REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-23092025-266305
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4104]
NEW DELHI, THURSDAY, SEPTEMBER 18, 2025/BHADRA 27, 1947
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 17th September, 2025
S.O. 4221(E).— In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines
circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the
recommendations of 32nd meeting of National Committee on Transmission, hereby notifies the following
transmission schemes under TBCB mode, with details of respective Bid-Process Coordinator (BPC): -
+-----+---------------------------------------------+-------------------------------------------------------------+
| Sl. | Name & Scope of the Transmission Scheme | Capacity (MVA) / Line length (km)/Nos. |
| No. | | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 1. | WR-ER Inter-Regional Network Expansion | |
| | Scheme-Part A | |
| | Tentative implementation timeframe: 24 | |
| | months from the date of allocation | |
| | BPC: REC Power Development and Consultancy | |
| | Limited | |
| | Scope: | |
| +-----+---------------------------------------+-------------------------------------------------------------+
| | Sl. | Scope of works | Capacity (MVA) / Line length (km)/Nos. |
| | No. | | |
| +-----+---------------------------------------+-------------------------------------------------------------+
| | 1. | Establishment of 2x1500 MVA, 765/400 kV | •765/400 kV, 2x1500 MVA ICT (7x500 MVA |
| | | S/s at Jamshedpur (New) in Jharkhand | single phase units) |
| | | Additional space for future expansion:| • 765 kV, 2x330 MVAr bus reactor (7x110 |
| | | ➤ 765/400 kV, 4x1500 MVA | MVAr single phase units) |
| | | (12x500 MVA single phase units) | • 420 kV, 125 MVAr bus reactor: 2 Nos. |
| | | ICTs along with associated ICT bays | • 765 kV ICT bays: 2 Nos. |
| | | at both voltage levels | • 765 kV Bus reactor bays: 2 Nos. |
| | | ➤ 400/220 kV, 6x500 MVA ICTs along | • 400 kV ICT bays: 2 Nos. |
| | | with associated ICT bays at both | • 400 kV Bus reactor bays: 2 Nos. |
| | | voltage levels | • 765 kV line bays: 6 Nos. (2 Nos. for |
| | | ➤ 765 kV, 2x330 MVAr (6x110 MVAr | Jamshedpur - Tamnar 765 kV D/c line and 4 Nos. |
| | | single phase units) bus reactor | for LILO of Ranchi (New) – Medinipur 765 kV |
| | | along with associated bay | D/c line) |
| | | ➤ 420 kV, 1x125 MVAr bus reactor | • 400 kV line bays: 4 Nos. [for LILO of Ranchi |
| | | along with associated bay | (New) – New PPSP 400 kV D/c line] |
| | | ➤ 765 kV line bays (along with space | • 765 kV, 330 MVAr |
| | | for switchable line reactor) for | (3x110 MVAr single phase units) switchable line |
| | | future lines: 8 Nos. | reactor along with associated bays in each circuit |
| | | ➤ 400 kV line bays (along with space | of Raigarh (Tamnar) – Jamshedpur 765 kV D/c |
| | | for switchable line reactor) for | line |
| | | future lines: 10 Nos. | |
| | | ➤ 220 kV line bays for future lines: | |
| | | 12 Nos. | |
| | | ➤ 765 kV bus sectionaliser bay: 1 set | |
| | | ➤ 400 kV bus sectionaliser bay: 1 set | |
| | | ➤ 220 kV bus sectionaliser bay: 1 set | |
| | | ➤ 220 kV bus coupler bay: 2 set | |
| | | ➤ 220 kV transfer bus coupler bay: 2 | |
| | | set | |
| +-----+---------------------------------------+-------------------------------------------------------------+
| | 2. | Establishment of 3x1500 MVA, 765/400 kV | |
| | | S/s (on 765 kV Bus section-II & 400 kV | |
| | | Bus Section-II) at Raigarh (Kotra)-II S/s | |
| | | in Chhattisgarh with 2x330 MVAR, 765 kV | |
| | | bus reactor and 2x125 MVAR, 420 kV bus | |
| | | reactor (on 765 kV Bus section-II & 400 | |
| | | kV Bus Section-II) | |
| +-----+---------------------------------------+-------------------------------------------------------------+
| | 2A. | Additional space for future expansion:| Common Transmission System Augmentation: |
| | | ➤ Creation of 1100 kV level | • 765 kV, 2x330 MVAr bus reactor (7x110 MVAr |
| | | ➤ 1100 kV bus sectionaliser bay: 1 set| single phase units) |
| | | (to establish Sec-I & Sec-II) | |
| | | ➤ 400 kV bus sectionaliser bay :3 sets| • 420 kV, 125 MVAr bus reactor: 2 Nos. |
| | | (to establish Sec-I, Sec-III & Sec- | • 765 kV Bus reactor bays: 2 Nos. |
| | | IV) | • 400 kV Bus reactor bays: 2 Nos. |
| | | ➤ 1100/400 kV, 6x3000 MVA | • 765 kV line bays: 6 Nos. (2 Nos. for Raigarh |
| | | (19x1000 MVA single phase units) | (Tamnar) - Raigarh (Kotra)-II 765 kV D/c line |
| | | ICTs along with associated ICT bays. | and 4 Nos. for LILO of Dharamjaygarh (Sec-B) – |
| | | • 1100 kV side: 3 Nos. on Bus Sec-I & | Jharsuguda (Sec-A) 765 kV D/c line) |
| | | 3 Nos. on Bus Sec-II) | • 765 kV, 240 MVAr (3x80 MVAr single phase |
| | | • 400 kV side: 3 Nos. on Bus Sec-III & | units) switchable line reactor along with |
| | | 3 Nos. on Bus Sec- IV) | associated bays in each circuit of Raigarh (Kotra)- |
| | | ➤ 1100 kV line bays (along with space | II - Jharsuguda (Sec-A) 765 kV D/c section along |
| | | for switchable line reactor) for | with 1x80 MVAr 765 kV spare reactor |
| | | future lines: 12 Nos. (6 Nos. on Bus | |
| | | Sec-I & 6 Nos. on Bus Sec-II) | |
| | | ➤ 1200 kV, 4x660 MVAr (13 x 220 | |
| | | MVAR single phase units) bus reactor | |
| | | along with associated bays (2 Nos. | |
| | | on Bus Sec-I & 2 Nos. on Bus Sec-II) | |
| | | ➤ 765 kV bus sectionaliser bay: 1 set | |
| | | (to establish Sec-I) | |
| | | ➤ 765/400 kV, 5x1500 MVA (15 x 500 | |
| | | MVA single phase units) ICTs along | |
| | | with associated ICT bays | |
| | | • 765 kV side: 4 Nos. on Bus Sec-I & 1 | |
| | | No. on Bus Sec-II) | |
| | | • 400 kV side: 4 Nos. on Bus Sec-I & 1 | |
| | | No. on Bus Sec-II) | |
| | | ➤ 765 kV, 2x330 MVAr (6 x 110 | |
| | | MVAr single phase units) bus reactor | |
| | | along with associated bay (on Bus | |
| | | Sec-I) | |
| | | ➤ 420 kV, 6x125 MVAr bus reactor | |
| | | along with associated bay (2 on Bus | |
| | | Sec-I; 2 on Bus Sec-III & 2 on Bus | |
| | | Sec-IV) | |
| | | ➤ 765 kV line bays (along with space | |
| | | for switchable line reactor) for | |
| | | future lines: 6 Nos. (6 on Bus Sec- I)| |
| | | ➤ 400 kV line bays (along with space | |
| | | for switchable line reactor) for | |
| | | future lines: 22 Nos. (6 on Bus | |
| | | Sec- I; 4 on Bus Sec-II, 6 on Bus | |
| | | Sec-III & 6 on Bus Sec-IV) | |
| | | ➤ Establishment of 6000 MW, ± 800 kV | |
| | | Raigarh (Kotra-II) (HVDC) [LCC] | |
| | | terminal station (4x1500 MW) along | |
| | | with associated interconnections | |
| | | with 400 kV HVAC Switchyard | |
| | | (2x1500 MW on 400 kV Sec-III along | |
| | | with associated 4 No. bays & 2x1500 | |
| | | MW on 400 kV Sec-IV along with | |
| | | associated 4 No. bays) & all | |
| | | associated equipment (incl. filters)/| |
| | | bus extension, etc. | |
| +-----+---------------------------------------+-------------------------------------------------------------+
| | 2B. | | ATS incl. terminal bays identified for 2x800 |
| | | | MW Raigarh TPS of M/s APL (appl. |
| | | | No.2200001709): |
| | | | • 765/400 kV, 3x1500 MVA ICT (10x500 MVA |
| | | | single phase units) |
| | | | • 765 kV ICT bays: 3 Nos. |
| | | | • 400 kV ICT bays: 3 Nos. |
+-----+---------------------------------------------+-------------------------------------------------------------+
| | | • 400 kV line bays: 2 Nos. [for interconnectionof |
| | | 2x800 MW Raigarh TPS of M/s APL to Raigarh |
| | | (Kotra)-II 400 kV D/c line] |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 3. | Bypassing of Raigarh (Tamnar) – | • 10 km (Route length) |
| | Dharamjaygarh (Sec-B) 765 kV D/c line & | |
| | Raigarh (Kotra) – Raigarh (Tamnar) 765 kV | |
| | D/c line at Raigarh (Tamnar) S/s so as to | |
| | form Raigarh (Kotra) – Dharamjaygarh | |
| | (Sec-B) 765 kV D/c line | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 4. | LILO of Dharamjaygarh (Sec-B) – Jharsuguda | • LILO length ~40 km |
| | (Sec-A) 765 kV D/c line at Raigarh | |
| | (Kotra)-II S/s | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 5. | Raigarh (Tamnar)@ - Raigarh (Kotra)-II S/s | • 50 km |
| | 765 kV D/c line | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 6. | 765 kV, 330 MVAr switchable line reactor | • 765 kV, 330 MVAr switchable line reactors – 2 |
| | along with associated bays in each line of | Nos. |
| | Raigarh (Tamnar) – Jamshedpur 765 kV D/c | • Switching equipment for line reactors – 2 Nos. |
| | line at Raigarh (Tamnar) end | • 765 kV spare reactor: 1x110 MVAr |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 7. | Raigarh (Tamnar)@ - Jamshedpur (New) 765 | • 315 km |
| | kV D/c line | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 8. | LILO of Ranchi (New) – Medinipur 765 kV | • 51 km and 49 km |
| | D/c line at Jamshedpur (New) | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 9. | LILO of Ranchi (New) – New PPSP 400 kV D/c | • 63 km Twin Moose |
| | line at Jamshedpur (New) | • 63 km Twin HTLS |
| | (a) Jamshedpur (New) to LILO section | |
| | towards Ranchi (New) needs to be | |
| | implemented with Twin Moose | |
| | (b) Jamshedpur (New) to LILO section | |
| | towards New PPSP needs to be | |
| | implemented with Twin HTLS | |
| | (ampacity of single HTLS as 1574A at | |
| | nominal voltage) | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 10. | Installation of new 765/400 kV, 1x1500 MVA | • 765/400 kV, 1x1500 MVA (3x500 MVA single |
| | (3x500 MVA single phase units) ICT (3rd) at | phase units) ICT: 1 No. |
| | Jeerat (New) S/s of M/s POWERGRID | • 765 kV ICT bay: 1 No. |
| | Medinipur Jeerat Transmission Limited | • 400 kV ICT bay: 1 No. |
| | (PMJTL) along with associated bays at both | |
| | ends | |
+-----+---------------------------------------------+-------------------------------------------------------------+
Note:
1. @4 Nos. 765 kV line bays vacated at Raigarh (Tamnar) S/s after bypass arrangement mentioned at Sl.
No. 3 of the scope of works [i.e. bypassing of Raigarh (Tamnar) – Dharamjaygarh (Sec -B) 765 kV
D/c line & Raigarh (Kotra) – Raigarh (Tamnar) 765 kV D/c at Raigarh (Tamnar)] to be utilized for
termination of 765 kV lines at Raigarh (Tamnar) S/s i.e. 2 nos. for Raigarh (Tamnar) – Raigarh
(Kotra-II) 765 kV D/c proposed line and 2 nos. for Raigarh (Tamnar) – Jamshedpur (New) 765 kV
D/c proposed line.
2. After the implementation of subject bypassing arrangement at the outskirts of Raigarh (Tamnar) S/s,
the existing unutilized portions of Raigarh (Kotra) – Raigarh (Tamnar) and Raigarh (Tamnar) –
Dharamjaygarh (Sec-B) 765 kV D/c line sections at Raigarh (Tamnar) end may be utilized for
termination of proposed 765 kV D/c lines under the subject scheme i.e. proposed 765 kV D/c lines
may be terminated at bypassing points. This shall ensure utilization of existing ISTS transmission
infrastructure. However, if the said existing ISTS transmission line sections remain unutilized at
Raigarh (Tamnar) end, due to any reason, the same shall be dismantled by the TSP of the subject
scheme and cost of scrapped assets may be adjusted under subject transmission scheme. In both cases
(viz. utilization of existing line sections or its scarping), the original tariff of Raigarh (Tamnar) –
Dharamjaygarh (Sec-B) 765 kV D/c line & Raigarh (Kotra) – Raigarh (Tamnar) 765 kV D/c line
shall remain unaffected.
Also, TSP of Raigarh (Tamnar) S/s shall provide space for above scope of work at the existing
Raigarh (Tamnar) S/s free of cost.
3. TSP shall implement Inter-tripping scheme on Dharamjaygarh (Sec-B) – Raigarh (Kotra)-II 765 kV
D/c line (for tripping of the switchable line reactor at Dharamjaygarh (Sec-B) end along with the
main line breaker).
4. TSP of the subject scheme shall implement Inter-tripping scheme on Raigarh (Kotra)-II –
Jharsuguda 765 kV D/c line (for tripping of the switchable line reactor at Raigarh (Kotra)-II end
along with the main line breaker).
5. LILO of Ranchi (New) – Medinipur 765 kV D/c line at Jamshedpur (New) shall be carried out
such that one circuit of Ranchi (New) – Jamshedpur (New) 765 kV D/c line and one circuit of
Jamshedpur (New) – Medinipur 765 kV D/c line are terminated in same diameter. Similarly,
second circuit of both line sections may also be terminated in bays of the same diameter.
6. LILO of Ranchi (New) – New PPSP 400 kV D/c line at Jamshedpur (New) shall be carried out
such that one circuit of Ranchi (New) – Jamshedpur (New) 400 kV D/c line and one circuit of
Jamshedpur (New) – New PPSP 400 kV D/c line are terminated in same diameter. Similarly,
second circuit of both line sections may also be terminated in bays of the same diameter.
7. M/s POWERGRID Medinipur Jeerat Transmission Limited (PMJTL) shall provide space for
above scope of work at the existing Jeerat (New) S/s free of cost.
2. WR-ER Inter-Regional Network Expansion Scheme-Part C
Tentative implementation timeframe: 31.03.2029
BPC: REC Power Development and Consultancy Limited
Scope:
+-----+---------------------------------------------+-------------------------------------------------------------+
| Sl. | Scope of works | Capacity (MVA) / Line length (km)/Nos. |
| No. | | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 1. | Jamshedpur (New) – Balasore 400 kV D/c | • 174 km |
| | (Quad) line | |
+-----+---------------------------------------------+-------------------------------------------------------------+
| 2. | Extension at Jamshedpur (New) 765/400 kV | • 400 kV line bays: 2 Nos. [for Jamshedpur – |
| | (ISTS) substation | Balasore 400 kV D/c (Quad) line] |
+-----+---------------------------------------------+-------------------------------------------------------------+
| Note: | |
| 1. | OPTCL shall implement 2 Nos. 400 kV line bays | |
| | along with 1x80 MVAr switchable line reactor | |
| | at its planned Balasore 400/220 kV S/s for | |
| | termination of Jamshedpur (New) – Balasore | |
| | 400 kV D/c (Quad) line. Balasore (OPTCL) | |
| | 400/220 kV S/s is yet to be awarded. | |
| | However, the expected commissioning schedule | |
| | is 31-03-2029, as per OPTCL. | |
| 2. | TSP of Jamshedpur (New) S/s [a new 765/400 kV | |
| | S/s being implemented under WR-ER Inter- | |
| | Regional Network Expansion Scheme-Part A | |
| | scheme] shall provide space for above scope | |
| | of work at Jamshedpur (New) S/s free of cost.| |
+-----+---------------------------------------------+-------------------------------------------------------------+
3. NERGS-III Siang Basin
Tentative implementation timeframe: 28.02.2029
BPC: PFC Consulting Limited
Scope:
+-----+---------------------------------------+-----------------------------------------------------------+
| Sl. | Scope of works | Capacity (MVA) / Line length (km)/Nos. |
| No. | | |
+-----+---------------------------------------+-----------------------------------------------------------+
| 1. | Establishment of new 2x500 MVA, | • 420 kV, 80 MVAr bus reactor: 2 Nos. |
| | 400/220 kV GIS Pooling station at | • 400 kV GIS Bus reactor bays: 2 Nos. |
| | Kaying in Arunachal Pradesh | • 400/220 kV, 500 MVA ICT: 2 Nos. |
| | Additional space for future expansion:| • 400 kV GIS ICT bays: 2 Nos. |
| | ➤ 400/220 kV, 2x500 MVA ICTs along | • 220 kV GIS ICT bays: 2 Nos. |
| | with associated ICT bays at both | • 220 kV bus coupler bay: 1 No. |
| | voltage levels | • 400 kV GIS line bays: 2 Nos. [for Kaying PS – |
| | ➤ 420 kV, 1x80 MVAr bus reactor along | Niglok PS 400 kV D/c (Quad) line] |
| | with associated bay | |
| | ➤ 10 Nos. of 400 kV line bays (along | |
| | with space for switchable line reactor) for | • 220 kV GIS line bays: 2 Nos. [for termination |
| | future lines | of DTL of 1840A or more per circuit] |
| | ➤ 8 Nos. of 220 kV line bays for future | • 420 kV, 50 MVAr switchable line reactor with |
| | lines | GIS bays: 2 Nos. [one in each circuit of Kaying |
| | ➤ 400 kV bus sectionaliser bay: 1 set | PS - Niglok PS 400 kV D/c (Quad) line] |
| | ➤ 220 kV bus sectionaliser bay :1 set | |
| | ➤ 220 kV bus coupler bay: 1 No. | |
+-----+---------------------------------------+-----------------------------------------------------------+
| 2. | Establishment of new 400 kV GIS | • 420 kV, 80 MVAr bus reactor: 2 Nos. |
| | Switching station at Niglok in | • 400 kV GIS Bus reactor bays: 2 Nos. |
| | Arunachal Pradesh (with a provision | • 400 kV GIS line bays: 4 Nos. [2 for Kaying PS |
| | for 400/220 kV level and 6000 MW | – Niglok PS 400 kV D/c (Quad) line & 2 for |
| | LCC HVDC station) | Niglok PS – Gogamukh 400 kV D/c (Quad) |
| | Additional space for future expansion:| line] |
| | ➤ Establishment of ± 800 kV, 6000 | • 420 kV, 50 MVAr switchable line reactor with |
| | MW, Niglok (HVDC) [LCC] terminal | GIS bays: 2 Nos. [one in each circuit of Niglok |
| | station (4x1500 MW) along with | PS - Gogamukh 400 kV D/c (Quad) line] |
| | associated interconnections with | |
| | 400 kV HVAC Switchyard & all | |
| | associated equipment (incl. filters)/| |
| | bus extension, etc. | |
| | ➤ 400/220 kV, 4x500 MVA ICTs along | |
| | with associated ICT bays at both | |
| | voltage levels | |
| | ➤ 420 kV, 1x80 MVAr bus reactor along | |
| | with associated bays | |
| | ➤ 12 Nos. of 400 kV line bays (along | |
| | with space for switchable line | |
| | reactor) for future lines | |
| | ➤ 8 Nos. of 220 kV line bays for future| |
| | lines | |
| | ➤ 400 kV bus sectionaliser bay: 1 set | |
| | ➤ 220 kV bus sectionaliser bay :1 set | |
| | ➤ 220 kV bus coupler bay: 2 Nos. | |
+-----+---------------------------------------+-----------------------------------------------------------+
| 3. | Extension at Gogamukh | • 400 kV line bays: 2 Nos. [for Niglok PS – |
| | 400/220/132 kV (ISTS) substation | Gogamukh PS 400 kV D/c (Quad) line] |
+-----+---------------------------------------------+-----------------------------------------------------------+
| 4. | Kaying PS – Niglok PS 400 kV D/c (Quad) | • 100 km |
| | line | |
+-----+---------------------------------------------+-----------------------------------------------------------+
| 5. | Niglok PS – Gogamukh 400 kV D/c (Quad) | • 125 km |
| | line | |
+-----+---------------------------------------------+-----------------------------------------------------------+
Note:
1. Gogamukh 400/220/132 kV (ISTS) S/s is under implementation under North Eastern Region
Expansion Scheme-XVI (NERES-XVI) scheme through TBCB route by M/s NERES XVI Power
Transmission Limited (wholly owned subsidiary of Techno Electric and Engineering Company
Limited). SCoD as per TSA is 30-11-2026.
2. M/s NERES XVI Power Transmission Limited shall provide space for above scope of work at under
implementation 400/220/132 kV Gogamukh S/s free of cost.
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the
Guidelines issued by Ministry of Power in this regard, amended from time to time.
3. BPCs shall ensure RoW optimization as per the CEA's Committee report dated 24.09.2024 for
calculation of reduction of Right of Way (RoW) Width through Technological Options.
4. Further, the route must be finalized after valikdation on PM Gati Shakti portal and physical survery
[F. No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secy.(Transmission)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. GORAKHA NATH Digitally signed by GORAKHA
YADAVA
NATH YADAVA
Date: 2025.09.23 16:06:33 +05'30'