MINISTRY OF POWER
ORDER
New Delhi, the 27th February, 2026
S.O. 1108(E). Whereas M/s Torrent Solar Power Private Limited, the applicant with its registered office
at Samanvay, 600 Tapovan, Ambawadi, Ahmedabad-380015 (Gujarat), has applied for authorization under Section
164 of the Electricity Act, 2003 for laying of dedicated overhead transmission line included in the transmission system
for providing Connectivity for its RE Power Project in Koppal, Karnataka.
And whereas, Ministry of Power, Government of India vide its letter No. 25-17/114/2024-PG dated
23.12.2024 had granted prior approval under section 68(1) of the Electricity Act, 2003 for laying of overhead
transmission line included in the transmission scheme for providing connectivity to M/s Torrent Solar Power Pvt
Limited for its RE Power Project in Koppal, Karnataka.
M/s Torrent Solar Power Private Limited had published notice for transmission scheme in local newspapers,
The Times of India (in English) dated 09.08.2025& Rajasthan Patrika (in Hindi) dated 09.08.2025, Prajavani & Vijaya
Karnataka (in Kannada) dated 09.08.2025 and in Weekly Gazette of India dated 04.10.2025 for the general public to
make observations/representations on the proposed transmission route within two months from the date of publication.
Subsequently, M/s Torrent Solar Power Private Limited has submitted an affidavit dated 06.12.2025 declaring that no
observation/representation was received within two months from the date of Publication in the official Gazette of
Government of India.
And now the applicant has requested to confer upon him, all the powers under section 164 of the Electricity
Act, 2003, which the telegraph authority possess under the Indian Telegraph Act, 1885 with respect to the placing of
telegraph lines and posts for the purpose of a telegraph established or maintained by Government or to be so
established or maintained for laying of overhead transmission line for providing Connectivity to M/s Torrent Solar
Power Pvt Limited for its RE Power Project in Koppal, Karnataka. The following overhead transmission line is
covered under this scheme:-
1. Generation Pooling station of M/s Torrent Solar Power Pvt. Ltd. (Located in Village: Mangluru, Taluka:
Kuknur, District: Koppal, Karnataka)- Koppal-II PS (ISTS S/s) 220kV S/c line (Line Length is about 7 Km
out of which about 2-3 Km (approx.) from Koppal II PS end will be implemented on multi-circuit towers)
The overhead transmission line covered under the above scheme will pass through, over, around and between the
following villages, towns and cities in the State of Karnataka:
+-----------------------------------------------------------------------------------+----------+----------+-----------+
| Villages | Tehsil | District | State |
+===================================================================================+==========+==========+===========+
| Ravunki, Kalkeri, Manglur, Budgumpi, Belageri, Yedayapur, Bedwatti, Siruru, | Kuknur | Koppal | Karnataka |
| Muttal, Kadarahalli, Balapur, Kavalkere | | | |
+-----------------------------------------------------------------------------------+----------+----------+-----------+
| Chik Megeri, Lakshmangudda, Guttur, Wangeri, Gudgunti, Lakmangule | Yelburga | Koppal | Karnataka |
+-----------------------------------------------------------------------------------+----------+----------+-----------+
Now, after careful consideration, Ministry of Power, Government of India, under section 164 of the Electricity
Act, 2003, confers all the powers to M/s Torrent Solar Power Private Limited for laying above mentioned overhead
transmission line, which telegraph authority possesses under the Indian Telegraph Act, 1885 with respect to placing of
telegraph lines and posts for the purposes of a telegraph established or maintained, by Government or to be established
or maintained subject to following terms and conditions for installing the above mentioned line, namely:
i. The approval is granted for 25 years.
ii. The Applicant shall have to seek the consent of the concerned authorities i.e., local bodies, Railways,
National Highways, State Highways etc. before erection of proposed line.
iii. The Applicant shall have to follow regulations/codes of the Appropriate Commission regarding transmission,
O&M, open access, etc., framed under the Electricity Act, 2003.
iv. The Applicant shall operate the line after approval of Electrical Inspector / Chief Electrical Inspector of
Central Government.
v. The approval is subject to compliance of the requirement of the provisions of the Electricity Act, 2003 and
the rules made there under by the applicant.
vi. M/s Torrent Solar Power Pvt Limited shall have to submit the requisite clearances to Central Electricity
Authority after obtaining the same from concerned authorities like Civil Aviation, Defense etc., at the time of
Electrical Inspection.
[F. No. 25-16/14/2026-POWER GRID(MOP) ]
M.V.N. Vara Prasad, Under Secretary (PG)