Gazette Tracker
Gazette Tracker

Core Purpose

To facilitate construction and ensure safety of Metro Railway from Salt Lake Sector-V to Teghoria (Haldiram) in Kolkata, including land acquisition and construction restrictions.

Detailed Summary

The Central Government has issued a notification declaring the necessity for the construction of a Metro Railway line connecting Salt Lake Sector-V to Teghoria (Haldiram) in Kolkata for public purposes. This entails acquiring user rights over land, buildings, and infrastructure along a defined alignment. The notification prohibits any new construction within a 20-meter width on either side of the proposed metro alignment for a period of five years from the date of notification publication. A compensation mechanism is established for individuals sustaining losses due to these directives, with an appeal process available through an Appellate Authority within sixty days of the Competent Authority's order. The schedule attached to the notification provides detailed specifications of the metro alignment, including chainage and corridor widths.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-WB-E-22032025-261872 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY No. 1338] NEW DELHI, FRIDAY, MARCH 21, 2025/PHALGUNA 30, 1946 MINISTRY OF RAILWAYS (Metro Railway) NOTIFICATION Kolkata, the 19th March, 2025 S.O. 1356(E).—(1) Whereas the Central Government is of the opinion that it is necessary or expedient for facilitating the construction or for ensuring the safety of Metro Railway from Salt Lake Sector -V to Teghoria (Haldiram) in the city of Kolkata and other works connected therewith for public purpose, as per the alignment mentioned in the accompanying Schedule; And whereas the Central Government is satisfied that due care has been taken so that minimum inconvenience and hardships are caused to the owners or occupiers of the land, building, street, road, passage, nullah etc. and the acquisition of the right of the user in the land, building, street, road, passage, nullah etc. shown in the plan is inescapable for construction of Metro Railway from Salt Lake Sector -V to Teghoria (Haldiram); And whereas the plan of the areas mentioned in the said Schedule may be inspected in the Office of the General Manager, Metro Railway, Kolkata or his nominees, 1.1. Now, therefore, in exercise of the powers conferred by sub-section (1) of Section 21 of the Metro Railways (Construction of Works)Act, 1978 (Act 33 of 1978) (hereinafter referred to as the said Act), the Central Government hereby directs under clause (a) of sub-section (1) of Section 21 of the said Act that no building or any other construction shall be made or done above the proposed Metro alignment or on any land within the 20.0m width on either side of the proposed metro alignment as mentioned in the accompanying Schedule, within 05 (five) years from the date of publication of this notification; 2. Every person shall be bound to comply with these directions, as specified in sub-section (5) of section 21 of the said Act. 3. Any person who sustains any loss or damage in consequence of these directions shall be paid an amount which shall be determined by an order of the Competent Authority in the first instance and if the amount determined by the Competent Authority is not acceptable to either of the parties, the amount shall, on an appeal preferred by either of the parties, within sixty (60) days from the date of the order of the Competent Authority, to the Appellate Authority, be determined by an order of the Appellate Authority. SCHEDULE Alignment with centerline of Station or between Stations or between sections from Salt Lake Sector-V to Teghoria (Haldiram) +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | SI No.| Alignment with center line of station/between stations/ | Name of Station or Section | Chainage | Location of center line of Alignment of Metro Corridors | Width proposed to be covered under notification | Physical features on ground for identifying the stretch (Facing towards Haldiram) | Left side of the Alignment | Right side of the Alignment | | | between section | | | | | | | | +=======+=========================================================+==============================+===========+===================================================+====================================+===========================================================+===========================+================================------+ | 1 | Teghoria / Haldiram | Station End | CH:6437m | 22.7m from Boundary Wall of PS Magnum | 20m on Either side of Metro alignment | - | - | PS Magnum | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 2 | Teghoria /Haldiram | Station Centre | CH:6337m | 21.6m from Boundary Wall of B.P Poddar Institute of | 20m on Either side of Metro alignment | - | - | B.P Poddar Institute of Management & Technology| +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 3 | Teghoria /Haldiram | Station Start | CH:6237m | 19m from Boundary Wall of Open Pvt. Plot | 20m on Either side of Metro alignment | - | - | Open Pvt. Plot | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 4 | Teghoria Station Portion | | 6418m to | 23m from PS Magnum | 20m on Either side of Metro alignment | - | - | PS Magnum (G+9) | | | | | 6487m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 5 | Teghoria Station Portion | | 6359m to | 16m for Indian Overseas Bank | 20m on Either side of Metro alignment | - | - | Indian Overseas Bank (G+4) | | | | | 6394m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 6 | Teghoria Station Portion | | 6307m to | 13.7m from B.P Poddar Institute of Management & Technology | 20m on Either side of Metro alignment | - | - | B.P Poddar Institute of Management & Technology| | | | | 6269m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 7 | Teghoria Station Portion | | 6257m | 13.60m from Satyam Tower | 20m on Either side of Metro alignment | - | - | Satyam Tower | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 8 | Tunnel From Teghoria to Raghunathpur | | 6242m to | 11.5m to 17.0m Proposed Flyover by HIDCO | 20m on Either side of Metro alignment | Proposed Flyover by HIDCO | - | - | | | | | 6041m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 9 | Tunnel From Teghoria to Raghunathpur | | 6245m to | 11.5m from Boundary wall of Open Pvt. Plot | 20m on Either side of Metro alignment | - | - | Boundary Wall of open Pvt. Plot | | | | | 6214m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 10 | Tunnel From Teghoria to Raghunathpur | | 6204m | 11.60m from Bank of Baroda | 20m on Either side of Metro alignment | - | - | Bank of Baroda | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 11 | Tunnel From Teghoria to Raghunathpur | | 6190m | 9.60m from Panchavati Apartment Security Room | 20m on Either side of Metro alignment | - | - | Panchavati Apartment Security Room | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 12 | Tunnel From Teghoria to Raghunathpur | | 6087m TO | 12.50m from Bhasar Roy Enclave (A.W.H.O) | 20m on Either side of Metro alignment | - | - | Bhasar Roy Enclave (A.W.H.O) | | | | | 6012m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 13 | Tunnel From Teghoria to Raghunathpur | | 6090m | 13.0m S.B.I. ATM | 20m on Either side of Metro alignment | S.B.I. ATM | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 14 | Tunnel From Teghoria to Raghunathpur | | 6113m TO | 14.220m from Sriram Nagar Martin Burn | 20m on Either side of Metro alignment | Sriram Nagar Martin Burn | - | - | | | | | 6094m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 15 | Tunnel From Teghoria to Raghunathpur | | 6094m TO | 7.5m to 20m from Open Pvt. Plot | 20m on Either side of Metro alignment | - | - | Open Pvt. Plot | | | | | 5987m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 16 | Tunnel From Teghoria to Raghunathpur | | 5970m | 66m from Boundary Wall Situated Left Side of Alignment| 20m on Either side of Metro alignment | Haldiram Flyover Crossing | Haldiram Flyover Crossing | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 17 | Tunnel From Teghoria to Raghunathpur | | 5857m to | 10.0m from Fencing Boundary Area | 20m on Either side of Metro alignment | - | - | Fencing Boundary Area | | | | | 5822m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 18 | Tunnel From Teghoria to Raghunathpur | | 5524.305m | 21.5m from Hotel Geetanjali | 20m on Either side of Metro alignment | - | - | Hotel Geetanjali | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 19 | Tunnel From Teghoria to Raghunathpur | | 5513.5m | 18.0m from Uma Medical | 20m on Either side of Metro alignment | - | - | Uma Medical | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 20 | Tunnel From Teghoria to Raghunathpur | | 5498m | 18.0m from Hotel Down Town Bar | 20m on Either side of Metro alignment | - | - | Hotel Down Town Bar | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 21 | Tunnel From Teghoria to Raghunathpur | | 5469m | 19.5m to New Haji Sahab Fast Food Centre | 20m on Either side of Metro alignment | New Haji Sahab Fast Food Centre | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 22 | Tunnel From Teghoria to Raghunathpur | | 5448m | 20.m to Taghriya High School | 20m on Either side of Metro alignment | Taghriya High School | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 23 | Teghoria to Raghunathpur | | 5489m to | 17.16m to Teghoria Bus Stop | 20m on Either side of Metro alignment | Teghoria Bus Stop | - | - | | | | | 5457m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 24 | Raghunathpur | Station End | CH:5169m | 49.4m from Amarasabai Club | 20m on Either side of Metro alignment | Amarasabai Club | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 25 | Raghunathpur | Station Center | CH:5098m | 34.3m from Hotel Rajashree | 20m on Either side of Metro alignment | Hotel Rajashree | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 26 | Raghunathpur | Station Start | CH:5028m | 47.4m from Gold's Gym | 20m on Either side of Metro alignment | Gold's Gym | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 27 | Raghunathpur Station Portion | | 5154m | 28.5M from Geetanjali Regency | 20m on Either side of Metro alignment | Geetanjali Regency | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 28 | Raghunathpur Station Portion | | 5130m | 25.5m from Bebanjali Apartment | 20m on Either side of Metro alignment | Bebanjali Apartment | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 29 | Raghunathpur Station Portion | | 5106.5m | 31.0m M/S Sakshi Motor Service | 20m on Either side of Metro alignment | M/S Sakshi Motor Service | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 30 | Raghunathpur Station Portion | | 5100m | 32.6m from Hotel Rajashree | 20m on Either side of Metro alignment | Hotel Rajashree | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 31 | Raghunathpur Station Portion | | 5089m | 31.0m from U/C Building | 20m on Either side of Metro alignment | U/C Building | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 32 | Raghunathpur Station Portion | | 5079m | 33.0m from Levi's | 20m on Either side of Metro alignment | Levi's | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 33 | Raghunathpur Station Portion | | 5072m | 35.5m from Rani Tower | 20m on Either side of Metro alignment | Rani Tower | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 34 | Viaduct From Raghunathpur to Baguihati | | 4636m to | 45m to 55m from Vesper Restaurant & Swagatam International Gust House | 20m on Either side of Metro alignment | - | - | Vesper Restaurant & Swagatam International Gust House| | | | | 4945m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 35 | Viaduct From Raghunathpur to Baguihati | | 4830m to | 6.5m to 8.5m from Total Hut 8 Nos. | 20m on Either side of Metro alignment | - | - | Total Hut 8 Nos. | | | | | 4851m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 36 | Viaduct From Raghunathpur to Baguihati | | 4854m to | 55m to 62m from Big Bazaar | 20m on Either side of Metro alignment | Big Bazaar | - | - | | | | | 4911m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 37 | Viaduct From Raghunathpur to Baguihati | | 4848.5m to| 66m to 71m from Vishal Mega Mart | 20m on Either side of Metro alignment | Vishal Mega Mart | - | - | | | | | 4911m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 38 | Viaduct From Raghunathpur to Baguihati | | 4859m to | 30m to 39m from The Meridian (G+6) | 20m on Either side of Metro alignment | The Meridian (G+6) | - | - | | | | | 4945m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 39 | Viaduct From Raghunathpur to Baguihati | | 4820.5m | 29.5m from Ginger Chop | 20m on Either side of Metro alignment | Ginger Chop (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 40 | Viaduct From Raghunathpur to Baguihati | | 4757m | 20m from Pratima | 20m on Either side of Metro alignment | Pratima (G+6) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 41 | Viaduct From Raghunathpur to Baguihati | | 4697m | 23m from Ananda Nivas | 20m on Either side of Metro alignment | Ananda Nivas | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 42 | Viaduct From Raghunathpur to Baguihati | | 4666m | 20.5m from Hotel Banerjee International | 20m on Either side of Metro alignment | Hotel Banerjee International | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 43 | Viaduct From Raghunathpur to Baguihati | | 4654.6m | 21m from Hangover Restaurant Cum Bar | 20m on Either side of Metro alignment | Hangover Restaurant Cum Bar | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 44 | Viaduct From Raghunathpur to Baguihati | | 4638m | 18m from Skincare Cream | 20m on Either side of Metro alignment | Skincare Cream | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 45 | Viaduct From Raghunathpur to Baguihati | | 4598m | 20.5m from Skincare Cream | 20m on Either side of Metro alignment | Souarefeet | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 46 | Viaduct From Raghunathpur to Baguihati | | 4591m | 18m from Loharuka group | 20m on Either side of Metro alignment | Loharuka group | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 47 | Viaduct From Raghunathpur to Baguihati | | 4535m | 21.5m from Reliance Mobile Store | 20m on Either side of Metro alignment | Reliance Mobile Store (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 48 | Viaduct From Raghunathpur to Baguihati | | 4782m | 65m from National English School | 20m on Either side of Metro alignment | - | - | National English School (G+5) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 49 | Viaduct From Raghunathpur to Baguihati | | 4547.5m | 90m from Bliss Nursing Home | 20m on Either side of Metro alignment | - | - | Bliss Nursing Home (G+2) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 50 | Viaduct From Raghunathpur to Baguihati | | 4487.5m | 26m from Furniture Maker | 20m on Either side of Metro alignment | Furniture Maker (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 51 | Viaduct from Raghunathpur to Baguihati | | 4470m | 22m from Harmony House | 20m on Either side of Metro alignment | Harmony House | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 52 | Viaduct from Raghunathpur to Baguihati | | 4449m | 23m from Konica Minolta | 20m on Either side of Metro alignment | Konica Minolta (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 53 | Viaduct from Raghunathpur to Baguihati | | 4428m | 22.0m from Shivangan Hotel & Banquet | 20m on Either side of Metro alignment | Shivangan Hotel & Banquet (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 54 | Viaduct from Raghunathpur to Baguihati | | 4506.5m | 80.0m from HDFC Bank | 20m on Either side of Metro alignment | - | - | HDFC Bank (G+4) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 55 | Viaduct from Raghunathpur to Baguihati | | 4409m | 22.5m from V.I.P. Mansion | 20m on Either side of Metro alignment | V.I.P. Mansion (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 56 | Viaduct from Raghunathpur to Baguihati | | 4392.5m | 24.5m from V.I.P. Plaza | 20m on Either side of Metro alignment | V.I.P. Plaza (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 57 | Viaduct from Raghunathpur to Baguihati | | 4379.5m | 16m from UAEX Change | 20m on Either side of Metro alignment | UAEX Change (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 58 | Viaduct from Raghunathpur to Baguihati | | 4425m | 57m from Axis Bank ATM | 20m on Either side of Metro alignment | - | - | Axis Bank ATM (G+2) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 59 | Viaduct from Raghunathpur to Baguihati | | 4368m | 39m from Anuj Complex | 20m on Either side of Metro alignment | Anuj Complex | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 60 | Viaduct from Raghunathpur to Baguihati | | 4358m | 9m from V.I.P. Sweets | 20m on Either side of Metro alignment | V.I.P. Sweets (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 61 | Viaduct from Raghunathpur to Baguihati | General Hospital | 4356m | 35.5m from Apex General Hospital | 20m on Either side of Metro alignment | Hospital (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 62 | Viaduct from Raghunathpur to Baguihati | | 4350m | 19m from Serum | 20m on Either side of Metro alignment | Serum (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 63 | Viaduct from Raghunathpur to Baguihati | | 4340m | 27m from Jayanta Auto Works | 20m on Either side of Metro alignment | - | - | Jayanta Auto Works (G+1) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 64 | Viaduct from Raghunathpur to Baguihati | | 4323m | 7m from Priya Tyrecenirle | 20m on Either side of Metro alignment | Priya Tyrecenirle (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 65 | Viaduct from Raghunathpur to Baguihati | | 4305.5m | 5.5m from Building | 20m on Either side of Metro alignment | Building | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 66 | Viaduct from Raghunathpur to Baguihati | | 4308.5m | 37.5m from Calcutta Public School | 20m on Either side of Metro alignment | - | - | Calcutta Public School (G+3) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 67 | Viaduct from Raghunathpur to Baguihati | | 4421m to | 36.5m to 41m from B.W. of Open Pvt. Plot | 20m on Either side of Metro alignment | - | - | Boundary wall of Oen Pvt. Plot | | | | | 4300 | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 68 | Viaduct from Raghunathpur to Baguihati | | 4261m to | 0.0m to 2.6m from Boundary Wall | 20m on Either side of Metro alignment | Boundary Of Buildings & Tin Shed | - | - | | | | | 4297m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 69 | Viaduct from Raghunathpur to Baguihati | | 4146m to | The Boundary Wall is Under the Viaduct | 20m on Either side of Metro alignment | Government Of West Bengal Office of the Executive Division| - | - | | | | | 4261m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 70 | Baguihati | Station End | CH: 4187m | 58.7 m from Axis Bank (G+3) +Shed | 20m on Either side of Metro alignment | Axis Bank (G+3) +Shed | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 71 | Baguihati | Station Center | CH: 4116m | 56m from PASHUPATI (G+4) | 20m on Either side of Metro alignment | Pashupati (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 72 | Baguihati | Station Start | CH: 4046m | 55m from SYNDICATE BANK (G+3) | 20m on Either side of Metro alignment | SYNDICATE BANK (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 73 | Baguihati Station Portion | | 4106.4m to| The Boundary Wall is Under the Station | 20m on Either side of Metro alignment | Government of West Bengal office of the Superintending near Southern Electrical circle & U/C building | - | - | | | | | 4146m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 74 | Baguihati Station Portion | | 4186m | 57m from AXIS BANK | 20m on Either side of Metro alignment | Axis Bank Shed (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 75 | Baguihati | | 4047m to | Boundary Wall | 20m on Either side of Metro alignment | P.W.D Land | P.W.D Land | - | | | | | 4107m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 76 | Baguihati Station Portion | | 4158m | 55m from State Bank of India | 20m on Either side of Metro alignment | - | - | State Bank of India (G+2) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 77 | Baguihati Station Portion | | 4074m | 52m from Anandamoye Restaurant | 20m on Either side of Metro alignment | Anandamoye Restaurant (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 78 | Baguihati Station Portion | | 4059m | 42m from Syndicate Bank | 20m on Either side of Metro alignment | Syndicate Bank (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 79 | Viaduct From Baguihati to Kestopur | | 4065m | Boundary Wall Under The viaduct | 20m on Either side of Metro alignment | Shed Of Baguihati V.I.P. Super Merket | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 80 | Viaduct from Baguihati to Kestopur | | 4005.5m | 18.5m from Durga Bhawan | 20m on Either side of Metro alignment | Durga Bhawan (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 81 | Viaduct from Baguihati to Kestopur | | 3997m | 18.25m from Durga Bhawan | 20m on Either side of Metro alignment | Baguihati F.L. off Shop (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 82 | Viaduct from Baguihati to Kestopur | | 3984.5m | 15m from Anupam Shop | 20m on Either side of Metro alignment | Anupam Shop Taily Shed | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 83 | Viaduct from Baguihati to Kestopur | | 3980m | 40m from Traffic Guard | 20m on Either side of Metro alignment | Baguihati Traffic Guard (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 84 | Viaduct from Baguihati to Kestopur | | 3950m | 6m from Huts | 20m on Either side of Metro alignment | Total Hut 20 Nos. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 85 | Viaduct from Baguihati to Kestopur | | 3927m | 35m from Auto Rickshaw Operators Union | 20m on Either side of Metro alignment | Baguihati To Ultadanga Auto Rickshaw Operators Union | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 86 | Viaduct from Baguihati to Kestopur | | 3903m | 10m from Mice Bata | 20m on Either side of Metro alignment | Mice Bata (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 87 | Viaduct from Baguihati to Kestopur | | 3885m | 9m from ICICI Bank | 20m on Either side of Metro alignment | ICICI Bank (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 88 | Viaduct from Baguihati to Kestopur | | 3870m | Bandhan Bank | 20m on Either side of Metro alignment | Bandhan Bank (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 89 | Viaduct from Baguihati to Kestopur | | 3847m | 9.5m from Great Eastern Trading Co. | 20m on Either side of Metro alignment | Great Eastern Trading Co. (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 90 | Viaduct from Baguihati to Kestopur | | 3837m | 39m from Pridha Niwas | 20m on Either side of Metro alignment | Pridha Niwas (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 91 | Viaduct from Baguihati to Kestopur | Niwas | 3813m | 9m from Deep Tower | 20m on Either side of Metro alignment | Deep Tower (G+5) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 92 | Viaduct from Baguihati to Kestopur | | 3792m | 9m from Akarshan Tailors | 20m on Either side of Metro alignment | Akarshan Tailors (G+0) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 93 | Viaduct from Baguihati to Kestopur | | 3783m | 7.25m Samsung Smart Café | 20m on Either side of Metro alignment | Samsung Smart Café (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 94 | Viaduct from Baguihati to Kestopur | | 3774m | 9m from Globe Ply Shed | 20m on Either side of Metro alignment | Globe Ply Shed (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 95 | Viaduct from Baguihati to Kestopur | | 3773m | 44m from Ladies Hostel Swastika | 20m on Either side of Metro alignment | - | - | Ladies Hostel Swastika (G+3) | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 96 | Viaduct from Baguihati to Kestopur | | 3747m | 8m from Suhar Apartment | 20m on Either side of Metro alignment | Suhar Apartment (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 97 | Viaduct from Baguihati to Kestopur | | 3705m | 6m from Saptaparni | 20m on Either side of Metro alignment | Saptaparni (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 98 | Viaduct from Baguihati to Kestopur | | 3674m | 6m from Neelachal | 20m on Either side of Metro alignment | Neelachal (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 99 | Viaduct from Baguihati to Kestopur | | 3648m | 23m from Vinline Hero | 20m on Either side of Metro alignment | Vinline Hero (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 100 | Viaduct from Baguihati to Kestopur | | 3626m | 23m from Manali House | 20m on Either side of Metro alignment | Manali House (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 101 | Kestopur | Station End | CH: 3603m | 24.7m from Rolta Bajaj (G+4) | 20m on Either side of Metro alignment | Rolta Bajaj (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 102 | Kestopur | Station Center | CH: 3533m | 26m from Bishanu Oil Company (G+3) | 20m on Either side of Metro alignment | Bishanu Oil Company (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 103 | Kestopur | Station Start | CH: 3463m | 30.8m from Mukesh Hyundai (G+3) | 20m on Either side of Metro alignment | Mukesh Hyundai (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 104 | Kestopur Station Portion | | 3603m | 22.5m from Rolta Bajaj | 20m on Either side of Metro alignment | Rolta Bajaj (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 105 | Kestopur Station Portion | Land & RCC Caesar Plant | to 3660m | 40m from P.W.D Land & RCC Caesar Plant | 20m on Either side of Metro alignment | Caesar Plant | P.W.D Land & RCC Caesar Plant | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 106 | Kestopur Station Portion | | 3586m | 22m from Vasudha | 20m on Either side of Metro alignment | Vasudha (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 107 | Kestopur Station Portion | | 3556m | 22m from Yamaha Technical Academy | 20m on Either side of Metro alignment | Yamaha Technical Academy | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 108 | Kestopur Station Portion | | 3542m | 24m from Bishanu Oil Company | 20m on Either side of Metro alignment | Bishanu Oil Company | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 109 | Kestopur Station Portion | | 3525m | 28m from Open Pvt. Plot | 20m on Either side of Metro alignment | Open Pvt. Plot | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 110 | Kestopur Station Portion | | 3505m | 21.5m from Mukesh Institute of Technology & Management | 20m on Either side of Metro alignment | Mukesh Institute of Technology & Management | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 111 | Kestopur Station Portion | | 3471m | 26m from Mukesh Hyundai | 20m on Either side of Metro alignment | Mukesh Hyundai (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 112 | Viaduct From Kestopur to Krishnapur | | 3411m | 32m from Suraksha Hospital | 20m on Either side of Metro alignment | Suraksha Hospital (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 113 | Viaduct From Kestopur to Krishnapur | | 3391m | 18.5m from Temple | 20m on Either side of Metro alignment | Temple | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 114 | Viaduct From Kestopur to Krishnapur | | 3386m | 19m from Pump House | 20m on Either side of Metro alignment | Pump House | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 115 | Viaduct From Kestopur to Krishnapur | | 3350m | Cross Under Viaduct | 20m on Either side of Metro alignment | Bagjola Canal | Bagjola Canal | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 116 | Viaduct From Kestopur to Krishnapur | | 3342m | 18.25m Furniture World | 20m on Either side of Metro alignment | Furniture World | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 117 | Viaduct From Kestopur to Krishnapur | | 3320m | 13m from Narayani | 20m on Either side of Metro alignment | Narayani | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 118 | Viaduct from Kestopur to Krishnapur | | 3203m | 10m from Pleasure World | 20m on Either side of Metro alignment | Pleasure World | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 119 | Viaduct From Kestopur to Krishnapur | | 3191m | 14.5m from Masterda Smriti Sangha | 20m on Either side of Metro alignment | Masterda Smriti Sangha (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 120 | Viaduct from Kestopur to Krishnapur | | 3175m | Auto Park | 20m on Either side of Metro alignment | Auto Park (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 121 | Viaduct from Kestopur to Krishnapur | | 3162m | Om Engineering | 20m on Either side of Metro alignment | Om Engineering (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 122 | Viaduct from Kestopur to Krishnapur | | 3140m | 12m from Shri Krishana A House of Ceremony | 20m on Either side of Metro alignment | Shri Krishana A House of Ceremony | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 123 | Viaduct from Kestopur to Krishnapur | | 3105m | 7m from Shree Shree Radha Shamsundar Jau Mandir | 20m on Either side of Metro alignment | Shree Shree Radha Shamsundar Jau Mandir | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 124 | Viaduct from Kestopur to Krishnapur | | 3080< to | 6m from Open Pvt. Plot | 20m on Either side of Metro alignment | Open Pvt. Plot | - | - | | | | | 3115m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 125 | Viaduct from Kestopur to Krishnapur | | 3075m | 27m from WBSEDCL | 20m on Either side of Metro alignment | WBSEDCL | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 126 | Viaduct from Kestopur to Krishnapur | | 2900m to | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | Huts | Total Hut 45 Nos. | - | | | | | 2950m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 127 | Viaduct from Kestopur to Krishnapur | | 2845m to | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | Kestopur Canal | Kestopur Canal | - | | | | | 2900m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 128 | Viaduct from Kestopur to Krishnapur | | 2845m | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | Pipe Line Dia.- 1.8M | Pipe Line Dia.-1.8M | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 129 | Viaduct from Kestopur to Krishnapur | | 2600m to | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | Wildlife Crime Control Cell and Data Management Unit | - | - | | | | | 2845m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 130 | Viaduct from Kestopur to Krishnapur | | 2600m to | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | - | Park Area | - | | | | | 2845m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 131 | Viaduct from Kestopur to Krishnapur | | | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | - | A.G. Azock Udyan | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 132 | Viaduct from Kestopur to Krishnapur | | 2650m | Either sides and Under Viaduct also | 20m on Either side of Metro alignment | Ananda Dhara | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 133 | Viaduct from Kestopur to Krishnapur | | 2630m | 10m from H.P Gas Godown | 20m on Either side of Metro alignment | H.P Gas Godown | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 134 | Viaduct from Kestopur to Krishnapur | | 2490m to | 13m to 39 m from AC-144 to 154 | 20m on Either side of Metro alignment | - | AC-144 to 154 | - | | | | | 2575m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 135 | Viaduct from Kestopur to Krishnapur | | 2420m to | 2.5m to 41.5m from Total Hut 250 | 20m on Either side of Metro alignment | Total Hut 250 Nos. | - | - | | | | | 2600m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 136 | Viaduct from Kestopur to Krishnapur | | 2430m | 23m from Building (G+4) | 20m on Either side of Metro alignment | Building (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 137 | Viaduct from Kestopur to Krishnapur | | 2221m | 21.75m from Green Vally | 20m on Either side of Metro alignment | Green Vally (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 138 | Viaduct from Kestopur to Krishnapur | | 2208m | 21.5m from Building (G+3) | 20m on Either side of Metro alignment | Building (G+3) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 139 | Viaduct from Kestopur to Krishnapur | | 2162.5m | 6m from Park | 20m on Either side of Metro alignment | Park Area | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 140 | Viaduct from Kestopur to Krishnapur | | 2075m | 23m from Building (G+4) | 20m on Either side of Metro alignment | Building (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 141 | Viaduct from Kestopur to Krishnapur | | 2037.5m | 6m from Pump House | 20m on Either side of Metro alignment | Pump House | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 142 | Viaduct from Kestopur to Krishnapur | | 1904m | 22.5m from Amar Kolkata | 20m on Either side of Metro alignment | Amar Kolkata (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 143 | Viaduct from Kestopur to Krishnapur | | 1844m | 22m from Building (G+4) | 20m on Either side of Metro alignment | Indian Dian House (G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 144 | Viaduct from Kestopur to Krishnapur | | 1808m | 23m from S.K. Tower | 20m on Either side of Metro alignment | S.K. Tower (G+5) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 145 | Viaduct from Kestopur to Krishnapur | | 1773m to | 20m from Open Pvt. Plot | 20m on Either side of Metro alignment | Open Pvt. Plot | - | - | | | | | 1803 | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 146 | Viaduct from Kestopur to Krishnapur | | 1731m to | 54m from Children Park | 20m on Either side of Metro alignment | Children Park | - | - | | | | | 1801 | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 147 | Viaduct from Kestopur to Krishnapur | | 1735m | 23m from Samrpally Block-A | 20m on Either side of Metro alignment | Samrpally Block-A (G+6) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 148 | Viaduct from Kestopur to Krishnapur | | 1700m | 20m from Open Pvt. Plot | 20m on Either side of Metro alignment | Open Pvt. Plot | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 149 | Viaduct from Kestopur to Krishnapur | | 1625m to | 61m from West Bengal Forest Development Corporation Limited | 20m on Either side of Metro alignment | West Bengal Forest Development Corporation Limited | - | - | | | | | 1731m | | | | | | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 150 | Krishnapur | Station End | CH: 1651m | 24.5m from Building (G+1) | 20m on Either side of Metro alignment | Building (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 151 | Krishnapur | Station Center | CH: 1581m | 22m from Vashno Devi Academy (High School) | 20m on Either side of Metro alignment | Vashno Devi Academy (High School) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 152 | Krishnapur | Station Start | CH: 1511m | 73m from Building SA-84 (G+1) | 20m on Either side of Metro alignment | Building SA-84 (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 153 | Krishnapur Station Portion | | 1567m | 21.7m from Vashno Devi Academy (High School) | 20m on Either side of Metro alignment | Vashno Devi Academy (High School) (G+5) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 154 | Viaduct from Krishnapur Station to Sector -V | | 1485m | 10.5m from Fencing | 20m on Either side of Metro alignment | Fencing Of Building G+2 | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 155 | Viaduct from Krishnapur Station to Sector -V | | 1455m | 20m from Shyamoli Apartment | 20m on Either side of Metro alignment | Shyamoli Apartment | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 156 | Viaduct From Krishnapur Station to Sector -V | | 1436m | 20m from Building AB-37(G+2) | 20m on Either side of Metro alignment | AB-37 (G+2) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 157 | Viaduct From Krishnapur Station to Sector -V | | 1403m | 20m from Fencing Line of Building (G+2) | 20m on Either side of Metro alignment | Fencing Of Building G+2 | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 158 | Viaduct From Krishnapur Station to Sector -V | | 1360m | 18.5m from Sumadhuri Apartment | 20m on Either side of Metro alignment | Sumadhuri Apartment | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 159 | Viaduct From Krishnapur Station to Sector -V | | 1271m | 22m U/C Building | 20m on Either side of Metro alignment | U/C Building | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 160 | Viaduct From Krishnapur Station to Sector -V | | 1181m | 23m from Building (G+5) | 20m on Either side of Metro alignment | Building G+5 | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 161 | Viaduct From Krishnapur Station to Sector -V | | 1144m | 21.5m from Sunayana Apartment | 20m on Either side of Metro alignment | Sunayana Apartment | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 162 | Viaduct From Krishnapur Station to Sector -V | | 1107m | 8m from Farm Fresh Vege Tables Straight | 20m on Either side of Metro alignment | Farm Fresh Vege Tables Straight | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 163 | Viaduct From Krishnapur Station to Sector -V | | 980m | 76m from Boundary Wall | 20m on Either side of Metro alignment | Boundary Wall | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 164 | Viaduct From Krishnapur Station to Sector -V | | 954m | 33m from Play Ground | 20m on Either side of Metro alignment | Play Ground | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 165 | Viaduct From Krishnapur Station to Sector -V | | 883m | 57m from Boundary Wall of Children Park | 20m on Either side of Metro alignment | Children Park | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 166 | Viaduct From Krishnapur Station to Sector -V | | 819m | 9.8m from Krishnapur Triloke Tower and 55 m from Sector-V Police Station | 20m on Either side of Metro alignment | Sector-V Police Station | Krishnapur Triloke Tower | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 167 | Viaduct From Krishnapur Station to Sector -V | | 757m | 59m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar Amartya Abasan C.H.S. Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 168 | Viaduct From Krishnapur Station to Sector -V | | 740m | 8.6m from Private Open Land And 57.4m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | Privet Open Land | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 169 | Viaduct From Krishnapur Station to Sector -V | | 689m | 8.6m from Krishna Heights Barnaparichat Sarani and 55.5m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar Amartya Abasan C.H.S. Ltd. | Krishna Heights Barnaparichat Sarani | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 170 | Viaduct From Krishnapur Station to Sector -V | | 632m | 4.5m from Maa Mariya Club | 20m on Either side of Metro alignment | - | Maa Mariya Club | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 171 | Viaduct From Krishnapur Station to Sector -V | | 616m | 48.7m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar Amartya Abasan C.H.S. Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 172 | Viaduct From Krishnapur Station to Sector -V | | 593m | 37.7m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar AR Amartya Abasan C.H.S. Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 173 | Viaduct From Krishnapur Station to Sector -V | | 550m | 25.5m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar Amartya Abasan C.H.S. Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 174 | Viaduct From Krishnapur Station to Sector -V | | 485m | 0.5m from Boundary Wall of Bidhannagar Amartya Abasan C.H.S. Ltd. | 20m on Either side of Metro alignment | Bidhannagar Amartya Abasan C.H.S. Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 175 | Viaduct From Krishnapur Station to Sector -V | | 370m | 38.5m from Gobinda Bhawan | 20m on Either side of Metro alignment | Gobinda Bhawan | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 176 | Viaduct From Krishnapur Station to Sector -V | | 312m | 40m from Saltee Plaza | 20m on Either side of Metro alignment | Saltee Plaza(G+4) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 177 | Viaduct From Krishnapur Station to Sector -V | | 277m | 63m from HOUSE NO AL279 | 20m on Either side of Metro alignment | House No AL279 | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 178 | Viaduct From Krishnapur Station to Sector -V | | 240m | 50m from Boundary Wall of Midland Park Residents' (G+5) | 20m on Either side of Metro alignment | Midland Park Residents' | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 179 | Viaduct From Krishnapur Station to Sector -V | | 205m | 53.7m from Building Edify Kids (G+1) | 20m on Either side of Metro alignment | Edify Kids (G+1) | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 180 | Viaduct From Krishnapur Station to Sector -V | | 134m | 44.5m from Boundary Wall of West Bengal State Electricity Transmission Company Ltd. | 20m on Either side of Metro alignment | West Bengal State Electricity Transmission Company Ltd. | - | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ | 181 | Sector -V | | 0m | 45m from Boundary Wall of West Bengal State Electricity Transmission Company Ltd. and 100m from Surabhi Banerjee | 20m on Either side of Metro alignment | Surabhi Banerjee | West Bengal State Electricity Transmission Company Ltd. | - | +-------+---------------------------------------------------------+------------------------------+-----------+---------------------------------------------------+------------------------------------+-----------------------------------------------------------+---------------------------+--------------------------------------+ [F. No. MRTS/W-90/LA/Sec.V-Teg.] AJAY KUMAR, Chief Engineer/O&M

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free