Full Text
7467 GI/202 3 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 4927] NEW DELHI, FRIDAY , DEC EMBER 1, 2023/ AGRAHAYANA 10, 1945
CG-DL-E-04122023-250400
MINISTRY OF POWER
ORDER
New Delhi, the 1st December , 2023
S.O. 5152(E).—Whereas M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited), having its
registered office at JSW Centre, Bandra Kurla Complex, Bandra Ea st, Mumbai, Maharashtra – 400051, India, has
applied for authorization under Section 164 of the Electricity Act, 2003 for laying of overhead transmission line under
“Transmission system for providing connectivity to M/s JSW Neo Energy Limited (erstwhile JS W Future Energy
Limited) for its 150 MW Wind Power Plant in Tiruppur, Tamil Nadu”.
And whereas, Central Electricity Authority (CEA), Ministry of Power, Government of India vide its letter
CEA -PS-11-21/1/2021 -PSPA -I Division -Part(1)/I/25668/2023 dated 11.0 1.2023 had granted prior approval under
section 68(1) of the Electricity Act, 2003 for the overhead line covered under “Transmission system for providing
connectivity to M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited) for its 150 MW Wind P ower
Plant in Tiruppur, Tamil Nadu”.
M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited) has published notice for transmission
scheme in local newspapers Trinity Mirror (in English) dated 28.04.2023, Dakshin Bharat Rashtramat (in Hindi) dated
01.05.2023, Makkaal Kural (in Tamil) dated 28.04.2023 and in Weekly Gazette of India dated 17.06.2023 for the
general public to make observations/representations on the proposed transmission route within 2 Months from the date
of publication. Subsequently, M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited) has submitted an
affidavit dated 13.10.2023 declaring that no observation/representation was received within 2 months from the date of
Publication in the official gazette of Government of In dia.
And now the applicant has requested to confer upon him, all the powers under section 164 of the Electricity
Act, 2003, which the telegraph authority possess under the Indian Telegraph Act, 1885 with respect to the placing of
telegraph lines and posts for the purpose of a telegraph established or maintained by Government or to be so
established or maintained for laying of electric line under “Transmission system for providing connectivity to M/s
JSW Neo Energy Limited (erstwhile JSW Future Energy Limit ed) for its 150 MW Wind Power Plant in Tiruppur,
Tamil Nadu”. The following overhead line is covered under this scheme:
o 230 kV Single circuit line stringing on Double circuit tower from JSW Neo Energy Limited (erstwhile JSW
Future Energy Limited) generatio n switchyards to Karur PS (ISTS Substation).
The transmission line covered under the above scheme will pass through, over, around and between the
following villages, towns and cities of Tamil Nadu:
S. No. Name of Villages Tehsil District
1. Gurunathankot tai, Yellappalaiyam, Otappalayam. Tottiyampalaiyam,
Puliympatti, Vattakkalivalasu, Sanarpalaiyam, Nattapalaiyam,
Kulandaikavundanvalasu, Valliyappankavundavalasu,
Nainakavundanvalasu, Nainakavundanvalasu, Periyannakavundanvalasu,
Ayyampalaiyam, Kollapatti, Nochikattuvalasu, Peramiyam, Illaiyampatti ,
Molakkavundanpudur, Kumarakavundanvalasu, Kottaimulanu,
Nallikavundanpalaiyam, Mallipatti, Pammipalaiyam, Thulukkavalasu,
Chinniyakavundanvalasu, kumaraswamikottai, M.Kollapatti, Mambadi,
Thurampadi, Vettukadu privu, Mettur colony, Vanjipalaiyam,
Tottampalaiyam, Nallikavundanpalaiyamcolony, Kumarrayyapalaiyam,
Mettupatti, Vanjivalasu,Kottaimulanurcolony, Uttamakavundanvalasu,
karaivalasu, Parakkadai, Tulukkavalasu, Akkaraipalayam,
Nadhampalayam. Dharapuram Tirup pur
Now, after careful consideration, Ministry of Power, Government of India, under section 164 of the
Electricity Act, 2003, confers all the powers to M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited)
for laying above overhead line, which telegraph authority possesses under the Indian Telegraph Act, 1885 with respect
to placing of telegraph lines and posts for the purposes of a telegraph established or maintained, by Government or to
be established or maintained subject to following terms a nd conditions for installing the above mentioned line,
namely:
i. The approval is granted for 25 years.
ii. The Applicant shall have to seek the consent of the concerned authorities i.e., local bodies, Railways,
National Highways, State Highways etc. before erect ion of proposed line.
iii. The Applicant shall have to follow regulations/codes of the Appropriate Commission regarding transmission,
O&M, open access, etc., framed under Electricity Act, 2003.
iv. The Applicant shall operate the line after approval of Electrical I nspector / Chief Electrical Inspector of
Central Government.
v. The approval is subject to compliance of the requirement of the provisions of the Electricity Act, 2003 and
the rules made there under by the applicant.
vi. M/s JSW Neo Energy Limited (erstwhile JSW Future Energy Limited) shall have to submit the requisite
clearances to Central Electricity Authority after obtaining the same from concerned authorities like Civil
Aviation, Defense etc., at the time of Electrical Inspection.
[F. No. 25-16/24/2023 -PG]
M.V.N. VARA PRASAD , Under Secy . (PG)
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text