Notification by the Central Electricity Authority adding and revising reporting formats under the Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007.

Detailed Summary

F. No. PCE-I-11-17/5/2021-Legal Division, issued by the Central Electricity Authority on 25th July 2023 under sub-regulation (2) of regulation 9 of the Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007, follows publication of the draft proposal in six newspapers on 28.04.2022 inviting objections and suggestions, which were duly considered; the Authority substitutes sub-regulation (3) of Regulation 2, adds Electricity Regulatory Commissions (CERC, SERCs, JERCs), Power Exchanges and State Nodal Agencies as clauses under sub-regulation (4) of Regulation 3, and adds 19 new reporting formats (Format Nos. 66 to 84) covering, among others, long-term and medium-term power purchase agreements by Independent Power Producers, area clearing prices and transaction details in Power Exchanges (DAM/RTM/GDAM), Term Ahead Market and Green-TAM data, bilateral and cross-border trade data, Deviation Settlement Mechanism volumes, despatch under Reserve Regulation Ancillary Services, Un-Requisitioned Surplus, and monthly renewable energy generation and curtailment data, to be furnished by generating companies, transmission and distribution licensees, power exchanges, load despatch centres and regulatory commissions at specified periodicities.

Full Text

EXTRAORDINARY PART III—Section 4 PUBLISHED BY AUTHORITY No. 523] NEW DELHI, WEDNES DAY, JULY 26, 2023/ SHR AVANA 4, 1945 CG-DL-E-28072023-247685 “ 72 15 मई 73 15 मई 78 15 मई “ (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 2003 के 63 (11) (12) (13) (14) (15) (16) (17) (18) माह-िषन 23 22:00 - 22:15 माह-िषन 23 22:15 - 22:30 माह-िषन 23 22:30 - 22:45 माह-िषन 23 22:45 - 23:00 माह-िषन 24 23:00 - 23:15 माह-िषन 24 23:15 - 23:30 माह-िषन 24 23:30 - 23:45 माह-िषन 24 23:45 - 24:00 िषन:20....20 िषन: 20....20 िषन: 20....20 िषन: 20....20 (ii) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) CENTRAL ELECTRICITY AUTHORITY NOTIFICATION New Delhi, the 25th July , 2023 F. No. PCE -I-11-17/5/2021 -Legal Division. —Whereas the public notices advertising the draft proposal for addition of formats in the Central Electricit y Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007 were published in six newspaper dailies, as required under sub -regulation (2) of regulation 9 of the said regulations for inviting objections and suggestions from all persons likely to be affected thereby, before the expiry of the period of thirty -five days, from the date on which the copies of the newspaper containing the said publications were made available to the public; And whereas copies of the said newspapers containing the public notices and the said draft regulations on website of the Central Electricity Authority were made available to the public on 28.04.2022; And whereas the objections and suggestions received from the public on the said draft regulations were consi dered by the Central Electricity Authority; And whereas the said regulations consist of 65 formats for furnishing of the statistics, returns or information by the licensees, generating companies, person(s) generating electricity for its or his own use and person(s) engaged in generation, transmission, distribution, trading and utilization of electricity to the Central Electricity Authority. And whereas the sub -regulation (2) of regulation 9 of the said regulations inter -alia provides for the methodology for addition/deletion/revision of formats for furnishing of the statistics, returns or information, its time schedule and periodicity through the notification after inviting objections or suggestions from persons likely to be affected thereby. Now, therefore, in exercise of the powers conferred under sub -regulation (2) of regulation 9 of the said regulations, the Central Electricity Authority hereby makes the following addition/ revision of the formats in the Central Electricity Authority (Furnishing of Statis tics, Returns and Information) Regulations, 2007, namely : - 1. The sub-regulation (3) of Regulation 2 shall be substituted , namely :- “All other words and expressions used and not defined in these regulations but defined in the Act, Rules made by the Governme nt of India, other Regulations of CEA and Regulations of CERC assigned to them, shall have the meanings respectively assigned to them in the Act, Rules and Regulations .” 2. The following shall be added after clause (v) of sub -regulation (4) of Regulation (3) ,namely: - “(vi) Electricity Regulatory Commissions (i.e. CERC, SERCs, JERCs); (vii) Power Exchanges; (viii) State Nodal Agency; recognized agency for renewable energy projects. ” 3. The following rows shall be added in the Annexure -I titled “ list of formats, frequency (ies) & target data (s)”, namely: - Title of format Frequency of data furnishing Format No. Target date (by) Report on Long -term & Medium -term power purchase agreement by Independent Power Producers Six month 66 31st October & 30th April Deta ils of Area Clearing Prices (Rs/MWh) - Time block wise on daily basis for DAM/ RTM/ GDAM Monthly 67 05th day Details of electricity transacted in Power Exchanges - time block wise for DAM/ RTM/ GDAM Monthly 68 05th day Details of electricity transacted in Power Exchanges for DAM/ RTM/ GDAM (or any other product/ contract as introduced in future) Monthly 69 05th day Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Trade Dat e Basis) Monthly 70 05th day Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Delivery Date Basis) Monthly 71 05th day Details of electricity transacted in Power Exchanges in DAM/ Annual 72 15th May RTM/ GDAM Intraday/ Daily -Anyday/ Day Ahead Contingency/ Weekly contract wise TAM and Green - TAM data. (On Trade date basis) Annual 73 15th May Intraday/ Daily -Anyday/ Day Ahead Contingency/ Weekly contract wise TAM and G reen - TAM data. (On Delivery date basis) Annual 74 15th May Bilateral Transaction data (to be furnished by NLDC) Monthly 75 05th day Cross border trade details (to be furnished by NLDC) Monthly 76 05th day Details of entities purchasing and selling on Power Exchanges in DAM/ TAM/ GTAM/ RTM/ GDAM markets (to be furnished by NLDC) Daily 77 10:00 Hrs of next day Details of tariff order and truing up order (to be furnished by CERC/ JERCs/ SERCs) Annual 78 15th May Details of Deviation Settlement Mechanis m (DSM) volume (to be furnished by NLDC) Daily 79 10:00 Hrs of next day Details of despatch under Reserve Regulations Ancillary Services (RRAS) (to be furnished by NLDC) Daily 80 10:00 Hrs of next day Details of Un -Requisitioned Surplus (URS) from the g enerations being scheduled by the RLDCs (to be furnished by NLDC) Daily 81 10:00 Hrs of next day Monthly Renewable Energy Generation Monthly 82 10th day of following month Details of Monthly Plant wise Renewable Energy Generation and Curtailment Monthly 83 10th day of following month Details of Renewable Energy Plants commissioned during the Month Monthly 84 10th day of following month 4. The heading of Annexure - II titled - "Statement of specific applicability of formats" shall be substituted, namely :-“ Title of format Format No. Genco Transco Discom Traders/ PXs SEBs/ Licensees/ ED / SNAs NLDC/ RLDCs SLDCs RPCs CPPs/ Industries CERC/ JERC/ SERCs Genco: Generating Companies Transco: Transmission Licensees Discom: Distribution Licensees Traders: T rading Licensees PX: Power Exchanges SEBs: State Electricity Boards SNA: State Nodal Agency NLDC: National Load Despatch Centre RLDC: Regional Load Despatch Centre SLDC: State Load Despatch Centre RPCs: Regional Power Committees CPPs: Captive Power Plants ERCs: Electricity Regulatory Commissions ED: Electricity Department ” 5. The following rows shall be added in the Annexure -II titled - "Statement of specific applicability of formats", namely: - “ Title of format Format No. Genco Transco Discom Traders/ PXs SEBs/ Licensees/ ED/ SNAs NLDC/ RLDCs SLDCs RPCs CPPs/ Industries CERC/ JERC/ SERCs Report on long -term & medium term Power Purchase Agreement by 66 Y Independent Power Producers Details of Area Clearing Prices (Rs/MWh) -Time block wise on daily basis for DAM/ RTM/ GDAM 67 Y Details of electricity transacted in Power Exchanges - time block wise for DAM/ RTM/ GDAM 68 Y Details of electricity transacted in Power Exchanges for DAM/ RTM/ GDAM (or any other product / contract as introduced in future) 69 Y Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Trade Date Basis) 70 Y Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Delivery Date Basis) 71 Y Details of electricity transacted in Power Exchanges in DAM/RTM/GDAM 72 Y Term Ahead Market (TAM) / Green -TAM (GTAM) - Data fo r Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Trade date basis) 73 Y Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts. (On Delivery date basi s) 74 Y Bilateral Transaction Data 75 Y Cross Border Trade Details 76 Y Details of entities purchasing and selling on Power Exchanges in DAM/TAM/GTAM/RTM/ GDAM markets. 77 Y Details of tariff order and truing up orde r by the Electricity Regulatory Commission 78 Y Details of Deviation Settlement Mechanism 79 Y (DSM) volume. Details of despatch under Reserve Regulations Ancillary Services (RRAS) 80 Y Details of Un - Requisitioned Surplus (URS ) from the generations being scheduled by the RLDCs 81 Y Monthly Renewable Energy Generation 82 Y Y Y Y Y Details of Monthly Plant wise Renewable Energy Generation and Curtailment 83 Y Y Y Y Y Details of Renewable Energy Plants commis sioned during the Month 84 Y Y Y Y Y 6. The Format no. 66,67,68,69,70,71,72,73,74,75,76,77,78,79,80,81,82,83 and 84 respectively shall be added after Format no.65, namely: - “FORMAT No. – 66” Periodicity - Half Yearly (April -Sep & Oct-March) Submission by- 31st October & 30th April REPORT ON LONG -TERM & MEDIUM -TERM POWER PURCHASE AGREEMENT BY INDEPENDENT POWER PRODUCERS NAME OF THE GENERATING COMPANY: S. No. Regis tration No. on E-Gen portal Name of the Project Installed Capacity (in MW) Date of Commenc e ment of Supply (dd-mm- yyyy) Project Location (State) Sector (Central/ State/ Private) Technology (Hydro /Thermal etc.) Unit Number Unit Capacity (in MW) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Contracted Capacity (in MW) (Please provide details if contract is not for RTC supply) Untied Capacity (in MW) (Please provide details if contract is not for RTC supply) Start date of PPA (dd-mm- yyyy) End date of PPA (dd-mm- yyyy) (11) (12) (13) (14) Counter parties of PPA (along with MW capacity) Basis of tariff (Section or 63 of Electricity Act or Any other) Tariff during reporting period (Rs/kWh) Fixed Charge (Rs/kWh) Variable Charge (Rs/kWh) (15) (16) (17) (18) Notes: (i) If Registration No. on E-Gen portal is being filled in column (2), the details in column (3) to (8) need not be filled. (ii) Column (8) and (9) to be filled only if PPA is based on specific unit. RTC - Round The Clock. FORMAT - 67 PERIODICITY - MONTHLY SUBMISSION BY - 05-MM -YYYY Name of Power Exchange: (in .xls / API file) Details of Area Clearing Prices (Rs/MWh) -Time block wise on daily basis for DAM/ RTM/ GDAM Date Hour Time Block *A1 *A2 *E1 *E2 *N1 *N2 *N3 DD-MM- YYYY 1 00:00 - 00:15 DD-MM- YYYY 1 00:15 - 00:30 DD-MM- YYYY 1 00:30 - 00:45 DD-MM- YYYY 1 00:45 - 01:00 DD-MM- YYYY 2 01:00 - 01:15 DD-MM- YYYY 2 01:15 - 01:30 DD-MM- YYYY 2 01:30 - 01:45 DD-MM- YYYY 2 01:45 - 02:00 DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY DD-MM- YYYY 23 22:00 - 22:15 DD-MM- YYYY 23 22:15 - 22:30 DD-MM- YYYY 23 22:30 - 22:45 DD-MM- YYYY 23 22:45 - 23:00 DD-MM- YYYY 24 23:00 - 23:15 DD-MM- YYYY 24 23:15 - 23:30 DD-MM- YYYY 24 23:30 - 23:45 DD-MM- YYYY 24 23:45 - 24:00 *S1 *S2 *S3 *W1 *W2 *W3 Any other bid area in future Wt. Avg. Market Clearing Price FORMAT - 68 PERIODICITY - MONTHLY SUBMISSION BY - 05-MM -YYYY Name of Power Exchange: (in .xls / API file) Details of electricity transacted in Power Exchanges - time block wise for DAM/ RTM/ GDAM. Date Hour Time Block Purchase Bid (MWh) Sell Bid (MWh) MCV (MWh) DD-MM- YYYY 1 00:00 - 00:15 DD-MM-YYYY 1 00:15 - 00:30 DD-MM-YYYY 1 00:30 - 00:45 DD-MM-YYYY 1 00:45 - 01:00 DD-MM-YYYY 2 01:00 - 01:15 DD-MM-YYYY 2 01:15 - 01:30 DD-MM-YYYY 2 01:30 - 01:45 DD-MM-YYYY 2 01:45 - 02:00 DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY 23 22:00 - 22:15 DD-MM-YYYY 23 22:15 - 22:30 DD-MM-YYYY 23 22:30 - 22:45 DD-MM-YYYY 23 22:45 - 23:00 DD-MM-YYYY 24 23:00 - 23:15 DD-MM-YYYY 24 23:15 - 23:30 DD-MM-YYYY 24 23:30 - 23:45 DD-MM-YYYY 24 23:45 - 24:00 Cleared Volume (MWh) Congestion (MWh) Volume Loss - Real Time Curtailment (MWh) Final Scheduled Volume (MWh) Wt. Avg. MCP (Rs/MWh) MCP: Market Clearing Price; MCV: Market Clearing Volume FORMAT - 69 PERIODICITY - MONTHLY SUBMISSION -BY-05-MM -YYYY Name of Power Exchange: (in .xls / API file) Detail s of electricity transacted in Power Exchanges for DAM/ RTM/ GDAM (or any other product/ contract as introduced in future). Date Purchase Bid (MWh) Sell Bid (MWh) MCV (MWh) Cleared Volume (MWh) DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY Total Minimum Maximum Average Congestion (MWh) Volume Loss - Real Time Curtailment (MWh) Final Scheduled Volume (MWh) Wt. Avg. MCP (Rs/MWh) MCP: Market Clearing Pric e; MCV: Market Clearing Volume FORMAT - 70 PERIODICITY - MONTHLY SUBMISSION -BY-05-MM -YYYY (in .xls / API file) Name of Power Exchange: Term Ahead Market (TAM) / Green -TAM (GTAM)) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency/ Weekly contracts (any other Contract / Product introduced in future). ( On Trade Date Basis ) Date Market Clearing Volume for traded date (MWh) Congestion for traded date (MWh) Cleared Volume for traded date (MWh) Wt. Avg. Market Clearing Price (for the traded volume of electricity) (Rs/MWh) DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY Total Minimum Maximum Average FORMAT - 71 PERIODICITY - MONTHLY SUBMISSION -BY-05-MM -YYYY (in .xls / API file) Name of Power Exchange: Term Ahead Market (TAM) / Green -TAM (GTAM) - Data for Intraday/ Daily/Anyday/ Day Ahead Contingency (DAC)/ Weekly contracts (any other Contract/ Product introduced in future). On Delivery Date Basis Date Cleared Volume for delivery date (MWh) Real Time Curtailment (MWh) Final Scheduled Volume for delivery date (MWh) Wt. Avg. Market Clearing Price (for the delivered volume of electricity) (Rs/MWh) DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY DD-MM-YYYY Total Minimum Maximum Average FORMAT - 72 PERIODICITY - ANNUALLY DATA OF YEAR: 20… - 20…. SUBMISSION -BY-15-MAY -YYYY (in .xls / API file) Name of Power Exchange: Details of electricity transacted in Power Exchanges in DAM/ RTM/ GDAM Month Purchase Bid (MWh) Sell Bid (MWh) Market Clearing Volume (MWh) Cleared Volume (MWh) APR -YYYY MAY - YYYY JUN- YYYY JUL- YYYY AUG- YYYY SEPT - YYYY OCT - YYYY NOV - YYYY DEC - YYYY JAN- YYYY FEB- YYYY MAR - YYYY Total Congestion (MWh) Volume Loss - Real Time Curtailment (MWh) Final Scheduled Volume (MWh) Wt. Avg. Market Clearing Price (Rs/MWh) FORMAT - 73 PERIODICITY - ANNUALLY DATA OF YEAR: 20… - 20…. SUBMISSION -BY-15-MAY -YYYY (in .xls / API fi le) Name of Power Exchange: Intraday/ Daily -Any day/ Day Ahead Contingency/ Weekly contract wise TAM and Green -TAM data (any other Contract/ Product introduced in future). (On Trade date basis ) Month Market Clearing Volume for traded date (MU) Congestion for traded date (MU) Cleared Volume for traded date (MU) Wt. Avg. Market Clearing Prices (for the traded volume of electricity) (Rs/kWh) APR -YYYY MAY - YYYY JUN- YYYY JUL- YYYY AUG - YYYY SEPT - YYYY OCT - YYYY NOV - YYYY DEC - YYYY JAN- YYYY FEB- YYYY MAR - YYYY Total FORMAT - 74 PERIODICITY - ANNUALLY DATA OF YEAR: 20… - 20…. SUBMISSION -BY-15-MAY -YYYY (in .xls / API file) Name of Power Exchange: Intraday/ Daily -Anyday/ Day Ahead Contingency/ Weekly contract wise TAM and Green -TAM data (any other Contract/ Product introduced in future). ( On Delivery date basis ) Month Cleared Volume for delivery date (MU) Real Time Curtailment (MU) Final Scheduled Volume for delivery date (MU) Wt. Avg. Market Cl earing Price (for the delivered volume of electricity) (Rs/kWh) APR - YYYY MAY - YYYY JUN- YYYY JUL- YYYY AUG - YYYY SEPT - YYYY OCT - YYYY NOV - YYYY DEC - YYYY JAN- YYYY FEB- YYYY MAR - YYYY Total FORMAT - 75 PERIODICITY - MONTHLY DATA OF YEAR: 20- 20 SUBMISSION -BY-05-MM -YYYY (in .xls / API file) Provider: National Load Despatch Centre (NLDC) BILATERAL TRANSACTION DATA Entity Name Region Bilateral Transaction Buy Bilateral Transaction Sell Banking transactions (MU)* Direct (MU) Through Trader (MU) Direct (MU) Through Trader (MU) * Banking energy quantum under bilateral transactions (MU) between the contracting parties to be shown here. FORMAT - 76 PERIODICITY - MON THLY DATA OF YEAR: 20… - 20…. SUBMISSION -BY-05-MM -YYYY (in .xls / API file) Provider: National Load Despatch Centre (NLDC) CROSS BORDER TRADE DETAILS Sl. No. Name of the Country Name of the Traders Types of Contracts* Total Export (MU) Total Import (M U) * MoU between Governments, any other instrumentalities, etc. through which the electricity transaction is taking place. FORMAT - 77 PERIODICITY - DAILY SUBMISSION BY - 10:00 hours of next day (in .xls / API file) Provider: National Load Despatch Centre (NLDC) Details of entities purchasing and selling on Power Exchanges in DAM/ TAM/ GTAM/ RTM/ GDAM markets. NTITY IEX PXIL Any other PX approved by CERC Purchase (MU) Sell (MU) Purchase (MU) Sell (MU) Purchase (MU) Sell (MU) FORMAT - 78 PERIODICITY - ANNUALLY SUBMISSION -BY-15-MAY -YYYY (in .xls / API file) Name of the Electricity Regulatory Commission: DETAILS OF TARIFF ORDER AND TRUING UP ORDER BY THE _________________ELECTRICITY REGULATORY COMMISSION Sl. No. Name of the Distribution Licensees/ Transmission Licensees/ generating companies, etc. Date of application of the Tariff petition & Tariff year Date of issue of the Tariff Order & Tariff year Control Period of the Tariff Order & Tarif f year Date of application of the Truing up petition & Tariff year Date of issue of the Truing up Order & Tariff year Truing ups period Truing up Order & Tariff year FORMAT - 79 PERIODICITY - DAILY SUBMISSION BY - 10:00 hours of next day (in .xls / API file) Provider: National Load Despatch Cent re (NLDC) Details of Deviation Settlement Mechanism (DSM) volume. Region Entity/ Beneficiary DSM Volume (MU) Import Export FORMAT - 80 PERIODICITY - DAILY SUBMISSION BY - 10:00 hours of next day (in .xls / API file) Provider: National Load Despatch Centre (NLDC) Details of despatch under Reserve Regulations Ancillary Services (RRAS) Region Entity Ancillary Despatched Volume (MU) Regulation UP Volume (MU) Regulation Down Volume (MU) FORMAT - 81 PERIODICITY - DAILY SUBMISSION BY - 10:00 hours of next day (in .xls / API file) Provider: National Load Despatch Centre (NLDC) Details of Un -Requisitioned Surplus (URS) from the generatio ns being scheduled by the RLDCs Region Entity/ Beneficiary Quantum of URS (MW) Quantum of URS energy (MU) FORMAT -82 PERIODICITY - MONTHLY SUBMISSION BY (DATE): - 10TH OF THE FOLLOWING MONTH Monthly Renewable Energy Generation 1. Name: of RLDC/SLDC/Genco/SNA/ED/Discom : 2. Data: for the Month/Year - Sl. No. Type of Renewable Energy Generation Source Installed Capacity (MW) as on last date of the month Generation (MUs) during the month Central Sector State Sector Private Sector Total Central Sector State Sector Private Sector Total 1 Wind (i) Wind Onshore (ii) Wind Offshore 2 Solar - Ground Mounted (i) Photovoltaic (PV) (ii) Solar Thermal 3 Solar - Rooftop 4 Solar -Floating 5 Hybrid 6 Bio Mass 7 Bagasse 8 Small Hydro (upto 25 MW) 9 Others (Waste to Energy etc) (Source may be specified ) Grand Total: Note: - The Generation/ Installed capacity is to be reported for the plant located within the physical boundary of the respective State/ UT. Abbreviations :- Hybrid: Generation Plant where more than one renewable primary source of energy, including, storage is used. FORMAT NO: 83 PERIODICITY: -MONTHLY SUBMISSION BY (DATE): - 10TH OF THE FOLLOWING MONTH Deta ils of Monthly Plant wise Renewable Energy Generation and Curtailment 1. Name of RLDC/SLDC/Genco/SNA/ED/Discom: 2. Data for the Month/Year - S. No. E-gen Registration No. *Name of the Plant *Name of the Gener -ating Comp -any *Location/ District/ State *Installed Capacity (MW) (1) (2) (3) (4) (5) (6) 1 Plant 1 2 Plant 2 *Type [Wind(Onshore/Offshore)/Sol ar {(Ground Mounted - PV/Solar Thermal) /Rooftop/Floating}/ Hybrid/Small Hydro/ Biomass/Bagasse/ Others**(Waste to Energy) *Sec tor (Central / State / Private) RE Generation (MUs) RE Curtailment (MUs) Reason of Curtailment/ Remarks (7) (8) (9) (10) (11) Note: 1. The data in Column Nos. (3) to (8) are static data and need to be provided one time only for Existing/New Projects, in case E-Gen Registration No. is not available. 2. In case of 'Other**', the source may be specified. Abbreviations: - Hybrid: Generation Plant where more than one renewable primary source of energy, including, storage is used. FOR MAT NO: 84 PERIODICITY: -MONTHLY SUBMISSION BY (DATE): - 10TH OF THE FOLLOWING MONTH Details of Renewable Energy Plants commissioned during the Month Data for the Month: - Name of RLDC/SLDC/SNA/Genco/ED/Discom: - Sl. No. E-Gen Registration No. *Name of the Plant *Plant Capacity (MW) *Type[Wind(Onshore/Offshore)/Sol ar {(Ground Mounted - PV/Solar Thermal) /Rooftop/Floating}/ Hybrid/Small Hydro/ Biomass/Bagasse/ Others**(Waste to Energy) Total: *Location (District/State) Capacity Commi ssioned (MW) Date of Commissioning (DD/MM/YYYY) Note: 1. The data in columns marked as (*) are static data and need to be provided one time only for Existing/ New Projects, in case E-Gen Registration No.is not available. 2. In case of 'Other s**', the source may be specified. Abbreviations: - Hybrid: Generation Plant where more than one renewable primary source of energy, including, storage is used. ” RAKESH KUMAR, Secy . [ADVT. -III/4/Exty./305/2023 -24] Note: The principal regulations were published in the Gazette of India, Extraordinary, Part III, Section 4, vide notification F.No. CEA/PLG/LF/9/40/07 dated the 10th April, 2007 and last amended vide notification No. PCE -I-11-17/5/2021 -Legal Division dated the 17th March, 2022. Uploaded by Dte . of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054 .

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free