under Sl. 9 for above 240 MVAr Switchable Line Reactor shall be utilized. | | [F. No. 15/3/2018-Trans-Part(4)] | | NAOREM INDRAKUMAR SINGH, Under Secy.(Transmission) NOTIFICATION New Delhi, 19th June, 2026 S.O. 3257(E). — In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government on the recommendations of 41st meeting of National Committee on Transmission, hereby notifies the following transmission schemes under TBCB mode, with details of respective Bid-Process Coordinator (BPC): - 1. Rajasthan REZ Phase-IV (Part-6: 6 GW) (Bikaner Complex) (Bikaner-V: 6 GW) Transmission Plan - Part A 6 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)] Implementation period: 36 months BPC: REC Power Development and Consultancy Limited (RECPDCL) Scope: Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 1 | Establishment of 765/400 kV, 6x1500 MVA & 400/220 kV, 10x500 MVA Bikaner-V Pooling Station along with 2x240 MVAr (765kV) & 2x125 MVAr (420kV) Bus Reactors at a suitable location near Bikaner | Bikaner-V PS - AIS | Future provisions (excl. scope of present scheme): | • 765/400 kV, 1500 MVA ICTs- 6 Nos. (19x500 MVA including one spare unit). | ➤ 765 kV line bays along with switchable line reactor - 4 | • 400/220 kV, 500 MVA ICTs-10 | ➤ 400 kV line bays along with switchable line reactor - 4 | • 765 kV line bays - 4 (for 765 kV interconnection with Pallu S/s). | ➤ 400 kV line bays – 4 | • 400 kV line bays -4 (for 400 kV Bikaner-II PS – Khetri 2xD/c line through LILO of a double circuit for 400 kV interconnection.) | ➤ 765 kV Bus Reactor along with bays – 1 | • 765 kV ICT bays-6 | ➤ 400 kV Bus Reactor along with bays – 1 | • 400 kV ICT bays-16 | ➤ 400/220 kV ICT along with bays - 2 | • 220 kV ICT bays-10 | ➤ 400 kV Sectionalization bays – 1 | • 240 MVAr Bus Reactor-2 (including one spare unit, total 7 × 80 MVAr) | ➤ 220 kV line bays for connectivity RE Applications - 4 | • 765 kV Bus Reactor bays- 2 | ➤ 220 kV Sectionalization bays – 2 sets. | • 125 MVAr Bus Reactor-2 | ➤ 220 kV BC (2) and TBC (2) | • 400 kV Bus Reactor bays- 2 | ➤ 1 Synchronous Condenser Unit * at 400 kV level along with one 400 kV bay. | • 400 kV line bays-3 (for RE interconnection). | *1 SynCon unit includes dynamic support of +300MVAr/-200MVAr (minimum) and short circuit contribution of 1200MVA (minimum) at PCC (inertia value (MW-secs) will be provided in RfP document). | • 220 kV line bays-10 (for RE interconnection). | | • 220 kV Sectionalization bays – 1 set. | | • 220 kV BC (2) and TBC (2) | | • 400 kV Sectionaliser bay – 1 set. 2 | MSC (4x125 MVAr) at Bikaner-V PS | MSC (4x125 MVAr) and | [भाग II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 7 | and MSR (2x125 MVAr) along with STATCOM (2x+300 MVAr). | STATCOM (2x+300 MVAr) | | • 400 kV line bays - 28 km. (LILO length), (LILO of one D/c of 400 kV Bikaner-II PS-Khetri 2xD/c line). 3 | LILO of one double ckt of 400kV Bikaner II PS- Khetri (Twin HTLS) 2xD/c line at Bikaner-V PS along with 50 MVAr switchable line reactor for each circuit at Bikaner-V PS end of 400kV Bikaner-V-Khetri section | • Bikaner-V PS end 420 kV, 50 MVAr switchable line reactors - 2 | | • Switching equipment for 420 kV, 50 MVAr switchable line reactors at Bikaner-V PS end - 2 4 | Establishment of 765/400 kV, 2x1500 MVA S/s at suitable location near Pallu (Distt. Hanumangarh) along with 2x240 MVAr (765kV) & 2x125 MVAr (420kV) Bus Reactors | Pallu S/s - AIS | Future provisions (excl. scope of present scheme): | • 765/400 kV, 1500 MVA ICTs- 2 Nos. (7x500 MVA including one spare unit). | ➤ 765 kV line bays along with switchable line reactor - 2 | • 765 kV line bays - 12 nos. (for 765 kV 2xD/c interconnection each with Bikaner-V PS, Panipat S/s and LILO of both ckts of 765 kV Bikaner - Moga D/c line). | ➤ 765/400 kV 1500 MVA ICTs- 2 Nos. | • 400 kV line bays - 2 nos. (for 400 kV interconnection with Hanumangarh S/s). | ➤ 400 kV line bays along with switchable line reactor - 4 | • 765 kV ICT bays - 2 nos. | ➤ 400 kV line bays – 4 | • 400 kV ICT bays - 2 Nos. | ➤ 765 kV Bus Reactor along with bays: 1 | • 240 MVAr Bus Reactor-2 Nos. (7x80 MVAr, including one spare unit) | ➤ 400 kV Bus Reactor along with bays: 1 | • 765 kV Bus Reactor bays-2 Nos. | ➤ 400 kV Sectionalization bays: 1 set | • 125 MVAr Bus Reactor-2 Nos. | ➤ 400/220 kV ICT along with bays-5 | • 400 kV Bus Reactor bays- 2 Nos. | ➤ 220 kV line bays - 8 | | ➤ 220 kV Sectionalization bay: 1 set | | ➤ 220 kV BC (2) and TBC (2) | | ➤ 2 Syncon units * at 220 kV level along with 220 kV bays. | | *1 SynCon unit includes +300MVAr/-200MVAr (minimum) dynamic support and 1200MVA (minimum) short circuit contribution at PCC (inertia value (MW-secs) will be provided in RfP document). | 8 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)] 5 | 765 kV Bikaner-V PS – Pallu 2xD/c line | Line Length -135 km 6 | LILO of both ckts of 765kV Bikaner – Moga D/c line at Pallu S/s along with 240MVAr switchable line reactor for each circuit at Pallu S/s end of 765kV Pallu-Moga D/c line | Line Length-10 km (LILO length) | | • 765 kV, 240 MVAr switchable line reactors at Pallu S/s end- 2 Nos. | | • Switching equipment for 765kV, 240MVAr switchable line reactors at Pallu S/s end – 2 Nos. 7 | 400 kV Pallu – Hanumangarh (RVPN) D/c (Quad) line | Line Length -92 km | | • 400kV line bays - 2 nos. (at Hanumangarh (RVPN) S/s) 2. Rajasthan REZ Phase-IV (Part-6: 6 GW) (Bikaner Complex) (Bikaner-V: 6 GW) Transmission Plan - Part B Implementation period: 36 months BPC: REC Power Development and Consultancy Limited (RECPDCL) Scope: Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 1 | Establishment of 765/400 kV, 3x1500 MVA S/s at suitable location near Panipat (Distt. Panipat) along with 2x240 MVAr (765kV) & 2x125 MVAr (420kV) Bus Reactors | Panipat S/s - GIS | Future provisions (excl. scope of present scheme): | • 765/400 kV 1500 MVA ICTs- 3 Nos. (10x500 MVA including one spare unit) | ➤ 765 kV line bays along with switchable line reactor -4 | • 765kV line bays –8 nos. (for 765kV 2xD/c interconnection each with Pallu S/s and Bulandshahr S/s) | ➤ 765/400 kV, 1500 MVA ICTs- 3 | • 400kV line bays 4 nos. (for 400kV interconnection with Mohali and Mandola S/s) | | • 765kV ICT bays – 3 nos. | | • 400 kV ICT bays- 3 Nos. | | • 240 MVAr Bus Reactor-2 Nos. (7x80 MVAr, including one spare unit) | | • 765 kV Bus reactor bays-2 Nos. | | • 125 MVAr Bus Reactor-2 Nos. | | • 400 kV Bus reactor bays- 2 Nos. [भाग II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 9 | ➤ 400 kV line bays along with switchable line reactor -4 | | ➤ 400 kV line bays – 4 | | ➤ 765 kV Bus Reactor along with bays – 1 | | ➤ 400 kV Bus Reactor along with bays – 1 | | ➤ 400 kV Sectionalization bays – 1 set. | | ➤ 400/220 kV ICT along with bays-5 | | ➤ 220 kV line bays – 8 | | ➤ 220 kV Sectionalization bays – 1 set. | | ➤ 220 kV BC – 2 | | ➤ MSC (4x125 MVAr) and MSR (2x125 MVAr) along with STATCOM (2x+300 MVAr) with 400 kV bays (2). | 2 | 765 kV Pallu-Panipat 2xD/c line along with 240 MVAr switchable line reactor for each circuit at each end | Length – 260 km | | • 765 kV, 240 MVAr switchable line reactors at Pallu S/s end – 4 Nos. | | • 765 kV, 240 MVAr switchable line reactors at Panipat S/s end – 4 Nos. | | • Switching equipment for 765 kV, 240 MVAr switchable line reactors at Pallu S/s end – 4 Nos. | | • Switching equipment for 765 kV, 240 MVAr switchable line reactors at Panipat S/s end – 4 Nos. 3 | Establishment of 400/220kV, 4x500 MVA S/s at suitable location near Mohali (Distt. Mohali district) along with 2x125 MVAr (420kV) Bus Reactors | Mohali S/s - GIS | Future provisions (excl. scope of present scheme): | • 400kV line bays – 4 nos. (for 400kV interconnection with Panipat S/s & LILO of one circuit of 400kV Patiala-Panchkula D/c line) | ➤ 400 kV line bays along with switchable line reactor - 4 | • 400/220kV ICTs – 4 nos. | ➤ 400 kV line bays – 2 | • 400kV ICT bays – 4 nos. | | • 220 kV ICT bays- 4 Nos. 10 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)] | ➤ 400 kV Bus Reactor along with bays – 1 | • 125 MVAr Bus Reactor-2 | ➤ 400/220 kV ICT along with bays-1 | • 400 kV Bus reactor bays- 2 | ➤ 400 kV Sectionalization bays – 1 set. | • 220 kV line bays - 6 | ➤ 220 kV line bays – 4 | • 220 kV Bus Coupler bay-1 | ➤ 220 kV Sectionalization bays – 1 set. | | ➤ 220 kV BC- 1 | 400/220 ICTs and 220kV line bays are implemented to meet PSTCL drawl requirement | ➤ MSC (4x125 MVAr) and MSR (2x125 MVAr) along with STATCOM (2x+300 MVAr) with 400 kV bays (2). | 4 | LILO of one circuit of 400kV Patiala-Panchkula D/c line at Mohali (Twin HTLS*) | Length-20 km (LILO length) (Twin HTLS) | * with minimum capacity of 2100 MVA on each circuit at Nominal voltage | 5 | 400 kV Panipat S/s – Mohali D/c (Quad Moose) line along with 80 MVAr (420kV) switchable line reactor for each circuit at Mohali end | Line Length-160km (Quad) | | • 420 kV, 80 MVAr switchable line reactors at Mohali S/s end- 2 Nos. | | • Switching equipment for 420kV, 80MVAr switchable line reactors at Mohali S/s end – 2 Nos. 6 | 400 kV Panipat S/s – Mandola D/c (Quad) line | Line Length-70km (Quad) | | • 400kV line bays at Mandola S/s – 2 nos. 3. Rajasthan REZ Phase-IV (Part-6: 6 GW) (Bikaner Complex) (Bikaner-V: 6 GW) Transmission Plan - Part C Implementation period: 36 months BPC: REC Power Development and Consultancy Limited (RECPDCL) Scope: [भाग II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 11 Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 1 | Establishment of 765 kV S/s at suitable location near Bulandshahr (Distt. Bulandshahr) along with 2x330 MVAr (765kV) Bus Reactors | Bulandshahr S/s – AIS | Future provisions (excl. scope of present scheme): | • 765kV line bays –10 nos. (for 765kV 2xD/c interconnection with Panipat S/s, 765kV D/c interconnection with Lucknow-II S/s & Noida sec-148 (UPPTCL) S/s and LILO of 765kV Aligarh – Gr. Noida line) | ➤ 765 kV line bays along with switchable line reactor - 4 | • 330 MVAr Bus Reactor-2 Nos. (7x110 MVAr, including one spare unit) | ➤ 765/400 kV, 1500 MVA ICTs- 4 | • 765 kV Bus reactor bays-2 Nos. | ➤ 400 kV line bays along with switchable line reactor - 4 | | ➤ 400 kV line bays – 4 | | ➤ 765 kV Bus Reactor along with bays – 1 | | ➤ 400 kV Bus Reactor along with bays – 1 | | ➤ 400 kV Sectionalization bays – 1 set. | | ➤ 400/220 kV ICT along with bays-5 | | ➤ 220 kV line bays – 8 | | ➤ 220 kV Sectionalization bays – 1 set. | | ➤ 220 kV BC (2) and TBC (2) | | ➤ MSC (4x125 MVAr) and MSR (2x125 MVAr) along with STATCOM (2x+300 MVAr) with 400 kV bays (2). | 2 | 765 kV Panipat- Bulandshahr 2xD/c line along with 240 MVAr switchable line reactor for each circuit at Bulandshahr end | Line Length-155 km | | • 765 kV, 240 MVAr switchable line reactors at Bulandshahr S/s end- 4 Nos. | | • Switching equipment for 765kV, 240MVAr switchable line reactors at Bulandshahr S/s end – 4 Nos. | | • 1x80 MVAr, 765kv reactor spare unit 12 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)] Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 3 | LILO of 765kV Aligarh – Gr. Noida line at Bulandshahr S/s | Length-35 km (LILO length) 4 | 765kV Bulandshahr - Noida sec-148 (UPPTCL) D/c line | Line Length- 65 km | | • 765kV line bays (GIS) at Noida sec-148 S/s(UPPTCL) – 4 nos. (incl. 2 bays for dia completion). 5 | Establishment of 765/400 kV, 2x1500 MVA Lucknow-II S/s at suitable location near Lucknow along with 2x330 MVAr (765kV) & 2x125 MVAr (420kV) Bus Reactors | Lucknow-II S/s – AIS | Future provisions (excl. scope of present scheme): | • 765/400 kV 1500 MVA ICTs- 2 Nos. (7x500 MVA including one spare unit) | ➤ 765 kV line bays along with switchable line reactor -8 | • 765kV line bays –4 nos. (for 765kV D/c interconnection each with Asana & Bulandshahr S/s) | ➤ 765/400 kV 1500 MVA ICTs- 4 | • 400kV line bays - 2 nos. (for 400kV interconnection with Gonda (UPPTCL) S/s) | ➤ 400 kV line bays along with switchable line reactor -4 | • 765kV ICT bays – 2 nos. | ➤ 400 kV line bays – 4 | • 400 kV ICT bays- 2 Nos. | ➤ 765 kV Bus Reactor along with bays – 1 | • 330 MVAr Bus Reactor-2 Nos. (7x110 MVAr, including one spare unit) | ➤ 400 kV Bus Reactor along with bays – 1 | • 765 kV Bus reactor bays-2 Nos. | ➤ 400 kV Sectionalization bays – 1 set | • 125 MVAr Bus Reactor-2 Nos. | ➤ 400/220 kV ICT along with bays-5 | • 400 kV Bus reactor bays- 2 Nos. | ➤ 220 kV line bays – 8 | | ➤ 220 kV Sectionalization bays – 1 set. | | ➤ 220 kV BC (2) and TBC (2) | | ➤ 2 Syncon units * at 400 kV level along with 2 400 kV bays | | *1 SynCon unit comprises dynamic support of +300MVAr/-200MVAr (Minimum) & Short circuit contribution at PCC of 1200MVA (Minimum)) (Value of inertia (MW-secs) shall be provided in RfP document) | 6 | 765 kV Bulandshahr - Lucknow-II D/c line along with 330 MVAr switchable line reactor for each circuit at each end | Line Length- 330km | | • 765 kV, 330 MVAr switchable line reactors at Bulandshahr S/s end- 2 Nos. | | • Switching equipment for 765kV, 330MVAr switchable line reactors at Bulandshahr S/s end – 2 Nos. | | • 765 kV, 330 MVAr switchable line reactors at Lucknow-II S/s end- 2 Nos. | | • Switching equipment for 765kV, 330MVAr switchable line reactors [PART II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 13 Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) | | at Lucknow-II S/s end – 2 Nos. 4. Rajasthan REZ Phase-IV (Part-6: 6 GW) (Bikaner Complex) (Bikaner-V: 6 GW) Transmission Plan - Part D Implementation period: 36 months BPC: REC Power Development and Consultancy Limited (RECPDCL) Scope: Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 1 | 400 kV Lucknow-II – Gonda D/c (Quad Moose) line | Line Length- 150km | | • 400kV line bays at Gonda S/s (AIS) (UPPTCL) – 2 nos. 2 | Establishment of 765/400 kV, 2x1500 MVA S/s at suitable location near Asana Village (Chandauli District) along with 2x330 MVAr (765kV) & 2x125 MVAr (420kV) Bus Reactors | Asana (Chandauli) S/s – AIS | Future provisions (excl. scope of present scheme): | • 765/400 kV 1500 MVA ICTs- 2 Nos. (7x500 MVA including one spare unit) | ➤ 765 kV line bays along with switchable line reactor -6 | • 765kV line bays –4 nos. (for 765kV D/c interconnection each with Lucknow-II S/s & Nawada) | ➤ 765/400 kV 1500 MVA ICTs- 4 | • 400kV line bays – 4 nos. (for LILO of both ckts of 400kV Varanasi – Biharsharif D/c line) | ➤ 400 kV line bays along with switchable line reactor -4 | • 765kV ICT bays – 2 nos. | ➤ 400 kV line bays – 4 | • 400 kV ICT bays- 2 Nos. | ➤ 765 kV Bus Reactor along with bays: 1 | • 330 MVAr Bus Reactor-2 Nos. (7x110 MVAr, including one spare unit) | ➤ 400 kV Bus Reactor along with bays: 1 | • 765 kV Bus reactor bays-2 Nos. | ➤ 400 kV Sectionalization bays: 1 set | • 125 MVAr Bus Reactor-2 Nos. | ➤ 400/220 kV ICT along with bays-5 | • 400 kV Bus reactor bays- 2 Nos. | ➤ 220 kV line bays -8 | | ➤ 220kV Sectionalization bay: 1 set | | ➤ 220 kV BC (2) & TBC (2) | | ➤ 2 Syncon units * at 400kV level along with 2 400kV bays | | *1 No. of SynCon unit comprises dynamic support of +300MVAr/-200MVAr (Minimum) & Short circuit contribution at PCC of 1200MVA (Minimum)) (Value of inertia (MW-secs) shall be provided in RfP document) | 14 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)] Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 3 | 765 kV Lucknow-II-Asana D/c line along with 330 MVAr switchable line reactor for each circuit at each end | Line Length- 350km | | • 765 kV, 330 MVAr switchable line reactors at Asana S/s end- 2 Nos. | | • Switching equipment for 765kV, 330MVAr switchable line reactors at Asana S/s end – 2 Nos. [भाग II-खण्ड 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 15 Sl. No. | Description of Transmission Element | Scope of work (Type of Substation/Conductor capacity/km/no. of bays etc.) 4 | LILO of both ckts of 400kV Varanasi – Biharsharif D/c line at Asana S/s along with 80 MVAr switchable line reactor for each circuit at Asana end of 400kV Asana- Biharsharif section | Length-35km (LILO length) | | • 420 kV, 80 MVAr switchable line reactors at Asana S/s end- 2 Nos. | | • Switching equipment for 420kV, 80MVAr switchable line reactors at Asana S/s end – 2 Nos. 5 | Asana - Nawada 765kV D/c line along with 330MVAr switchable line reactors in each circuits at Asana end | Line Length - 215km | | • 765KV line bays at Nawada S/s (AIS) – 2 nos. | | • 765 kV, 330 MVAr switchable line reactors at Asana S/s end- 2 Nos. | | • Switching equipment for 765kV, 330MVAr switchable line reactors at Asana S/s end – 2 Nos. 5. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by Ministry of Power in this regard, amended from time to time. 6. BPCs shall ensure RoW optimization as per the CEA's Committee report dated 24.09.2024 for calculation of reduction of Right of Way (RoW) Width through Technological Options. 7. Monopole tower structures, insulated cross arms and other RoW corridor optimization measures to be adopted in urban/ semi-urban areas. 8. Monopole tower structures to be used where RoW issues are anticipated, while lattice towers shall be used in other sections. 9. Other RoW optimization measures to be taken in forest/ hilly-terrain areas other than use of monopole. 10. Further, the route must be finalised after validation on PM Gati Shakti portal and physical survey. [F. No. 34-15/3/2026-Trans] NAOREM INDRAKUMAR SINGH, Under Secy.(Transmission) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054. KUMER CHAND MEENA | Digitally signed by KUMER CHAND MEENA | Date: 2026.06.24 | 16:04:52 +05'30'

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free