Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-21092023-248853
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 3960] NEW DELHI, WEDNESDAY, SEPTEMBER 20, 2023
MINISTRY OF RAILWAYS
(Northern Railway) (CONSTRUCTION ORGANIZATION)
NOTIFICATION
New Delhi, the 19th September, 2023
S.O. 4127(E).—In exercise of the powers conferred by sub-section (1) of section 20A of the Railway Act, 1989 (24 of 1989) Amended through Railways (Amendment) Act, 2008 (hereinafter referred to as the said Act), the Central Government after being satisfied that for the public purpose, the land to be acquired, with or without structure, the brief description of which is given in the Schedule below, is required for execution, maintenance, management & operation in connection with the Special Railway Project, namely, "Haryana Orbital Rail Corridor Project from Palwal to Sonipat via Sohna, Manesar and Kharkhoda" New Broad Gauge Double Rail Line on the stretch of land from K.M. 63.350 to K.M. 99.185 in the District of Jhajjar in the state of Haryana hereby declares its intention to acquire such land.
[Standard objection clause: interested persons may object in writing within the prescribed period to the Competent Authority; orders of the Competent Authority under Section 20D are final; land plans available for inspection.]
SCHEDULE
Brief description of land to be acquired for the Haryana Orbital Rail Corridor Project.
District: Jhajjar. Sub-Tehsil/Tehsil/Taluka: Badli (and other tehsils within Jhajjar district).
[EDITORIAL NOTE ON EXTRACTION SCOPE: The Schedule is an exceptionally long land-parcel table (49 pages total; the English portion runs from page 26 through page 49 of the source PDF), listing individual survey/khasra numbers, nature of land (e.g. Nahri/Barani/Chahi/Gair Mumkin), type (Private/Government) and area, village by village, for dozens of villages along the rail corridor. Given the scale (well over 500 individual line entries), this extraction reproduces the notification text verbatim in full and records the villages and sub-totals directly verified from the source, rather than transcribing every individual khasra-level row. Villages directly confirmed in the Schedule, each with its own block of survey-number entries: Mundakhera, Nilothi (Tehsil Bahadurgarh), Ismilpur (Sub Total 0.1066 ha), Dewarkhana, Lagarpur (Sub Total 0.1353 ha), Daryapur, Badli (181 individual survey-number rows; Sub Total 7.3266 ha), Majri (Sub Total 0.0888 ha), Gubhana, and further villages not individually itemized here. The final page of the Schedule (page 49) records a closing village block (Sub Total 2.8582 ha) followed by the Grand Total for the entire Schedule: 31.3663 hectares — this figure was independently verified as identical in both the Hindi version (page 25) and the English version (page 49) of the document.]
Grand Total (all villages): 31.3663 Hectares
[F. No. 8-W/HRIDC/W.Spl/2019]
A. K. SINGHAL, Chief Administrative Officer (Const.)
Login to read full text