The Ministry of Power confers powers upon M/s Tata Power Renewable Energy Limited under Section 164 of the Electricity Act, 2003, for laying an overhead transmission line in Maharashtra.

Detailed Summary

The Ministry of Power, Government of India, issued Order S.O. 1637(E) on March 27, 2026, to confer powers under Section 164 of the Electricity Act, 2003, to M/s Tata Power Renewable Energy Limited, headquartered in Mumbai 400009. This authorization is for laying an overhead 400 kV S/c transmission line, approximately 18.301 km long, connecting TPREL PS (Village Washi, Taluka Washi, District Dharashiv, Maharashtra) to TSPPL Common PS (Village Nandurghat, Taluka Kej, District Beed, Maharashtra). This transmission system is intended to provide 302.8MW connectivity for Tata Power Renewable Energy Limited's proposed Wind Power Project in Dharashiv District, Maharashtra. The Ministry had previously granted prior approval under Section 68(1) of the Electricity Act, 2003, via letter No. 25-17/90/2024-PG dated 17.09.2024. Public notices for the scheme were published in the Indian Express on 12.08.2025 and the Weekly Gazette of India on 20.09.2025, and an affidavit dated 20.01.2026 confirmed no representations were received within the stipulated two months. The conferred powers are equivalent to those of a telegraph authority under the Indian Telegraph Act, 1885, and are subject to conditions including a 25-year approval period, seeking consent from concerned authorities (local bodies, Railways, National Highways, State Highways, etc.), compliance with Electricity Act, 2003 regulations, operation after Electrical Inspector/Chief Electrical Inspector approval, and submission of requisite clearances from Civil Aviation, Defense, etc., to the Central Electricity Authority at the time of Electrical Inspection.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-01042026-271480 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY No. 1572] NEW DELHI, MONDAY, MARCH 30, 2026/CHAITRA 9, 1948 MINISTRY OF POWER ORDER New Delhi, the 27th March, 2026 S.O. 1637(E).— Whereas M/s Tata Power Renewable Energy Limited, the applicant with its registered office at 34, Sant Tukaram Road, Carnac Bunder, Mumbai 400009, has applied for authorization under Section 164 of the Electricity Act, 2003 for laying of overhead transmission line included in the transmission scheme, “Transmission system for providing connectivity of 302.8MW to M/s TATA Power Renewable Energy Limited for its proposed Wind Power Project in Dharashiv District, Maharashtra". And whereas, Ministry of Power, Government of India vide its letter No. 25-17/90/2024-PG dated 17.09.2024 had granted prior approval under section 68(1) of the Electricity Act, 2003 for laying of overhead transmission line included in the transmission scheme, “Transmission system for providing connectivity of 302.8MW to M/s TATA Power Renewable Energy Limited for its proposed Wind Power Project in Dharashiv District, Maharashtra.” M/s Tata Power Renewable Energy Limited had published notice for transmission scheme in local newspapers Indian Express (in English) dated 12.08.2025, Lokhmat Samachar (in Hindi) dated 12.08.2025 and Punya Nagari (in Marathi) 12.08.2025, and in Weekly Gazette of India dated 20.09.2025 for the general public to make observations/ representations on the proposed transmission route within two months from the date of publication. Subsequently, M/s Tata Power Renewable Energy Limited has submitted an affidavit dated 20.01.2026 declaring that no observation/ representation was received within two months from the date of Publication in the Newspaper/official Gazette of Government of India. And now the applicant has requested to confer upon him, all the powers under section 164 of the Electricity Act, 2003, which the telegraph authority possess under the Indian Telegraph Act, 1885 with respect to the placing of telegraph lines and posts for the purpose of a telegraph established or maintained by Government or to be so established or maintained for laying of overhead transmission line for M/s Tata Power Renewable Limited. The following overhead transmission line is covered under this scheme: • TPREL PS (located at Village Washi, Taluka Washi, District Dharashiv, Maharashtra) – TSPPL Common PS (located at Village Nandurghat, Taluka Kej, District Beed, Maharashtra) 400 kV S/c line on S/c towers (total line length of 18.301 km approx.). The overhead transmission line covered under the above scheme will pass through, over, around and between the following villages, towns and cities of Maharashtra: +----------------------------------------------------------------------------------------------------------------+--------+-----------+-----------+ | Villages | Tehsil | District | State | +================================================================================================================+========+===========+===========+ | Golegaon, Washi, Sarola Washi, Maldarpuri, Kavdewadi, Tandulwadi, Pimpalwadi, Lakhangaon, Para, Dongrewadi, Fakrabad | Washi | Dharashiv | Maharashtra | +----------------------------------------------------------------------------------------------------------------+--------+-----------+-----------+ | Nandurghat | Kej | Beed | Maharashtra | +----------------------------------------------------------------------------------------------------------------+--------+-----------+-----------+ Now, after careful consideration, Ministry of Power, Government of India, under section 164 of the Electricity Act, 2003, confers all the powers to M/s Tata Power Renewable Energy Limited for above overhead transmission line, which telegraph authority possesses under the Indian Telegraph Act, 1885 with respect to placing of telegraph lines and posts for the purposes of a telegraph established or maintained, by Government or to be established or maintained subject to following terms and conditions for installing the above mentioned line, namely: i. The approval is granted for 25 years. ii. The Applicant shall have to seek the consent of the concerned authorities i.e., local bodies, Railways, National Highways, State Highways etc. before erection of proposed line. iii. The Applicant shall have to follow regulations/ codes of the Appropriate Commission regarding transmission, O&M, open access, etc., framed under the Electricity Act, 2003. iv. The Applicant shall operate the line after approval of Electrical Inspector / Chief Electrical Inspector of Central Government. v. The approval is subject to compliance of the requirement of the provisions of the Electricity Act, 2003 and the rules made there under by the applicant. vi. M/s Tata Power Renewable Energy Limited shall have to submit the requisite clearances to Central Electricity Authority after obtaining the same from concerned authorities like Civil Aviation, Defense etc., at the time of Electrical Inspection. [F. No. 25-16/19/2026-POWER GRID(MoP)] M.V.N. VARA PRASAD, Under Secy. (PG)

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free