NEW DELHI, MONDAY, NOVEMBER 3, 2025/KARTIKA 12, 1947
No. 4812]
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 30th October, 2025
S.O. 4967(E).— In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated
under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the recommendations of
33rd meeting of National Committee on Transmission, hereby notifies the following transmission scheme under TBCB
mode, with details of Bid-Process Coordinator (BPC): -
SI No. Name & Scope of the Transmission Scheme
------------------------------------------------------------------------------------
1. Installation of 2 Nos. of Synchronous Condensers (SynCon) units at
765/400/220 kV Fatehgarh-II PS
Tentative implementation timeframe: 30 months from the date of allocation
BPC: PFC Consulting Limited
Scope:
+-----+----------------------------------------------+-------------------------------------------------------------+
| SI. | Description of Transmission Element | Scope of work
| No. | | (Type of Substation/Conductor capacity/km/No.
| | | of bays etc.)
+-----+----------------------------------------------+-------------------------------------------------------------+
| 1. | • 2 Nos. of Synchronous Condensers (SynCon) | • Synchronous Condenser units- 2 Nos.
| | units* at 400 kV level of 765/400/220 kV
| | Fatehgarh-II PS along with 2 Nos. of 400 kV | • 400 kV Bay- 2 Nos.
+-----+----------------------------------------------+-------------------------------------------------------------+
bays
Note:
*1 No. of SynCon unit comprises dynamic support of +300 MVAr/-200 MVAr (Minimum)
& Short circuit contribution at PCC of 1200 MVA (Minimum) (Value of inertia (MW-secs)
shall be provided in RfP document
1. POWERGRID shall provide space (free of cost) for 2 Nos. (SynCon) units at Fatehgarh- II PS along with
2 Nos. of 400 kV bays
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines
issued by Ministry of Power in this regard, amended from time to time.
3. BPCs shall ensure RoW optimization as per the CEA's Committee report dated 24.09.2024 for calculation of
reduction of Right of Way (RoW) Width through Technological Options.
4. Further, the route must be finalised after validation on PM Gati Shakti portal and physical survey.
[F. No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secretary (Transmission)