Full Text
7181 GI/202 3 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 4743] NEW DELHI, THURS DAY , NOVEMBER 16, 2023/ KARTIKA 25, 1945
CG-DL-E-17112023-250098
(1) (2) (3)
पी2 26°47'42.37" उ 88°47'53.19" पू पजिम
पी3 26°45'42.52" उ 88°47'25.41" पू पजिम
पी5 26°47'52.27" उ 88°53'11.60" पू पूवा
क 27° 00'36.10" उ 88°50'57.09" पू
ख 26°56'28.70" उ 88°52'49.39" पू
ग 26°48'58.04" उ 88°47'39.56" पू
घ 26°47'52.29" उ 88°56'28.01" पू
च 26°41'09.30" उ 88°49'00.53" पू
मीटर शबं िु 26°53'9.35" उ 88°48'39.39" पू पर, सडक 26°53'21.32" उ 88°48'39.53” पू
क 27° 0'36.10" उ 88°50'57.09" पू 17.00 दकलोमीटर
ख 26°56'28.70" उ 88°52'49.39" पू 9.68 दकलोमीटर
घ 26°47'52.29" उ 88°56'28.01" पू 5.20 दकलोमीटर
1 27˚00'19.03" उ
2 27˚00'44.79" उ
3 27° 0'32.93" उ
4 26°56'38.50" उ
5 26°52'41.09" उ
6 26°51'35.23" उ
7 26°53'50.07" उ
8 26°50'41.98" उ
9 26°50'40.96" उ
10 26°50'35.77" उ
11 26˚47'52.40" उ
12 26°45'16.43" उ
13 26˚42'55.60" उ
14 26°42'39.52" उ
15 26°42'21.41" उ
16 26°42'8.29" उ
17 26˚41'34.69" उ
18 26°41'9.51" उ
19 26°40'14.53" उ
20 26°40'2.55" उ
21 26˚40'20.41" उ
22 26˚41'12.36" उ
23 26°42'37.00" उ
24 26°42'44.03" उ
25 26°41'11.05" उ
26 26˚41'42.44" उ
88˚46'15.24" पू
28 26°43'24.26" उ
29 26°44'13.33" उ
30 26˚44'23.72" उ
31 26°46'18.46" उ
32 26˚47'32.04" उ
33 26°47'57.19" उ
34 26˚49'00.00" उ
35 26°48'56.60" उ
36 26°48'59.22" उ
37 26°49'3.43" उ
38 26°49'3.56" उ
39 26°50'9.19" उ
40 26˚51'18.79" उ
41 26°52'48.66" उ
42 26˚53'05.51" उ
43 26°53'9.35" उ
44 26°53'4.29" उ
45 26°53'11.50" उ
46 26°53'21.24" उ
88°48'40.54" पू
48 26°55'59.96" उ
49 26°57'47.11" उ
50 26°58'43.21" उ
51 26°59'39.62" उ
MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE
NOTIFICATION
New Delhi, the 16th November, 2023
S.O.4952( E).—In supersession of the notification published vide number S.O. 1739 (E), dated 4th June
2020, the following draft which the Central Government proposes to issue in exe rcise of the powers conferred by sub -
section (1), read with clause (v) and clause (xiv) of sub -section (2) and sub -section (3) of section 3 of the Environment
(Protection) Act, 1986 (29 of 1986) is hereby published, as required under sub -rule (3) of rule 5 of the Environment
(Protection) Rules, 1986, for the information of the public likely to be affected thereby; and notice is hereby given that
the said draft notification shall be taken into consideration on or after the expiry of a period of sixty days fr om the date
on which copies of the Gazette containing this notification are made available to the public;
Any person interested in making any objections or suggestions on the proposals contained in this draft
notification may forward the same in writing, f or consideration of the Central Government within the period so
specified to the Secretary, Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, Jorbagh
Road, Aliganj, New Delhi -110 003, or send it to the e -mail address of the Mini stry at esz [email protected]
Draft Notification
WHEREAS, Gorumara National Park in Jalpaiguri distirct of West Bengal with an area of 79.45 square
kilometers, was notified by the State Government of West Bengal vide notification dated 1.1.1998 and is home to
about 55 Great Indian One Horned Rhinoceros, one of the last populations of the species globally;
AND WHEREAS, the National Park acts as a crucial corridor for the movement of the Indian Elephant and
harbours about 1000 Gaurs, Leopards along with other lesse r cats, numerous herbivores and about 300 species of
birds and about same number of butterflies, and has great significance in the forested landscape of Jalpaiguri district
along with its forest, riverine ecosystem and adjoining tea gardens and villages in cluding their diverse ethnicities;
AND WHEREAS , Gorumara National Park supports a number of species specified under Schedule -I of the
Wildlife (Protection) Act, 1972 (53 of 1972) that inter alia, includes the Great Indian One Horned Rhinoceros
(Rhinoceros u nicornis) , Indian Elephant ( Elephas maximus ), Gaur ( Bos gaurus ), Leopard ( Panthera pardus), Indian
Rock Python ( Python molurus ), Malayan Giant Squirrel ( Ratufa bicolor ), Leopard Cat ( Prionailurus bengalensis ),
Fishing Cat ( Prionailurus viverrinus ), Hill My na (Gracula religiosa ), Indian Peafowl ( Pavo cristatus ), Indian Grey
Hornbill ( Ocyceros birostris ), etc;
AND WHEREAS , for effective conservation and protection of this rich floral and faunal biodiversity of
Gorumara National Park, the extent of anthropogen ic pressure in the periphery of the park has to be regulated as the
immediate area adjoining this fragile ecosystem is ecologically sensitive and exert great impact on this Protected Area;
AND WHEREAS , the dynamic nature of main river systems of Murti and Jaldhaka along with their
tributaries and rivulets has a direct impact on the wildlife in the park; and therefore, it is necessary to conserve and
protect the areas around Gorumara National Park for i mprovement and development the wildlife habitat therein and in
the landscape;
AND WHEREAS, it is necessary to conserve and protect the area, surrounding the boundaries of Gorumara
National Park which are specified in paragraph 1 as Eco -sensitive Zone from ecological, environmental and
biodiversity point of view and to prohibit industries or class of industries and their operations and processes in the said
Eco-sensitive Zone;
NOW, THEREFORE, in exercise of the powers conferred by sub -section (1) and clauses (v) and (xiv) of
sub-section (2) and sub -section (3) of Section 3 of the Environment (Protection) Act 1986 (29 of 1986) (hereafter in
this notification referred to as the Environment Act) read with sub -rule (3) of rule 5 of the Environment (Protection)
Rules, 1986, the Central Government hereby notifies an area to an extent of varying from 1.0 kilometer to 17.0
kilometers from the boundary of Gorumara National Park, in Jalpaiguri district in the State of West Bengal as the
Eco-sensitive Zone (hereafter i n this notification referred to as the Eco -Sensitive Zone) details of which are as under,
namely: -
1. Extent and boundaries of Eco -Sensitive Zone -
(1) The Eco -Sensitive Zone shall be to an extent varying from 1.0 kilometer to 17.0 kilometers from the boun dary
of Gorumara National Park and the area of the Eco -sensitive Zone is approximately 278 Square kilometers.
(2) The boundary description of Gorumara National Park and its Eco -Sensitive Zone is appended in Annexure -I.
(3) The map of the Gorumara National Park demarcating Eco -Sensitive Zone on survey of India Maps is given in
Annexure -IIA, boundary details of Gorumara National Park and Eco -Sensitive Zone along with latitudes and
longitudes are appended as Annexure - II-B and Annexure -II- C; Geo Coordinate R eferences at Annexure -
II- D.
(4) List of important geo -coordinates of the Eco -Sensitive Zone and their shortest distance from the boundary of
Gorumara NP are given in Annexure III.
(5) The list of areas falling in the proposed Eco -Sensitive Zone is appen ded as Annexure -IVA and villages falling
under Eco -Sensitive Zone along with latitudes and longitudes is given in Annexure -IV-B.
2. Zonal Master Plan for Eco -Sensitive Zone -
(1) The State Government shall, for the purposes of the Eco -sensitive Zone prepare a Zonal Master Plan within a
period of two years from the date of publication of this notification in the Official Gazette, in consultation
with local people and adhering to the stipulations given in this notification for approval of the competent
authorit y in the State Government.
(2) The Zonal Master Plan for the Eco -sensitive Zone shall be prepared by the State Government in such manner
as is specified in this notification and also in consonance with the relevant Central and State laws and the
guidelines issued by the Central Government, if any.
(3) The Zonal Master Plan shall be prepared in consultation with the following Departments of the State
Government, for integrating the ecological and environmental considerations into the said plan: -
(i) Environment;
(ii) Forest and Wildlife;
(iii) Agriculture;
(iv) Revenue;
(v) Urban Development;
(vi) Tourism;
(vii) Rural Development;
(viii) Irrigation and Flood Control;
(ix) Municipality;
(x) Panchayati Raj; and
(xi) Public Works Department.
(4) The Zonal Master Plan shall not impose any restriction on the approved existing land use, infrastructure and
activities, unless so specified in this notification and the Zonal Master Plan shall factor in improvement of all
infrastructure and activities to be more efficient and eco -friendly.
(5) The Zonal Master Plan shall pro vide for restoration of denuded areas, conservation of existing water bodies,
management of catchment areas, watershed management, groundwater management, soil and moisture
conservation, needs of local community and such other aspects of the ecology and en vironment that need
attention.
(6) The Zonal Master Plan shall demarcate all the existing worshipping places, villages and urban settlements,
types and kinds of forests, agricultural areas, green area, such as, parks, horticultural areas, orchards, lakes
and other water bodies with supporting maps giving details of existing and proposed land use features.
(7) The Zonal Master Plan shall regulate development in Eco -sensitive Zone and adhere to prohibited and
regulated activities listed in the Table in paragr aph 4 and also ensure and promote eco -friendly development
for security of local communities’ livelihood.
(8) The Zonal Master Plan shall be co -terminus with the Regional Development Plan.
(9) The Zonal Master Plan so approved shall be the reference docume nt for the Monitoring Committee for
carrying out its functions of monitoring in accordance with the provisions of this notification.
(10) Pending preparation and approval of the Zonal Master Plan, any new developmental activities shall be
governed by provi sions specified at paragraph 6 of sub -para (1) and (2).
3. Measures to be taken by the State Government . - The State Government shall take the following measures for
giving effect to the provisions of this notification, namely: -
(1) Land use. – (a) Forests, horti culture areas, agricultural areas, parks and open spaces earmarked for
recreational purposes in the Eco -sensitive Zone shall not be used or converted into areas for commercial or
residential or industrial activities:
Provided that the conversion of agricul tural and other lands, for the purposes other than that specified
at part (a) above, within the Eco -sensitive Zone may be permitted on the recommendation of the Monitoring
Committee, and with the prior approval of the competent authority under Regional Tow n Planning Act and
other rules and regulations of the Central Government or the State Government as applicable and vide
provisions of this notification, to meet the residential needs of the local residents and for activities such as -
(i) widening and strengthe ning of existing roads and construction of new roads;
(ii) construction and renovation of infrastructure and civic amenities;
(iii) small scale industries not causing pollution;
(iv) cottage industries including village industries; convenience stores and local amenities s upporting
eco-tourism including home stay; and
(v) promoted activities given in paragraph 4:
Provided further that no use of tribal land shall be permitted for commercial and industrial
development activities without the prior approval of the competent author ity under Regional Town Planning
Act and other rules and regulations of the State Government and without compliance of the provisions of
article 244 of the Constitution or the law for the time being in force, including the Scheduled Tribes and
Other Tradit ional Forest Dwellers (Recognition of Forest Rights) Act, 2006 (2 of 2007):
Provided also that any error appearing in the land records within the Eco -sensitive Zone shall be
corrected by the State Government, after obtaining the views of Monitoring Commit tee, once in each case
and the correction of said error shall be intimated to the Central Government in the Ministry of Environment,
Forest and Climate Change:
Provided also that the correction of error shall not include change of land use in any case exce pt as
provided under this sub -paragraph;
(b) efforts shall be made to reforest the unused or unproductive agricultural areas with afforestation and
habitat restoration activities.
(2) Natural water bodies. -The catchment areas of all natural springs shall be id entified and plans for their
conservation and rejuvenation shall be incorporated in the Zonal Master Plan and the guidelines shall be
drawn up by the State Government in such a manner as to prohibit development activities at or near these
areas which are d etrimental to such areas.
(3) Tourism or eco -tourism. - (a) All new eco -tourism activities or expansion of existing tourism activities
within the Eco-sensitive Zone shall be as per the Tourism Master Plan for the Eco -sensitive Zone;
(b) the Tourism Master Plan shal l be prepared by the State Department of Tourism in consultation with the
State Departments of Environment and Forests;
(c) the Tourism Master Plan shall form a component of the Zonal Master Plan;
(d) the Tourism Master Plan shall be drawn based on the study of ca rrying capacity of the Eco -sensitive
Zone;
(e) the activities of eco -tourism shall be regulated as under, namely: -
(i) new construction of hotels and resorts shall not be allowed within one kilometre from the boundary
of the protected area or upto the extent of th e Eco -sensitive Zone, whichever is nearer;
Provided that beyond the distance of one kilometer from the boundary of the protected area till
the extent of the Eco -sensitive Zone, the establishment of new hotels and resorts shall be allowed
only in p re-defined and designated areas for eco -tourism facilities as per Tourism Master Plan;
(ii) all new tourism activities or expansion of existing tourism activities within the Eco -sensitive Zone
shall be in accordance with the guidelines issued by the Central Gov ernment and the eco -tourism
guidelines issued by the National Tiger Conservation Authority (as amended from time to time) with
emphasis on eco -tourism, eco -education and eco -development;
(iii) until the Zonal Master Plan is approved, development for tourism and expansion of existing tourism
activities shall be permitted by the concerned regulatory authorities based on the actual site specific
scrutiny and recommendation of the Monitoring Committee and no new hotel, resort or commercial
establishment construction shall be permitted within Eco -sensitive Zone area.
(4) Natural heritage. - All sites of valuable natural heritage in the Eco -sensitive Zone, such as the gene pool
reserve areas, rock formations, waterfalls, springs, gorges, groves, caves, points, walks, rides , cliffs, etc. shall
be identified and a heritage conservation plan shall be drawn up for their preservation and conservation as a
part of the Zonal Master Plan.
(5) Man -made heritage sites. - Buildings, structures, artefacts, areas and precincts of historical, architectural,
aesthetic, and cultural significance shall be identified in the Eco -sensitive Zone and heritage conservation
plan for their conservation shall be prepared as part of the Zonal Master Plan.
(6) Noise pollution. - Prevention and control of noise pollution in the Eco -sensitive Zone shall be carried out in
accordance with the provisions of the Noise Pollution (Regulation and Control) Rules, 2000 and its
amendments .
(7) Air pollution. - Prevention and control of air pollution in the Eco -sensitive Zone sha ll be carried out in
accordance with the provisions of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981) and
Environment (Protection) Act, 1986 and the rules made there under these Acts .
(8) Discharge of effluents. - The discharge of treated effluent in Eco -sensitive Zone shall be in accordance with
the provisions of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974) and Environment
(Protection) Act, 1986 and the rules made there under these Acts .
(9) Solid wastes. - Disposal an d Management of solid wastes shall be as under: -
(a) the solid waste disposal and management in the Eco -sensitive Zone shall be carried out in accordance
with the Solid Waste Management Rules, 2016, published by the Government of India in the Ministry of
Envi ronment, Forest and Climate Change vide notification number S.O. 1357 (E), dated the 8th April,
2016 and as amended from time to time ; the inorganic material may be disposed in an environmental
acceptable manner at site identified outside the Eco -sensitive Zone;
(b) the local authorities shall draw up plans for the segregation of solid wastes into biodegradable and non -
biodegradable components;
(c) (iii) the biodegradable material shall be recycled preferably through composting or vermiculture;
(d) (iv) the inorganic material may be disposed in an environmentally acceptable manner at site(s) identified
outside the Eco -sensitive Zone and no burning or incineration of solid wastes shall he permitted in the
Eco-sensitive Zone.
(10) Bio-Medical Waste. – Bio-Medical Waste Manag ement shall be as under: -
(a) the Bio -Medical Waste disposal in the Eco -sensitive Zone shall be carried out in accordance with the
Bio-Medical Waste Management Rules, 2016, published by the Government of India in the Ministry of
Environment, Forest and Climate Change vide notification number G.S.R. 343 (E), dated the 28th March,
2016;
(b) safe and Environmentally Sound Management of Bio -Medical Wastes in conformity with the existing
rules and regulations using identified technologies may be allowed within the Eco -sensitive Zone.
(11) Plastic waste management .- The plastic waste management in the Eco -sensitive Zone shall be carried out as
per the provisions of the Plastic Waste Management Rules, 2016, published by the Government of India in
the Ministry of Environment, Fo rest and Climate Change vide notification number G.S.R. 340(E), dated the
18th March, 2016, as amended from time to time .
(12) Construction and demolition waste management. - The construction and demolition waste management in
the Eco -sensitive Zone shall be car ried out as per the provisions of the Construction and Demolition Waste
Management Rules, 2016 published by the Government of India in the Ministry of Environment, Forest and
Climate Change vide notification number G.S.R. 317(E), dated the 29th March, 2016 , as amended from time
to time.
(13) E-waste. - The e - waste management in the Eco -sensitive Zone shall be carried out as per the provisions of
the E -Waste Management Rules, 2016, published by the Government of India in the Ministry of
Environment, Forest and C limate Change, as amended from time to time.
(14) Vehicular traffic. – The vehicular movement of traffic shall be regulated in a habitat friendly manner and
specific provisions in this regard shall be incorporated in the Zonal Master Plan and till such time as t he
Zonal Master plan is prepared and approved by the competent authority in the State Government, the
Monitoring Committee shall monitor compliance of vehicular movement under the relevant Acts and the
rules and regulations made thereunder.
(15) Vehicular pollu tion.- Prevention and control of vehicular pollution shall be incompliance with applicable
laws and efforts shall be made for use of cleaner fuels.
(16) Industrial units. – (a) On or after the publication of this notification in the Official Gazette, no new poll uting
industries shall be permitted to be set up within the Eco -sensitive Zone;
(b) only non -polluting industries shall be allowed within Eco -sensitive Zone as per the classification of
Industries in the guidelines issued by the Central Pollution Control B oard in February, 2016, as
amended from time to time, unless so specified in this notification, and in addition, the non -
polluting cottage industries shall be promoted.
(17) Protection of hill slopes. - The protection of hill slopes shall be as under: -
(a) the Zonal Master Plan shall indicate areas on hill slopes where no construction shall be permitted;
(b) construction on existing steep hill slopes or slopes with a high degree of erosion shall not be permitted
4. List of activities prohibited or to be regulated within Ec o-sensitive Zone -
All activities in the Eco -Sensitive Zone shall be governed by the provisions of the Environment Act and the rules
made there under including the Environmental Impact Assessment Notification, 2006 (or the latest notification)
and other ap plicable laws including the Forest (Conservation) Act, 1980 (69 of 1980), the Indian Forest Act, 1927
(16 of 1927), the Wildlife (Protection) Act 1972 (53 of 1972), and amendments made thereto and be regulated in
the manner specified in the Table below, na mely: -
TABLE
S. No. Activity Description
A. Prohibited Activities
1. Commercial mining, stone
quarrying and crushing units. (a) All new and existing mining (minor and major minerals), stone
quarrying and crushing units shall be prohibited with immediate
effect ex cept for meeting the domestic needs of bona fide local
residents including digging of earth for construction or repair of
houses within Eco - sensitive Zone;
(b) The mining operations shall be carried out in accordance
with the orders of the Hon’ble Supreme Cou rt, dated the 4th
August, 2006 in the matter of T.N. Godavarman Thirumulpad Vs.
UOI in W.P.(C) No.202 of 1995; dated 21st April, 2014 in the
matter of Goa Foundation Vs. UOI in W.P.(C) No.435 of 2012;
and dated the 28th April, 2023 in the matter of T.N. G odavarman
Thirumulpad Vs. UOI and in W.P.(C) No.202 of 1995.
2. Setting of industries causing
pollution (Water, Air, Soil, Noise,
etc.). No new or expansion of polluting industries in the Eco -sensitive
Zone shall be permitted. Pollution prevention technol ogies and noise
barriers should be installed by existing industries
3. Establishment of major
hydroelectric project. Prohibited.
4. Use or production or processing
of any hazardous substance. Prohibited.
5. Discharge of untreated effluents
in natural water bodies or land
area. Prohibited.
6. Setting up of saw mills. New or expansion of existing saw mills shall not be permitted within
the Eco -sensitive Zone.
7. Setting up of brick kilns. Prohibited.
8. Use of polythene bags. Prohibited.
9. Commercial use of fir ewood. Prohibited.
B. Regulated Activities
10. Commercial establishment of
hotels and resorts. No new commercial hotels and resorts shall be permitted within one
kilometer of the boundary of the Protected Area or upto the extent of
Eco-sensitive zone, which ever is nearer, except for small temporary
structures for Eco -tourism activities:
Provided that, beyond one kilometer from the boundary of the
protected Area or upto the extent of Eco -sensitive Zone whichever is
nearer, all new tourist activities or expan sion of existing activities
shall be in conformity with the Tourism Master Plan and guidelines
as applicable.
11. Construction activities. (a) New commercial construction of any kind shall not be permitted
within one kilometer from the boundary of the Protected Area or
upto extent of the Eco -sensitive Zone whichever is nearer:
Provided that, local people shall be permitted to undertake
construction in their land for their use including the activities
listed in sub -paragraph (1) of paragraph 3 as per building bye -
laws to meet the residential needs of the local residents:
Provided that the construction activity related to small scale
industries not causing pollution shall be regulated and kept at the
minimum, with the prior permission from the competent
authority as per applicable rules and regulations, if any.
(b) Beyond one kilometer it shall be regulated as per the Zonal
Master Plan.
12. Small scale non -polluting
industries. Non-polluting industries as per classification of industries issued by
the Central Pollution C ontrol Board in February, 2016, as amended
from time to time, and non -hazardous, small -scale and service
industry, agriculture, floriculture, horticulture or agro -based industry
producing products from indigenous materials from the Eco -sensitive
Zone shall be permitted.
13. Felling of trees. (a) There shall be no felling of trees in the forest or Government or
revenue or private lands without prior permission of the
competent authority in the State Government.
(b) The felling of trees shall be regulated in accordanc e with the
provisions of the concerned Central or State Act and the rules
made there under.
14. Collection of Forest Produce or
Non-Timber Forest Produce. Regulated under applicable laws.
15. Erection of electrical and
communication towers and laying
of cables and other
infrastructures. Regulated under applicable laws of underground cabling may be
promoted.
16. Infrastructure including civic
amenities. Taking measures of mitigation, as per applicable laws, rules and
regulation and available guidelines.
17. Widenin g and strengthening of
existing roads and construction of
new roads. Taking measures of mitigation with proper Environment Impact
Assessment , as per applicable laws, rules and regulation and available
guidelines.
18. Undertaking other activities
related to tourism like over flying
over the Eco -sensitive Zone area
by hot air balloon, helicopter,
drones, Microlites, etc. Regulated as per the applicable laws.
19. Protection of Hill Slopes and
river banks. Regulated as per the applicable laws.
20. Movement o f vehicular traffic at
night. Regulated for commercial purpose under applicable laws.
21. Ongoing agriculture and
horticulture practices by local
communities along with dairies,
dairy farming, aquaculture and
fisheries. Permitted as per the applicable laws for use of locals.
22. Discharge of treated waste
water/effluents in natural water
bodies or land area. The discharge of treated waste water or effluents shall be avoided to
enter into the water bodies and efforts shall be made for recycle and
reuse of treat ed waste water. Otherwise, the discharge of treated
waste water/effluent shall be regulated as per the applicable laws.
23. Commercial extraction of surface
and ground water. Regulated under applicable laws.
24. Establishment of large -scale
commercial livest ock and poultry
farms by firms, corporate and
companies. Regulated as per applicable laws except for meeting local needs.
25. Open Well, Bore Well, etc. for
agriculture or other usage. Regulated and the activity should be strictly monitored by the
appropriat e authority.
26. Solid Waste Management. Regulated as per the applicable laws.
27. Introduction of Exotic species. Regulated as per the applicable laws.
28. Eco-tourism. Regulated as per the applicable laws.
29. Commercial Sign boards and
hoardings. Regulated as p er the applicable laws.
C. Promoted Activities
30. Rain water harvesting. Shall be actively promoted.
31. Organic farming. Shall be actively promoted.
32. Adoption of green technology for
all activities. Shall be actively promoted.
33. Cottage industries includin g
village artisans, etc. Shall be actively promoted.
34. Use of renewable energy and
fuels. Bio-gas, solar light etc. shall be actively promoted.
35. Agro -Forestry. Shall be actively promoted.
36. Plantation of Horticulture and
Herbals. Shall be actively promot ed.
37. Use of eco -friendly transport. Shall be actively promoted.
38. Skill Development. Shall be actively promoted.
39. Restoration of Degraded Land/
Forests/ Habitat. Shall be actively promoted.
40. Environmental Awareness. Shall be actively promoted.
5. Monitor ing Committee for Monitoring the Eco -Sensitive Zone Notification -
For effective monitoring of the provisions of this notification under sub -section (3) of section 3 of the
Environment (Protection) Act, 1986, the Central Government hereby constitutes a Mon itoring Committee,
comprising of the following, namely: -
S.No. Constituent of the Monitoring Committee Designation
(i) Concerned District Collector ex-officio, Chairman;
(ii) A representative of Non -governmental Organization working in the
field of envi ronment and wildlife conservation (including heritage
conservation) to be nominated by the State Government for a period
not exceeding three years for each term.
Member;
(iii) An expert in the area of ecology and environment to be nominated
by the State Government from time to time every three years. Member;
(iv) An expert in Ecology from reputed institution or university of the
State. ex-officio , Member;
(v) A representative from State Public Works Department. ex-officio , Member;
(vi) A representativ e from State Pollution Control Board. ex-officio , Member;
(vii) The Divisional Forest Officer, in charge of Gorumara National Park ex-officio , Member -Secretary.
6. Functions of the Monitoring Committee –
(1) The Monitoring Committee shall, based on the actu al site -specific conditions scrutinise, the activities covered in
the Schedule to the notification of the Government of India in the erstwhile Ministry of Environment and Forest,
vide number S.O. 1533 (E), dated the 14th September, 2006, and are falling in the Eco -sensitive Zone, except for
the prohibited activities as specified in the Table under paragraph 4 thereof, and referred to the Central
Government in the Ministry of Environment, Forest and Climate Change or the State Environment Impact
Assessment A uthority, as the case maybe, for prior environmental clearances under the provisions of the said
notification.
(2) The activities not covered in the Schedule to the notification of the Government of India in the erstwhile Ministry
of Environment and For ests vide number S.O. 1533 (E), dated the 14th September, 2006 and falling in the Eco -
sensitive Zone, except for the prohibited activities as specified in the Table under paragraph 4 thereof, shall be
scrutinised by the Monitoring Committee based on the ac tual site -specific conditions and referred to the
concerned Regulatory Authorities.
(3) The Member -Secretary of the Monitoring Committee or the concerned Collector or the concerned Deputy
Conservator of Forests shall be competent to file complaint under s ection 19 of the Environment (Protection)
Act, 1986 against any person who contravenes the provisions of this notification.
(4) The Monitoring Committee may invite representative or expert from concerned Department, representative from
industry associatio ns or concerned stakeholders to assist in its deliberations depending on the requirements on
case to case basis.
(5) The Monitoring Committee shall submit the annual action taken report of its activities for the period up to the
31st March of every year b y the 30th June of that year to the Chief Wildlife Warden of the State in pro -forma
specified in Annexure -V, appended to this notification.
(6) The Central Government may give such directions in writing, as it deems fit, to the Monitoring Committee for
effective discharge of its functions.
7. Additional Measures: The Central Government and State Government may specify additional measures, if
any, for giving effect to provisions of this notification.
8. Supreme Court, etc. orders. The provisions of this noti fication shall be subject to the orders, if any passed
or to be passed by the Hon’ble Supreme Court of India or High Court or the National Green Tribunal.
[F. No. 25/24/2018/ESZ]
Dr. S. KERKETTA, Scientist ‘G’
Annexure I
Boundary Description of the Eco -Sensitive Zone of Gorumara National Park
North: Forests of Kalimpong Forest Division, up to Bhutan Border.
East: Along Jaldhaka River in the East, till the Siliguri -Alipurduar Railway line, further South along Eastern part
of Sulkapara Road, including the Forest of Diana Range, the Western side of Karbala Road, and then
Gairkata Road, up to Ramsai Forest under Nathua Range of Jalpaiguri Forest Division.
South: North of Hindustan More, Eastern side of Ramsai Road, cutting across to Kaoagap -Ramsai Road, alon g the
road till the irrigation canal and further along the canal till the Lataguri -Mal railway line.
West: Along the Mal -Lataguri Railway line from Lataguri, further north along the right Bank of the river Neora,
western edge of Baradighi tea garden, alon g eastern side of PMGSY road, Banglapara Road, Chorok Road
and southern side of Uttar Dhupjhora Road, Zilla parishad road to Panjhora Forest under Jalpaiguri division,
crossing NH -17, Siliguri -Alipurduar railwayline further North along Kilkote -Indong TG ro ad and then the
Murti River up to Kumai Forest.
Annexure II -A
Map of Eco -Sensitive Zone of Gorumara National Park and Gorumara National Park with Important Points
Annexure II -B
Important Geo coordinates of Gorumara National Park on its Boundary
Point Latitude Longitude Direction
P1 26°51'15.76"N 88°52'6.07"E North
P2 26°47'42.37"N 88°47'53.19"E West
P3 26°45'42.52"N 88°47'25.41"E West
P4 26°43'44.13"N 88°49'6.36"E South
P5 26°47'52.27"N 88°53'11.60"E East
Annexure II -C
Geo coordinates of t he Important Points on the Eco -Sensitive Zone Boundary of Gorumara National Park
A 27° 00'36.10"N 88°50'57.09"E
B 26°56'28.70"N 88°52'49.39"E
C 26°48'58.04"N 88°47'39.56"E
D 26°47'52.29"N 88°56'28.01"E
E 26°41'09.30"N 88°49'00. 53"E
Annexure II -D
Detailed description of the Boundary of the Eco -Sensitive Zone of Gorumara National Park along with
Important Geo Coordinate References
Extent Description
Northern From the point 27˚00'19.03" N 88˚50'28.69", then towards north -east up to 30m from the centre
of Naksa Khola (right bank) at point 27˚00'44.79" N 88˚51'12.58" E and then along Naksa Khola
up to Bhutan border till point 27˚00'32.44" N 88˚52'23.12" E.
Eastern Along Bhutan boundary from point 27˚00'32.44" N 88˚52'23.12" E to 2 6°56'28.70"N
88°52'49.39"E along the eastern side of River Jaldhaka till point 26°53'50.68"N 88°53'46.70"E
where it crosses the Siliguri - Alipurduar railway line and meets the Nagrakata -Sukhanibasty
road which connects to Sulkapara after crossing NH -17 and turns east at point 26°50'41.98"N
88°54'50.11"E up to Sulkapara Forest Rest house. Then towards east, crossing Gathiya River at
point 26°50'40.96"N 88°55'5.98"Efurther 2.72 km east on the same line up to point
26˚50'32.97" N 88˚56'30.16" E. Then , down towards South for 5km up to 26˚47'52.40" N
88˚56'27.81" E ,then along the western flank of Kalabari road, at 30m from the center of the
road, joining Gairkata Road up to Nathua Bazar at point 26˚42'55.60" N 88˚54'10.42" E and
then along Majhiali road at a distance of 30m up to point 26˚42'20.97" N 88˚53'21.86" E, then
along the connecting road via Ramsai Picnic spot up to the point 26˚41'34.69" N 88˚53'24.18"
E , and then towards east till 30m from center of Gairkata Road and further south u p to point
26˚40'14.04" N 88˚53'27.80" E.
Southern From point 26˚40'14.04" N 88˚53'27.80" E , towards western direction crossing Jaldhaka River,
and further west up to point 26˚40'20.41" N 88˚51'30.16" E , then along the road at 30 m
distance from the c enter of the road up to point 26˚41'12.36" N 88˚51'29.57" E , west up to
Ramsai Road, up to point 26˚42'37.02" N 88˚51'0.574" E, west up to Kaoagap road , south
along the road up to the canal at a distance of 30m. Further, 30m north from the centre of th e
canal, along the canal at a distance of 30m up to the point 26˚41'42.44" N 88˚46'35.60" E, then
east of the connecting road (30m distance from the centre of the road) up to the Lataguri -Mal
railway line at 26˚42'39.90" N 88˚46'15.24" E.
Western Towards west along the Lataguri -Mal railway line, at 30m from the centre of the line in eastern
side till the Rail bridge on Neora river up to point 26˚44'23.72" N 88˚45'29.91" E, and then along
the western bank of the Neora river at 200m from centre of the main stream till the point
26˚47'32.04" N 88˚45'16.83" E. The across Neora river till PMGSY road on the eastern side of
the river, crossing it at point 26˚49'00.00" N 88˚47'46.98" E, then along the PMGSY road (30m
distance from the centre of the road) then alon g Bangapara Road (30m distance from the centre
of the road), then along Uttar Dhupjhora road (30m distance from the centre of the road) up to
point 26˚50'10.29" N 88˚48'48.39" E, then further north along Zilla Parishad road (30m east
from the centre of th e road) till the point 26˚51'18.79" N 88˚49'12.79" E and then north up to
NH-17 via new Khunia Forest Village, crossing the railway line at the point 26˚53'05.51" N
88˚49'28.73" E. Further west for 1.34 km along 200m from the centre of the Siliguri - Alipur duar
Railway line towards the north, till the point 26°53'4.26"N 88°48'40.08"E and crossing Indong
TG- Kilkote TG road. Then, northwards, 30m from the centre of the kachha road at point
26°53'9.35"N 88°48'39.39"E, along the road till 26°53'21.32"N 88°4 8'39.53”E, and north east
till it meets the Indong -Kilkote TG road at point 26°53'33.13"N 88°48'53.28"E and along the
western side of the road till point 26°54'25.39"N 88°48'40.54"E, then further north for 2.78km
where the boundary turns east at point 26°55'59.59"N 88°48'42.06"E till it meets Murti River at
point 26°56'0.37"N 88°51'0.41"E. Then northwards along the western bank of River Murti till
the point 26°57'25.35"N 88°51'18.95"E, then upland touching the points 26°57'31.76"N
88°51'6.54"E and 26°57'39.38"N 88°51'0.02"E till point 26°57'45.79"N 88°50'56.23"E and
along the road till Kumani -Murti more. Along the eastern edge of Yongtong TG till the point
26°58'43.78"N 88°50'9.58"E where it crosses Murti River in North east direction to Kumani TG
Hospital at point 26°58'55.25"N 88°50'15.56"E and then along the road upto Kumai Power
House, 30m from the centre of the road on its eastern side. Then towards north along the
connecting road/path up to point 27˚00'19.03" N 88˚50'28.69" E.
Annexure III
Important Geo coordinates of ESZ around Gorumara National Park and their Distance from the Boundary of
the Gorumara National Park
Point Latitude Longitude Shortest Distance from the
Boundary
A 27° 0'36.10"N 88°50'57.09"E 17.00 km
B 26°56'28 .70"N 88°52'49.39"E 9.68 km
C 26°48'58.04"N 88°47'39.56"E 2.25 km
D 26°47'52.29"N 88°56'28.01"E 5.20 km
E 26°41'9.30"N 88°49'0.53"E 5.00 km
Annexure IV - A
LIST OF AREAS FALLING INSIDE ESZ AROUND GORUMARA N.P.
SN Name of PS Area JL No Area (Ha) Block Industry/ activities
1 Dhupguri Ramsai Forest II 50 486 Dhupguri Forest
2 Banarhat Jaldhaka -Altadanga TG 24 571.67775 Nagrakata Tea factory
3 Banarhat Dhumpara 26 515.1438 Nagrakata Mixed
4 Gorubathan Kumai Forest 1460 Gorubathan Forest
5 Gorubathan Kumai Khasmahal 36 310 Gorubathan Mixed
6 Nagrakata Nagrakata 7 100 Nagrakata Rural Habitation
7 Nagrakata Kalabari TG 27 418.03 Nagrakata Nil
8 Nagrakata Bamandanga TG 22 945.7236 Nagrakata Tea factory
9 Nagrakata Tandu TG 21 261.71505 Nagr akata Tea factory
10 Nagrakata Tandu 20 424.73565 Nagrakata Nil
11 Nagrakata Khairbari 19 691.76835 Nagrakata Nil
12 Nagrakata Sulkapara 18 419.59215 Nagrakata Nil
13 Nagrakata Sukhani Basti 8 356.31495 Nagrakata Nil
14 Nagrakata ChharTandu 17 432.977 4 Nagrakata Nil
15 Nagrakata Chalsa Forest 1 4690 Nagrakata Forest
16 Nagrakata Diana Forest 1430 Nagrakata Rly line
17 Maynaguri Ramsai Forest 3 1330 Maynaguri Forest
18 Maynaguri Ramsai 9 640.07415 Maynaguri Tourism
19 Maynaguri JadabpurTg 10 221.8428 Maynaguri Tea factory
20 Maynaguri Kaoa Gap 8 479.3823 Maynaguri Mixed
21 Maynaguri Uttar Kalamati 12 403.57845 Maynaguri Mixed
22 Maynaguri Panbari 5 1152.38295 Maynaguri Mixed
23 Maynaguri Dobbari 4 141.88365 Maynaguri Mixed
24 Matiali Indong TG 14 590 Matiali Tea factory
25 Matiali Kilkott TG 15 340 Matiali Tea factory
26 Matiali Chhaoa Phali 30 275.01525 Matali Mixed
27 Matiali Baradighi TG 23 744.39405 Matali Tea factory
28 Matiali Dakshin Dhupjhora 28 568.09755 Matali Tourism
29 Matiali Uttar Dhupjhora 27 405.44145 Matali Tourism
30 Matiali Mangalbari 17 246.4506 Matali Small rural habitation
31 Matiali Chalsa Mahabari 16 298.53765 Matali Tourism
32 Matiali PurbaBatabari 26 539.56125 Matali Tourism
33 Matiali Paschim Batabari 24 134.40665 Matali Tourism
34 Matiali Batabari TG 25 393.47775 Matali Tea factory
35 Mal Purba kantadighi Kumarpara 80 77.31855 Mal Nil
36 Mal Lataguri 81 272.8647 Mal Tourism
37 Mal Daksin Kantadighi Kumarpara 82 303.6852 Mal Nil
38 Mal Jhar Matiali 92 745.281 Mal Tourism
39 Mal Uttar Matiali 91 562.54905 Mal Tourism
40 Mal Lataguri Forest 31 3360 Mal Forest village
Total Area 27739.9037
*Mixed - Agriculture, small cottage industries, livestock rearing, residential areas, daily wage labou rers,
etc.
Annexure IV - B
LIST OF VILLAGES INSIDE ESZ AROUND GORUMARA N.P.
List of Villages with their GPS Details under Eco - Sensitive Zone of Gorumara National Park
Si
No. GPS Co -Ordinates Point particulars Area/Village JL no. Block
1 27˚00'19.03"N
88˚50'28.69" E Kumai T.G Kumai Village 36 Gorubathan
2 27˚00'44.79" N
88˚51'12.58" E Naksha Khola Kumai Village 36 Gorubathan
3 27° 0'32.93"N
88°52'21.28"E Jaldhaka River 1 - - Gorubathan
4 26°56'38.50"N
88°52'37.23"E Jaldhaka River 2 - - Gorubatha n
5 26°52'41.09"N
88°54'20.50"E Sukhani Busty Sukhani Busty 8 Nagrakata
6 26°51'35.23"N
88°54'45.90"E Khas Busty Khas Busty 8 Nagrakata
7 26°53'50.07"N
88°53'51.68"E Siliguri - Alipurduar railway
line Sulkapara Gram
Panchayat 8 Nagrakata
8 26°50'41.9 8"N
88°54'50.11"E Sulkapara Forest Rest House Sulkapara Gram
Panchayat 18 Nagrakata
9 26°50'40.96"N
88°55'5.98"E Gathia River Chhar Tandu 17 Nagrakata
10 26°50'35.77"N
88°56'34.15"E Point on River bed at Chhar
Tandu Chhar Tandu 17 Nagrakata
11 26˚47'52.40" N
88˚56'27.81" E Kalabari Angrabhasa I G.P 28 Nagrakata
12 26°45'16.43" N
88°55'6.58" E Dhumpara Angrabhasa I G.P 26 Nagrakata
13 26˚42'55.60" N
88˚54'10.42" E Gairkata Quadjuncture Nathuahat 24 Nagrakata
14 26°42'39.52"N
88°53'25.03" E Majhiali Busty Primary
School Nathuahat 24 Nagrakata
15 26°42'21.41"N
88°53'22.03"E Nathuahat Nathuahat 24 Banarhat
16 26°42'8.29"N
88°53'4.71"E Purba Dobbari Nathuahat 42 Banarhat
17 26˚41'34.69"N
88˚53'24.18" E Fataktari Nathuahat 42 Banarhat
18 26°41'9.51"N
88°53'21.22"E Bibadi Bagh Footbal ground Nathuahat 49 Dhupguri
19 26°40'14.53"N
88°53'27.43"E Gairkata Road Ramsai Forest 3 Banarhat
20 26°40'2.55"N
88°51'30.30"E Ramsai I Panbari 5 Maynaguri
21 26˚40'20.41" N
88˚51'30.16" E Ramsai II Panbari 5 Maynaguri
22 26˚41'12.36" N
88˚51'29.57" E Kamarghat Panbari 5 Maynaguri
23 26°42'37.00"N
88°51'5.83"E Panbari - Ramsai Road Kawagap 8 Maynaguri
24 26°42'44.03"N
88°50'1.64"E Panbari - Ramsai Road Kawagap 8 Maynaguri
25 26°41'11.05"N
88°49' 0.01"E Canal Road Ramsai 9 Maynaguri
26 26˚41'42.44" N
88˚46'35.60" E Jharmatialli Jharmatialli 92 Maynaguri
27 26˚42'39.90" N
88˚46'15.24" E Bichhabhanga I Comptt. Lataguri Forest 31 Mal
28 26°43'24.26"N
88°46'20.70"E Lataguri Flyover Lataguri Revenue
Area 81 Mal
29 26°44'13.33"N
88°45'39.94"E Neora River Rail Bridge Purba Kantadighi
Kumarpara 82 Mal
30 26˚44'23.72" N
88˚45'29.91" E Neora River Purba Kantadighi
Kumarpara 80 Mal
31 26°46'18.46"N
88°45'19.58"E Chhaoaphali Chhaoaphali 30 Mal
32 26˚47'32.04" N
88˚45'16.83" E Nich Chalsa Chhaoaphali 30 Mal
33 26°47'57.19"N
88°46'10.88"E Baradighi T.G Baradighi TG 23 Matalli
34 26˚49'00.00" N
88˚47'46.98" E Batabari Pharm More Purba Batabari 26 Matalli
35 26°48'56.60"N
88°48'13.71"E PMGSY 1 Purba Batabari 26 Matalli
36 26°48'59.22"N
88°48'17.37" E PMGSY 2 Purba Batabari 26 Matalli
37 26°49'3.43"N
88°48'16.45"E PMGSY 3 Purba Batabari 26 Matalli
38 26°49'3.56"N
88°48'20.40"E PMGSY 4 Purba Batabari 26 Matalli
39 26°50'9.19"N
88°48'49.29"E Zilla Parishad Road Uttar Dhupjhora 27 Matalli
40 26˚51'18.79"N
88˚49'12.79" E Indong F.V Road Mangalbari 17 Matalli
41 26°52'48.66"N
88°49'33.84"E New Khunia F.V Chalsa Mahabari 16 Matalli
42 26˚53'05.51" N
88˚49'28.73" E Railline Crossing Point Chalsa M ahabari 16 Matalli
43 26°53'9.35"N
88°48'39.39"E Kilcott Road Kilkott TG 15 Matalli
44 26°53'4.29"N
88°48'40.08"E Bagher Tari Busti Chalsa Mahabari 16 Matalli
45 26°53'11.50"N
88°48'40.48"E Padri Kuthi Busty Kilkott TG 15 Matalli
46 26°53'21.24"N
88°48'39.61"E Kilcott T.G I Kilkott TG 15 Matalli
47 26°54'25.39"N
88°48'40.54"E Kilcott T.G II Kilkott TG 15 Matalli
48 26°55'59.96"N
88°48'42.37"E Matelli Matialli Hat 12 Matalli
49 26°57'47.11"N
88°50'46.46"E Matelli T.G Moortee
Division Top Line Matialli T.G 10 Matalli
50 26°58'43.21"N
88°50'9.73"E Yongtong T.G Yongtong T.G 9 Gorubathan
51 26°59'39.62"N
88°50'45.46" E Kumai Khasmahal Kumai Khasmahal 36 Gorubathan
Annexure V
Performa of Action Taken Report
1. Number and date of meetings.
2. Minutes of the meetings: (mention noteworthy points. Attach minutes of the meeting as separate Annexure).
3. Status of preparation of Zonal Master Plan including Tourism Master Plan.
4. Summary of cases dealt with rectification of error apparent on face of land record (Eco -sensitive Zone wise).
Details may be attached as Annexure.
5. Summary of cases scrutinised for activities covered under the Environment Impact Assessment Notification,
2006 (Details may be attached as separate Annexure).
6. Summary of cases scrutinised for activities not covered under the Environment Impact Assessment
Notification, 2006 (Details may be attached as separate Annexure).
7. Summary of complaints lodged under section 19 of the Environment (Protection) Act, 1986.
8. Any other matter of importance.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text