REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-31082026-275868
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4458]
NEW DELHI, FRIDAY, AUGUST 21, 2026/SHRAVAN 30, 1948
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART II—SEC. 3(ii)]
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 21st August, 2026
S.O. 4639(E). — In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines
circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government had
notified following scheme, for implementation under TBCB mode, vide Gazette Notification mentioned
below:
+-----------------------------------+-------------------------------------+
| Sl. No. Name of the Scheme | Gazette Notification by which Scheme |
| | was notified |
+===================================+=====================================+
| 1. | Common Transmission System for |
| | S.O. 725(E) dated 12.02.2026 [F. No. |
| | evacuation of power from Lakadia |
| | 34-15/3/2026-Trans] |
| | (Phase-II: 7.5 GW), Jam Khambhaliya |
| | (Phase-II: 5.5 GW) and Jamnagar |
| | (Phase-I: 1 GW) Part-C |
+-----------------------------------+-------------------------------------+
2. Now, the Central Government, on the recommendations of 42nd National Committee on Transmission
has decided to modify the scope of above mentioned scheme. As such, the scope mentioned at Sl. No. 2, 3
and 5 of above scheme is hereby modified and Sl No. 5a is added as mentioned below; other scopes of the
Transmission Scheme and Bid Process Co-ordinator shall remain unchanged:
Name of the Modification in scope/ implementation timeframe of the scheme
Scheme
+-------------------------------------+---------------------------------------------------------+-------------------------------------------------+
| Common Transmission System for | Sl. No. Scope of the Transmission Scheme | Capacity/km |
| evacuation of power from Lakadia | 2. | Alephata - Lonikand-I 400kV D/c line (Quad |
| (Phase-II: 7.5 GW), Jam Khambhaliya | ACSR/AAAC/AL59 moose equivalent) (~22km.) | 22 km (44 ckm) |
| (Phase-II: 5.5 GW) and Jamnagar | 3. | 2 Nos. 400 kV Outdoor GIS line bays at Lonikand-I |
| (Phase-I: 1 GW) Part-C | (MSETCL) S/s for Alephata – Lonikand-I 400kV D/c line | 400 kV Outdoor GIS line bays - 2 Nos. (DM |
| | 5. | Scheme) along with associated equipment. |
| | Nasik – Alephata 765kV D/c line (~145km.) | 145 km (290 ckm) |
| | 5a. | 765 kV, 240 MVAr Switchable Line Reactor on |
| | each circuit at Nasik end of Nasik – Alephata 765kV D/c | 240 MVAr, 765 kV Switchable Line Reactor-2 |
| | line (with NGR bypass arrangement) | Nos. |
| | | 765 kV Switchable Line Reactor Bay - 2 Nos. |
| | | (for Nasik end). |
| | | 80 MVAR, 765 kV spare single-phase reactor |
| | | already approved at Nasik [under "Common |
| | | Transmission System for evacuation of power |
| | | from Lakadia (Phase-II: 7.5GW), Jam |
| | | Khambhaliya (Phase-II: 5.5GW) and Jamnagar |
| | | (Phase-I: 1GW) Part-B" for South Olpad – |
| | | Nasik 765kV D/c line] shall be utilized |
+-------------------------------------+---------------------------------------------------------+-------------------------------------------------+
[F.No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART II-SEC. 3(ii)]
NOTIFICATION
New Delhi, the 21st August, 2026
S.O. 4640(E). The following transmission scheme was notified for implementation under Tariff
Based Competitive Bidding (TBCB) vide Gazette Notification mentioned in below table:
+------------------------------------------------------------------------------------------------------------------------------------------+---------------------------------------------------------------------+
| Name of the Scheme/ Package | Gazette Notification by which Scheme was notified |
+==========================================================================================================================================+=====================================================================+
| Transmission System for Supply of Power to Green Hydrogen/Ammonia Manufacturing Potential in Kandla Area of Gujarat (Phase-I: 3 GW) | S.O. 3706(E). Dated 30.08.2024 (F.No. 15/3/2018-Trans-Pt(4)) |
+------------------------------------------------------------------------------------------------------------------------------------------+---------------------------------------------------------------------+
2. Above mentioned scheme was recommended for De-notification in 42nd meeting of the National
Committee on Transmission (NCT), held on 07.07.2026. As such, above scheme/ package, including its
scope is hereby de-notified.
[F.No. 34-15/3/2026- Trans.]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART II-SEC. 3(ii)]
NOTIFICATION
New Delhi, the 21st August, 2026
S.O. 4641(E). — In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines
circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government on the
recommendations of 42ndmeeting of National Committee on Transmission, hereby notifies the following
transmission schemes under TBCB mode, with details of respective Bid-Process Coordinator (BPC): -
1. Static/Dynamic compensation requirement in the Northern Region Grid
Implementation timeframe: 24 Months
BPC: PFC Consulting Limited (PFCCL)
Scope:
+--------+-------------------------------------+---------------------------------------------------------+
| Sl. No. | Description of Transmission Element | Scope of work |
| | | (Type of Substation / Conductor capacity / km / no. of |
| | | bays etc.) |
+========+=====================================+=========================================================+
| A | STATCOM | |
+--------+-------------------------------------+---------------------------------------------------------+
| 1 | 1 unit of STATCOM(+300MVAr) along | 1 unit of STATCOM(±300MVAr) along with MSC (1x125 |
| | with MSC (1x125 MVAr) & MSR (2x125 | MVAr) & MSR (2x125 MVAr) |
| | MVAr) at 765/400kV Aligarh (PG) S/s | 400 kV STATCOM (GIS) bay: 1 No. |
+--------+-------------------------------------+---------------------------------------------------------+
| 2 | 2 units of STATCOM (+300MVAr) along | 2 units of STATCOM (+300MVAr) along with MSC (2x125 |
| | with MSC (2x125 MVAr with each | MVAr with each unit) at 400/220kV Wagoora (PG) S/s |
| | unit) at 400/220kV Wagoora(PG) S/s | 400 kV STATCOM bays: 2 Nos. |
+--------+-------------------------------------+---------------------------------------------------------+
| 3 | 2 units of STATCOM (+300MVAr) along | 2 units of STATCOM (+300MVAr) along with MSC (2x125 |
| | with MSC (2x125 MVAr with each | MVAr with each unit) at 400/220kV Amargarh (Indigrid) |
| | unit) at 400/220kV Amargarh | S/s |
| | (Indigrid) S/s | 400 kV STATCOM (GIS) bays: 2 Nos. |
+--------+-------------------------------------+---------------------------------------------------------+
| 4 | 2 units of STATCOM(+300MVAr) along | 2 units of STATCOM (+300MVAr) along with MSC (1x125 |
| | with MSC (1x125 MVAr with each | MVAr with each unit) & MSR (2x125 MVAr with each |
| | unit) & MSR (2x125 MVAr with each | unit) at 765/400kV Jhatikara(PG) S/s |
| | unit) at 765/400kV Jhatikara(PG) S/s| 400 kV STATCOM bays: 2 Nos. |
+--------+-------------------------------------+---------------------------------------------------------+
| 5 | 1 unit of STATCOM(+300MVAr) along | 1 unit of STATCOM(+300MVAr) along with MSC (1x125 |
| | with MSC (1x125 MVAr) & MSR (2x125 | MVAr) & MSR (2x125 MVAr) |
| | MVAr) at 400/220kV Mandola (PG) S/s | 400 kV STATCOM bay: 1 No. |
+--------+-------------------------------------+---------------------------------------------------------+
| B | Bus Reactor | |
+--------+-------------------------------------+---------------------------------------------------------+
| 1 | 1 no. of 125 MVAR (420kV) Bus | 125 MVAr (420kV) Bus Reactor-1 No. |
| | Reactor at 765/400/220kV Agra(PG) S/s | 400kV Bus reactor bay – 1 No. |
+--------+-------------------------------------+---------------------------------------------------------+
| 2 | 1 no. of 125 MVAR (420kV) Bus | 125 MVAr (420kV) Bus Reactor-1 No. (in existing half |
| | Reactor at 400/220kV Patran | diameter) |
| | (IndiGrid) S/s (GIS) | |
+--------+-------------------------------------+---------------------------------------------------------+
| 3 | 1 no. of 330 MVAR (765kV) additional| 330 MVAr Bus Reactor-1 No. |
| | Bus Reactor at 765/400kV Orai(PG) S/s | 765kV Bus reactor bay – 1 No. (GIS) |
+--------+-------------------------------------+---------------------------------------------------------+
Note:
1. Bay(s) required for completion of diameter (GIS) in one-and-half breaker scheme shall also be
executed.
2. Bus extension wherever required, shall also be executed under present scope.
3. Additional land adjacent to the existing substation at Amargarh S/s and Wagoora S/s, required for
the installation of bays and associated elements, shall be within the scope of the successful bidder as
per site conditions.
4. Respective TSP of S/s (Aligarh, Jhatikara, Mandola, Agra, Patran & Orai) is to provide free of
cost unconditional access to the implementing ISTS licensee for installation of STACOMs/Bus
reactors and commensurate bays
5. Respective TSP of Amargarh and Wagoora is to provide free of cost unconditional access to
the implementing ISTS licensee for termination of bays required for STATCOM installation
2. Transmission System Strengthening at Karur PS for Integration of RE Generation Capacity
Implementation timeframe: 30 Months
BPC: PFC Consulting Limited (PFCCL)
Scope:
+--------+-------------------------------------------------------------+-------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity/km |
+========+=============================================================+=================================================+
| 1. | Karur PS - Pugalur (HVDC) 400kV (Quad) 2nd D/c line | ~ 15 km |
| | | 400 kV line bays – 2 Nos. at Karur PS |
+--------+-------------------------------------------------------------+-------------------------------------------------+
| 2. | 400kV line bays at Pugalur (HVDC) for Karur PS – Pugalur | 400 kV GIS line bays : 2 Nos. of complete GIS |
| | (HVDC) 400kV (Quad) 2nd D/c line | diameter (Line-Tie-Line(F) without future |
| | | provision of line reactor) at Pugalur (HVDC) |
| | | S/s. |
| | | Suitable re-routing of existing 400 kV lines |
| | | including multi circuit tower etc., if required,|
| | | for termination of Karur PS – Pugalur (HVDC) |
| | | 400kV (Quad) 2nd D/c line |
+--------+-------------------------------------------------------------+-------------------------------------------------+
| 3. | 400kV line bays at Pugalur (existing) for Karur PS – | 400 kV line bays – 2 Nos. at Pugalur (existing) |
| | Pugalur (existing) 400kV (Quad) 2nd D/c line | Acquisition of additional land of about 255x75 |
| | | meters adjacent to Pugalur (existing) for 2 nos.|
| | | of 400kV line bays |
+--------+-------------------------------------------------------------+-------------------------------------------------+
| 4. | Augmentation of 2x500 MVA, 400/230kV ICTs (5th& 6th) at | 2x500 MVA, 400/230kV ICTs |
| | Karur PS | 400kV ICT bay – 2 Nos. |
| | | 230kV ICT bay – 2 Nos. |
+--------+-------------------------------------------------------------+-------------------------------------------------+
| 5. | Karur PS – Pugalur (existing) 400 kV (Quad) 2nd D/c line | ~ 36 km |
| | | 400 kV line bays – 2 Nos. at Karur PS |
+--------+-------------------------------------------------------------+-------------------------------------------------+
| 6. | 1 no. of 230kV line bay at Karur PS for termination of | 230kV line bays – 1 no. |
| | dedicated transmission line of RE generation project | |
+--------+-------------------------------------------------------------+-------------------------------------------------+
Note:
i) Implementation of scheme require
a). Acquisition of additional land at Pugalur (existing) for 2 nos. of 400kV line bays
for Karur PS – Pugalur (existing) 400kV (Quad) 2nd D/c line and its integration with
existing S/s.POWERGRID to facilitate termination of line.
b). 2 nos. new GIS diameter (Line-Tie-Line(F) without future provision of line
reactor) at Pugalur (HVDC) for termination of Karur PS – Pugalur (HVDC) 400kV
(Quad) 2nd D/c line and suitable re-routing of existing 400 kV lines including
implementation of multi circuit tower etc. at Pugalur (HVDC) end. TSP of Pugalur
(HVDC) shall provide space (free of cost) for above scope of work at Pugalur
(HVDC) S/s.
c). TSP of Karur PS shall provide the required space free of cost for the above scope
of work at Karur PS.
3. Transmission System for Integration of Kadapa-II REZ (Phase-I)
Implementation timeframe: 36 Months
BPC: PFC Consulting Limited (PFCCL)
Scope:
+--------+-------------------------------------------------+-------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity/km |
+========+=================================================+=================================================+
| 1. | Establishment of 3x1500 MVA, 765/400 kV and | 765/400kV, 1500 MVA, ICTs – 3 nos. |
| | 7x500 MVA, 400/220kV Kadapa-II Pooling Station | (10x500 MVA incl. 1 spare unit) |
| | along with 1x330 MVAr (765 kV) bus reactors at | 765kV ICT bays – 3 nos. |
| | Kadapa-II PS with provision of two (2) sections | 400kV ICT bays – 3 nos. |
| | of 4500 MVA each at 400kV level | 765kV line bays - 2 nos. (at Kadapa-II PS for |
| | Future Space Provisions: | termination of Kadapa-II -Thiruvalam |
| | 765/400kV, 1500 MVA, ICTs – 3 nos. | 765kV D/c lines) |
| | 765kV ICT bays – 3 nos. | 765 kV, 330 MVAr Bus Reactor – 1 no. |
| | 400kV ICT bays – 3 nos. | (4x110 MVArinc. 1 switchable spare unit for |
| | 400/220kV, 500 MVA, ICTs – 12 nos. | both bus reactor and line reactor) |
| | 400kV ICT bays – 12 nos. | 765 kV Bus Reactor bays – 1 no. |
| | 220kV ICT bays – 12 nos. | 400/220kV, 500 MVA, ICTs – 7 nos. |
| | 765kV line bays – 12 nos. (with provision for | 400kV ICT bays – 7 nos. |
| | SLR) | 220kV ICT bays – 7 nos. |
| | 765 kV, 330 MVAr Bus Reactor – 1 no. | 220kV line bays – 10 nos. |
| | 765 kV Bus Reactor bays – 1 no. | 220kV Bus Sectionalizer: 1 set |
| | 400kV line bays – 12 nos. (with provision for | 220 kV Bus Coupler (BC) Bay – 2 nos. |
| | SLR) | 220 kV Transfer Bus Coupler (TBC) Bay – 2 |
| | 220kV line bays – 15 nos. | nos. |
| | 220kV Bus Sectionalizer: 2 sets | |
| | 220 kV Bus Coupler (BC) Bay – 2 nos. | |
| | 220 kV Transfer Bus Coupler (TBC) Bay – 2 nos. | |
| | 400kV Bus Sectionalizer: 1 set | |
+--------+-------------------------------------------------+-------------------------------------------------+
| 2. | ± 300 MVAr STATCOM at Kadapa-II PS | 400kV bay - 1 no. |
| | | ± 300 MVAr STATCOM – 1 set |
+--------+-------------------------------------------------+-------------------------------------------------+
| 3. | Kadapa-II - Thiruvalam 765 kV D/c line with 330 | ~226 km |
| | MVAr SLR (convertible) at Kadapa-II end on both | 765 kV line bays – 2 nos. of complete |
| | circuits | diameters (GIS) at Thiruvalam |
| | | 765 kV, 330 MVAr SLR at Kadapa-II PS – 2 |
| | | nos. (6x110 MVAr unit) |
| | | Switching Equipment for 765 kV SLR at |
| | | Kadapa-II PS – 2 Nos. |
+--------+-------------------------------------------------+-------------------------------------------------+
Note:
i). POWERGRID shall provide space (free of cost) for above scope of work at Thiruvalam S/S.
4. Transmission system for Evacuation of Power from RE Projects in Solapur SEZ (Phase-II: 2
GW) and Network Expansion Scheme to Enable Drawl of Power from Solapur PS
Implementation timeframe: -Part A: 30 Months and Part B: 36 months from the date of allocation of project
Scope:
+--------+---------------------------------------------------+-------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity/km |
+========+===================================================+=================================================+
| | Part A: Network Expansion Scheme to enable drawl | |
| | of power from Solapur PS | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 1. | Installation of 2x500 MVA, 400/220 kV ICTs (5th& | 400/220 kV, 500 MVA ICTs – 2 Nos. |
| | 6th) at Solapur PS (terminated on 400 kV bus | 400 kV ICT bays – 2 Nos. (Bus Section-1) |
| | section-1 and on segregated 220 kV bus section-2, | 220 kV ICT bays – 2 Nos. (Bus Section-2) |
| | other than the one where RE injection is planned | 220 kV Sectionalization bay – 1 set |
| | (with space kept for ICT 7th on 400 kV bus | 220 kV BC Bay – 1 No. |
| | section-1 and 220 kV bus section-2, to be planned,|
| | in future, as per requirement) Bus Sectionaliser | 220 kV TBC Bay – 1 No. |
| | between 220 kV Bus Section-1, Bus Section-2 | |
| | (proposed for additional RE injection) shall be | |
| | kept normally open and may be closed under | |
| | contingency conditions. | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 2. | 6 Nos. 220 kV line bays on 220 kV Bus Section-2 | 220 kV line bays – 6 Nos. (Bus Section-2) |
| | at Solapur PS for 220 kV downstream lines of | |
| | MSETCL | |
+--------+---------------------------------------------------+-------------------------------------------------+
Note:
1. MSETCL shall implement the following lines within a matching timeframe:
a. LILO of Bale – Osmanabad 220 kV S/c line at Solapur PS
b. LLO of Osmanabad – Barshi 220 kV S/c line at Solapur PS
c. Solapur PS – Jeur 220 kV D/c line (with high capacity HTLS conductor with minimum
capacity of 500 MVA per circuit at nominal voltage)
TSP of Solapur PS shall provide space for above scope of work free of cost
Part B: Transmission system for Evacuation of Power from RE Projects in Solapur SEZ (Phase-
II: 2 GW)
+--------+---------------------------------------------------+-------------------------------------------------+
| 1. | Creation of New 400 kV Bus Section-2 and 220 kV | 400 kV Sectionalization bay – 1 set. |
| | Bus Section-3 with 400 kV and 220 kV Bus | 220 kV Sectionalization bay– 1 set. |
| | Sectionalizers at Solapur PS, along with 3 nos. | |
| | 220 kV line bays on Bus Section-3 & 1 no. 400 kV | |
| | bay on Bus Section-2 for RE Interconnection. | |
+--------+---------------------------------------------------+-------------------------------------------------+
400kV Bus Sectionaliser shall be kept normally OPEN and may
be closed under contingency conditions. 220kV Bus
Sectionaliser(between 220 kV Bus Section-2 and 3) shall be kept
normally OPEN.
• 220 kV BC Bay – 1 No.
• 220 kV TBC Bay – 1 No.
• 400 kV line bays – 1 No. (for
interconnection of RE
Projects at Bus Section-2)
• 220 kV line bays 3 Nos.
(for interconnection of RE
Projects at Bus Section-3)
• 420kV, 125MVAr Bus
Reactor -2 No.
• 400kV Bus Reactor bay - 2
No. on 400 kV Bus Section-
2
+--------+---------------------------------------------------+-------------------------------------------------+
| 2. | 400/220 kV, 3x500 MVA ICT augmentation (8th 9th & | 400/220 kV, 500 MVA ICTS - 3 Nos. |
| | 10th) at Solapur PS on New 400 kV Bus Section-2 | 400 kV ICT bays – 3 Nos. (Bus Section-2) |
| | and 220 kV Bus Section-3 | 220 kV ICT bays – 3 Nos. (Bus Section-3) |
+--------+---------------------------------------------------+-------------------------------------------------+
| 3. | Solapur PS (Bus Section-II) – Jejuri (MSETCL) 400 | 240 km |
| | kV D/c line (Quad ACSR/AAAC/ AL59 Moose | |
| | equivalent) | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 4. | 400 kV line bays at Solapur PS (Bus Section-2) as | 400 kV Bays (AIS) – 2 Nos. at Solapur PS (Bus |
| | well as Jejuri (MSETCL) for Solapur PS (Bus | Section-2) end |
| | Section-II) – Jejuri (MSETCL) 400 kV D/c line | 400 kV Bays (GIS) – 2 Nos. at Jejuri end |
+--------+---------------------------------------------------+-------------------------------------------------+
| 5. | 63 MVAr, 420 kV Switchable line reactors on each | 63 MVAr, 420 kV switchable line reactor 4 Nos. |
| | circuit at both ends of Solapur PS (Bus Section-2)| (2 Nos. at Solapur PS end and 2 Nos. at Jejuri |
| | – Jejuri (MSETCL) 400 kV D/c line (with NGR | end) |
| | bypass arrangement) | Switching equipment for 420 kV line reactor- |
| | | 4 Nos. (2 Nos. at Solapur PS end and 2 Nos. at |
| | | Jejuri end) |
+--------+---------------------------------------------------+-------------------------------------------------+
| 6. | Jejuri (M) - Pune-III 400 kV D/c line (Quad | 20 km. |
| | ACSR/AAAC/AL59 Moose equivalent) (~20 km.) | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 7. | 400 kV line bays at Pune-III as well as Jejuri | 400 kV Bays (GIS) – 2 Nos. at Pune-III end |
| | (MSETCL) for Jejuri (M) – Pune-III 400 kV D/c | 400 kV Bays (GIS) – 2 Nos. at Jejuri end |
| | line | |
+--------+---------------------------------------------------+-------------------------------------------------+
Note:
a. MSETCL shall implement Jejuri (M) – Hinjewadi (M) 400 kV D/c line within a matching
timeframe
b. The interim LILO of the 400 kV Lonikand - Karad line at Jejuri (M) shall be reinstated by
MSETCL after commissioning of the planned Jejuri - Hinjewadi 400 kV D/c line by MSETCL.
c. MSETCL has suggested that the scope at Sl. Nos. 3 & 6 may be implemented by constructing
the Solapur PS Pune-III D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) and
subsequently LILOing the same at Jejuri through multi-circuit towers, in view of severe ROW
constraints in the Jejuri area. The TSP may take note of the same for ease of implementation of
the subject scope.
d. TSPs of Solapur PS & Pune-III S/s shall provide space for above scope of work free of cost
e. MSETCL shall provide space for above scope of work at Jejuri S/s free of cost
5 Common Transmission System Augmentation for Evacuation of Power from 2x800 MW
Gadarwara TPS-II (NTPC) and an Additional 1500 MW RE power at Mandsaur PS - Part A
Implementation timeframe: - 36 Months
BPC: PFC Consulting Limited (PFCCL)
Scope:
+--------+---------------------------------------------------+-------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity/Route length |
+========+===================================================+=================================================+
| 1. | Augmentation of transformation capacity at | 765/400 kV, 1500 MVA ICT – 2 Nos. |
| | Mandsaur PS by 2x1500MVA, 765/400 kV ICTS | 765kV ICT bays – 2 Nos. on Bus Section-II |
| | (5th& 6th),terminated at 765 kV and 400 kV Bus | 400 kV ICT bays – 2 Nos. on Bus Section-II. |
| | Section-II. | |
| | [400kV Bus Sectionaliser between 400kV Bus | |
| | Sections-I and II shall be kept normally open for | |
| | maintaining sufficient SCR on both buses and | |
| | may be closed as per requirement of Grid | |
| | Operator.] | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 2. | Augmentation of transformation capacity at | 3x500 MVA, 400/220 kV ICT – 3 Nos. |
| | Mandsaur PS by 3x500MVA, 400/220kV ICTS | 400 kV ICT bays – 3 Nos. on Bus Section-II |
| | (8th,9th& 10th), terminated at 400 kV Bus Section- | 220 kV ICT bays – 3 Nos. on Bus Section-III. |
| | II & 220kV Bus Section-III. | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 3. | Installation of ±400 MVAr STATCOM at Mandsaur PS | ±400 MVAr STATCOM – 1 No. |
| | | 400 kV bay - 1 No. on Bus Section -II |
| | | (As per inputs from TSP, space for one of the |
| | | future line bays envisaged in 400kV Bus |
| | | Section-II shall be utilised for subject |
| | | STATCOM bay) |
+--------+---------------------------------------------------+-------------------------------------------------+
Note:
a. TSP of Mandsaur PS shall provide the required space free of cost for the above scope of work.
6. Common Transmission System Augmentation for Evacuation of Power from 2x800 MW
Gadarwara TPS-II (NTPC) and an Additional 1500 MW RE power at Mandsaur PS - Part B
Implementation timeframe: 36 Months and for Sl. No. 5 and 6 (31.03.2031)
BPC: PFC Consulting Limited (PFCCL)
Scope:
+--------+---------------------------------------------------+-------------------------------------------------+
| Sl. No. | Scope of the Transmission Scheme | Capacity/km |
+========+===================================================+=================================================+
| 1 | Establishment of 765 kV Gadarwara-Il Substation | 765 kV Line bays – 4 Nos. on Bus Section-I |
| | along with 2x330 MVAR 765 kV bus reactors | (2 Nos. for Kurawar D/c line and 2 Nos. for |
| | Future provision (space for) (including space | Gadarwara TPS-II (NTPC) (Bus Section-II) |
| | required for scope of Sl. No. 5 of this scheme): | D/c line) |
| | 765/400 kV, 1500 MVA ICTs along with bays - 6 | 330 MVAr, 765 kV Bus Reactor- 2 Nos. |
| | Nos. (3 on Bus Section-l & 3 on Bus Section-II) | (7x110 MVAR 1-phase reactors including one |
| | 765 kV line bays along with switchable line | spare unit for bus /line reactors) |
| | reactors – 8 Nos. (2 Nos. on Bus Section-I & 6 | 765 kV Bus Reactor bays – 2 Nos. on Bus |
| | Nos. on Bus Section-II) | Section-I |
| | 765 kV, 330 MVAr Bus Reactor along with bays: 2 | |
| | Nos. (on Bus Section-II) | |
| | 400 kV line bays along with switchable line | |
| | reactors – 16 Nos. (8 Nos. on Bus Section-I & 8 | |
| | Nos. on Bus Section-II) | |
| | 420 kV, 125 MVAr Bus Reactor along with bays: 4 | |
| | Nos. (2 on Bus Section-1 & 2 on Bus Section-II) | |
| | 400/220 kV ICT along with bays - 6 Nos. (3 on | |
| | Bus Section-I & 3 on Bus Section-II) | |
| | 220 kV line bays: 8 No. on Bus Section -I & 8 | |
| | Nos. on Bus Section-II | |
| | 765 kV Sectionaliser bay: 1 set | |
| | 400 kV Sectionalization bay: 1 set | |
| | 220 kV Sectionalization bay: 1 set | |
| | 220 kV BC Bay - 2 Nos. | |
| | 220 kV TBC Bay - 2 Nos. | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 2 | Kurawar – Gadarwara-II 765 kV D/c line, with LILO | ~225km |
| | of one circuit at Bhopal (BDTCL) S/s | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 2(a) | 2 nos. 765 kV line bays at Bhopal S/s for LILO | 765kV line bays – 2 Nos. |
| | of one circuit of Kurawar – Gadarwara-II 765 kV | |
| | D/c line | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 2(b) | 2 nos. 765 kV line bays at Kurawar S/s for | 765kV line bays – 2 Nos. |
| | Kurawar - Gadarwara-II 765 kV D/c line, with LILO | |
| | of one circuit at Bhopal (BDTCL) S/s | |
+--------+---------------------------------------------------+-------------------------------------------------+
| 3 | Installation of 330 MVAr Switchable Line Reactor | 330 MVAr, 765 kV Switchable Line Reactor - 1 |
| | at Gadarwara-II end of Kurawar – Gadarwara-II 765 | No. |
| | kV line | 765 kV Switchable Line Reactor bay - 1 No. |
| | | 110 MVAr, 1-Phase spare reactor - covered at |
| | | Sl. No. 4 |
+--------+---------------------------------------------------+-------------------------------------------------+
| 4 | Installation of 240 MVAr Switchable Line Reactor | 240 MVAr, 765 kV Switchable Line Reactor - 1 |
| | at Bhopal (BDTCL) end of Bhopal (BDTCL) – | No. |
| | Gadarwara-II 765 kV line | 765 kV Switchable Line Reactor bay- 1 No. |
| | | Existing 80 MVAr, 1-Phase spare reactor to be |
| | | utilized. |
+--------+---------------------------------------------------+-------------------------------------------------+
| 5 | Creation of 400 kV level at 765 kV Gadarwara-II | 765/400 kV, 1500 MVA ICT 2 Nos. (7x500 MVA |
| | Substation and Implementation of 2x1500 MVA | single phase ICTS) |
| | 765/400 kV ICTs along with 400 kV line bays | 765 kV ICT bays – 2 Nos. (on Bus Section-I). |
| | | 400 kV ICT bays – 2 Nos. (Bus Section-I). |
| | | 400 kV line bays – 2 Nos. (on Bus Section-I |
| | | (for Gadarwara-II S/s – Gadarwara (STU) 400 |
| | | kV D/c line of MPPTCL) |
+--------+---------------------------------------------------+-------------------------------------------------+
| 6 | 2 Nos. 400 kV line bays at 765/400 kV Seoni (PG) | 400 kV line bays – 2 Nos. |
| | S/s (refer Note d & e) | [for Seoni (PG) - Chhindwara (STU) 400 kV DCDS |
| | | (Quad Moose / High Capacity) line under scope |
| | | of MPPTCL] |
+--------+---------------------------------------------------+-------------------------------------------------+
Note:
a. With the above scope at Sl. No. 2, the following transmission lines shall be established:
i. Kurawar - Gadarwara-II 765 kV S/c line (~225 km),
ii. Kurawar - Bhopal (BDTCL) 765 kV S/c line (~50 km)
iii. Bhopal (BDTCL) – Gadarwara-II 765 kV S/c line (~175 km)
b. TSP of Kurawar S/s & Bhopal S/s shall provide the required space free of cost for the above scope
of work.
c. NTPC shall implement Gadarwara-II - Gadarwara TPS-II (NTPC) (Bus Section-II) D/c line.
d. As per feedback from TSP (POWERGRID) of Seoni (PG) S/s, existing Bays No. 430 (in the diameter
of 765/400 kV ICT-3) and Bay No. 426 & 427 (to be constructed in a new diameter) can be utilized
for termination of the 400 kV lines. Further, one no. line reactor present in the new diameter space
is a cold spare, which shall be relocated within the substation. The scope of shifting and new
foundation shall be under the present scope of work.
e. TSP of Seoni S/s (POWERGRID) shall provide the required space free of cost for the
f. MPPTCL shall implement Gadarwara-II – Gadarwara (STU) 400kV D/c (Quad Moose / High
Capacity) line as well as Seoni (PG) - Chhindwara (STU) 400 kV DCDS (Quad Moose / High
Capacity) line along with associated line bays at Gadarwara (STU) end in matching time-frame.
7. For Schemes at para 5 and 6 above, BPC (PFCCL) to award Part A & Part B schemes together, as
evacuation of additional 1,500 MW of RE power at Mandsaur PS, getting integrated under Part A, is
contingent upon completion of Part B.
8. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines
issued by Ministry of Power in this regard, amended from time to time.
9. BPCs shall ensure RoW optimization as per the CEA's Committee report dated 24.09.2024 for
calculation of reduction of Right of Way (RoW) Width through Technological Options.
10. 400 kV monopole tower structures, insulated cross arms and other RoW corridor optimization measures
to be adopted in urban/ semi-urban areas.
11. 400 kV monopole tower structures to be used where RoW issues are anticipated, while lattice towers
shall be used in other sections.
12. Other RoW optimization measures to be taken in forest/ hilly-terrain areas other than use of monopole.
13. Further, the route must be finalised after validation on PM Gati Shakti portal and physical survey.
[F. No. 34-15/3/2026-Trans]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)