MINISTRY OF POWER
NOTIFICATION
New Delhi, the 14th March , 2024
S.O. 1364(E).—In exercise of the powers conferred by sub -para 3.2 of Para 3 of the Guidelines circulated
under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Go vernment, on the recommendation s of
18th meeting of National Committee on Transmission, hereby notifies the following transmission schemes under
TBCB mode, with details of respective Bid -Process Coordinators (BPCs): -
Sl.
No. Name & Scope of the Transmis sion Scheme
1.
Transmission system for evacuation of power from Rajasthan REZ Ph -IV (Part -3: 6 GW) [Bikaner
complex] : Part A
Tentative implementation time -frame: 24 months
BPC: REC Power Development and Consultancy Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capacity (MVA) / Route Length (Km)
1. Establishment of 6x1500 MVA, 765/400 kV
& 6x500 MVA, 400/220 kV Bikaner -IV
Pooling Station along with 2x240 MVAr
(765kV) & 2x125 MVAr (420kV) Bus
Reactors at a suitable location near Bikaner
Future provisions at Bikaner -IV
PS: Space for
765 kV line bays along with switchable
line reactors – 8 nos.
765kV Bus Reactor along with bay: 1
no.
400 kV line bays along with switchable
line reactor –4 nos.
400 kV line bays–2 nos.
400/220kV ICT along with bays -4 nos.
400 kV Bus Reactor along with bay: 1
no.
400kV Sectionalizer bay: 1 set
220 kV line bays for connectivity of RE
Applications -5 nos.
220kV Sectionalizer bay: 2 sets Bikaner -IV PS -AIS
765/400 kV 1500 MVA ICTs - 6 Nos. (19x500
MVA including one spare unit)
400/220 kV 500 MVA ICTs -6 Nos.
765 kV line bays – 2 nos. (for 765 kV
interconnection with Siwani S/s)
400 kV line bays - 4 Nos.(For LI LO of both ckts
of Bikaner II PS - Bikaner III PS)
765 kV ICT bays -6 Nos.
400 kV ICT bays - 12 Nos.
220 kV ICT bays - 6 Nos.
240 MVAr Bus Reactor -2 Nos. (7x80 MVAr,
including one spare unit)
765 kV Bus reactor bays -2 Nos.
125 MVAr Bus Reactor -2 Nos.
400 kV Bu s reactor bays - 2 Nos.
220 kV line bays: 6 nos. (for RE connectivity)
400kV line bays (for RE connectivity) - 3 nos.
400kV Sectionalizer bay: 1 set
220 kV Sectionalizer bay: 1 set
220 kV BC (2 nos.) bays and 220 kV TBC (2
220 kV BC (2 nos.) bays and 22 0 kV
TBC (2 nos.) bays
nos.) bays
400 kV bays: 2 Nos. ( for STATCOM)
2. STATCOM (2x +300MVAr) along with MSC
(4x125 MVAr) & MSR (2x125 MVAr) at
Bikaner -IV PS STATCOM (2x +300MVAr) along with MSC
(4x125 MVAr) & MSR (2x125 MVAr)
3. LILO of both ckts of Bikaner II PS - Bikaner
III PS (Quad) direct line at Bikaner -IV PS Length -20 km (Quad) (LILO length)
4. Bikaner -IV PS – Siwani 765 kV D/c line
along with 240 MVAr switchable line reactor
for each circuit at each end
Line Length -260 km
765 kV, 240 MVAr switchable line reactors at
Bikaner -IV PS end – 2 Nos.
765 kV, 240 MVAr switchable line reactors at
Siwani S/s end – 2 Nos.
Switching equipment for 765kV, 240 MVAr
switchable line reactors at Bikaner -IV PS end – 2
Nos.
Switching equipment for 765kV, 240 MVAr
switchable line reactors at Siwani S/s end – 2 Nos.
5. Siwani– Fatehabad (PG) 400 kV D/c line
(Quad) Line Length ~80 km (Quad)
6. Siwani – Patran (Indi Grid) 400 kV D/c line
(Quad) along with 80 MVAr switchable line
reactor for each circuit at Siwani S/s end
Line Length -160 km (Quad)
420 kV, 8 0 MVAr switchable line reactors at
Siwani S/s end – 2 Nos.
Switching equipment for 420kV, 80 MVAr
switchable line reactors at Siwani S/s end – 2 Nos.
400 kV GIS duct :700 m at Patran S/s
7. 2nos. 400 kV line bays each at Fatehabad
(PG) & Patran (Indi Grid) S/s 400 kV line bays at Fatehabad (PG) S/s – 2 Nos.
400 kV line bays at Patran (Indi Grid) S/s – 2 nos.
8. 2nos. 765 kV line bays at Siwani S/s 765 kV line bays at Siwani S/s – 2 Nos.
9. 4 nos. 400 kV line bays at Siwani S/s 400 kV line bay s at Siwani S/s – 4 Nos.
(for 400kV interconnections)
2.
Transmission system for evacuation of power from Rajasthan REZ Ph -IV (Part -3: 6 GW) [Bikaner
complex] : Part B
Tentative Implementation Time: 24 months
BPC: REC Power Development and Consultancy Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capa city (MVA)/ Route Length (Km)
1. Establishment of 765/400kV, 6x1500 MVA
S/s at suitable location near Siwani (Distt.
Bhiwani) along with 2x240 MVAr (765kV)
Bus Reacto r & 2x125 MVAr (420kV) Bus
Reactor
Future provisions at Siwani S/s:
Space for
765 kV line bays along with switchable
line reactors – 8
765kV Bus Reactor along with bay: 1
nos.
400 kV line bays along with switchable
line reactor –8 nos.
400 kV Bus R eactor along with bays: 1
no.
400kV Sectionalizer bay: 1 set Siwani S/s - AIS
765/400 kV 1500 MVA ICTs - 6 nos. (19x500
MVA including one spare unit)
765 kV ICT bays -6 no.
400 kV ICT bays - 6 no.
765 kV line bays – 2 nos. (for 765kV
interconnection with Bik aner-IV PS)
400 kV line bays – 4 nos. (for 400kV
interconnections)
240 MVAr Bus Reactor -2 no. (7x80 MVAr,
including one spare unit)
765 kV Bus reactor bays -2 no.
125 MVAr Bus Reactor -2 nos.
400 kV Bus reactor bays - 2 nos.
400kV Sectionalizer bay: 1 set
400kV bays : 2 nos. (for STATCOM)
2. Bikaner -IV PS – Siwani 765 kV D/c (2nd) line
along with 240 MVAr switchable line reactor
for each circuit at each end
Line Length -260 km
765 kV, 240 MVAr switchable line reactors at
Bikaner -IV PS end – 2 nos.
765 kV , 240 MVAr switchable line reactors at
Siwani S/s end – 2 nos.
Switching equipment for 765kV, 240 MVAr
switchable line reactors at Bikaner -IV PS end – 2
nos.
Switching equipment for 765kV, 240 MVAr
switchable line reactors at Siwani S/s end – 2 nos.
3. STATCOM (2x +300MV Ar) along with MSC
(4x125 MV Ar) & MSR (2x125 MV Ar) at
Siwani S/s STATCOM (2x +300MVAr) along with MSC
(4x125 MVAr) & MSR (2x125 MVAr)
4. Siwani – Sonipat (PG) 400 kV D/c line
(Quad) along with 63 MVAr switchable line
reactor for ea ch circuit at Siwani S/s end
Line Length -150 km (Quad)
420 kV, 63 MVAr switchable line reactors at
Siwani S/s end – 2 nos.
Switching equipment for 420kV, 63 M VAr
switchable line reactors at Siwani S/s end – 2 nos.
5. Siwani – Jind (PG) 400 kV D/c l ine (Quad) Line Length -110 km (Quad)
6. 2 nos. 400 kV line bays each at Jind(PG) &
Sonipat (PG) S/s 400 kV line bays at Jind (PG) S/s – 2 nos.
400 kV line bays at Sonipat (PG) S/s – 2 nos.
7. 2 nos. 765 kV line bays at Bikaner -IV PS 765 kV line bay s at Bikaner -IV PS – 2 nos.
3.
Transmission Scheme for integration of Davanagere / Chitradurga REZ and Bellary REZ in Karnataka
A. Transmission system for integration of Davanagere/ Chitradurga REZ
Tentative Implementation Time: 24 months
BPC: P FC Consulting Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capacity (MVA)/ Route Length (Km)
1. Establishment of 765/400kV 4x1500 MVA,
400/220kV 4x500 MVA Pooling Station near
Davanagere / Chitradurga, Karnataka with
provision of two (2) sectio ns of 4500 MVA
each at 400kV level and provision of four (4)
sections of 2500 MVA each at 220kV level
Future Space Provisions:
765/400kV, 1500 MVA, ICTs – 2 nos.
765kV ICT bays – 2 nos.
400kV ICT bays – 2 nos.
400/220kV, 500 MVA, ICTs – 6 nos.
400kV ICT bays – 6 nos.
220kV ICT bays – 6 nos.
765kV line bays – 8 nos. (with provision for
SLR)
400kV line bays – 10 nos. (with provision
for SLR)
220kV line bays – 12 nos.
220kV Bus Sectionalizer : 2 sets
220 kV Bus Coupler (BC) Bay – 3 nos.
220 kV Transfer Bus C oupler (TBC) Bay –
3 nos.
400kV Bus Sectionalizer : 1 set 765/400kV, 1500 MVA, ICTs – 4 Nos. (13x500
MVA incl. 1 spare unit)
765 kV ICT bays – 4 Nos.
400 kV ICT bays – 4 Nos.
400/220 kV, 500 MVA, ICTs – 4 Nos.
400 kV ICT bays – 4 Nos.
220 kV ICT bays – 4 Nos.
765 kV line bays – 4 Nos. (at Davanagere /
Chitradurga PS for ter mination of LILO of
Narendra (New) – Madhugiri 765kV D/c line)
220kV line bays – 6 Nos.
220kV Bus Sectionalizer : 1 set
220 kV Bus Coupler (BC) Bay – 1 No.
220 kV Transfer Bus Coupler (TB C) Bay – 1 no.
2. LILO of Narendra New – Madhugiri 765kV
D/c line at Davanagere / Chitradurga
765/400kV PS (~40 km) {with 240 MVAr
SLR at both ends on Narendra New –
Davanagere section (~280 km) and 330
MVAr SLR at Davanagere end on
Davanagere – Madhugiri section (~200 km)} ~40 km
765 kV, 240 MVAr SLR at Davanagere /
Chitradurga PS – 2 Nos. (7x80 MVAr inc. 1
switchable spare unit)
765 kV, 240 MVAr SLR at Narendra New – 2
Nos. (7x80 MVAr inc. 1 switchable spare unit)
765 kV, 330 MVAr SLR at Davanagere /
Chitradurga PS – 2 Nos. (6x110 MVAr switchable
units)
3. 2x330 MVAr (765kV) bus reactors at
Davanagere/ Chitradurga PS 765 kV, 330 MVAr Bus Reactor – 2 Nos. (7x110
MVAr inc. 1 switchable spare unit for both bus
reactor and line reactor)
765 kV Bus Reactor b ays – 2 nos.
4. Upgradation of Narendra New – Madhugiri
765kV D/c line (presently charged at 400kV
level) at its rated 765kV voltage level 765 kV line bays – 2 Nos. (at Narendra New)
765 kV line bays – 2 Nos. (at Madhugiri)
5. Upgradation of Madhugiri
{Tumkur(Vasantnarsapura)} to its rated
voltage of 765kV level alongwith 3x1500
MVA, 765/400kV ICTs and 2x330 MVAr,
765kV bus reactors
(Upgradation of Madhugiri
{Tumkur(Vasantnarsapura)} to its rated
765kv level was earlier allocat ed to
POWERGRID for impleme ntation through
RTM route vide MOP OM No.15/3/2018 -
Trans -Pt(1) dated 23.01.2020) 765/400 kV, 1500 MVA, ICTs – 3 nos. (10x500
MVA incl. 1 spare unit)
765kV ICT bays – 3 nos.
400kV ICT bays – 3 nos.
765 kV, 330 MVAr Bus Reactor – 2 nos. {7x110
MVAr including 1 spare unit}
765 kV Bus Reactor bays – 2 nos.
B. Transmission system for integration of Bellary REZ
Tentative Implementation Time: 30 months
BPC: PFC Consulting Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capacity (MVA)/ Route Length (Km)
1. Establishment of 4x500 MVA, 400/220kV
Pooling Station near Bellary area (Bellary
PS), Karnataka
Future Space Provisions:
400/220kV, 500 MVA, ICTs – 6 nos.
400kV ICT bays – 6 nos.
220kV ICT bays – 6 nos.
400kV line bays – 6 nos.
(with provision f or SLR)
220kV line bays – 12 nos.
220kV Sectionalizer : 3 sets
220 kV Bus Coupler (BC) Bay – 3 nos.
220 kV Transfer Bus Coupler (TBC) Bay –
3 nos. 400/220 kV, 500 MVA, ICTs – 4 nos.
400 kV ICT bays – 4 nos.
220 kV ICT bays – 4 nos.
400 kV line bays – 2 nos . (at Bellary PS for
termination of Bellary PS – Davanagere /
Chitradurga line))
220 kV line bays – 6 nos.
220 kV Bus Coupler (BC) Bay – 1 no.
220 kV Transfer Bus Coupler (TBC) Bay – 1 no.
2. Bellary PS – Davanagere / Chitradurga
400kV (Quad ACSR moose) D/c line ~100 km
400 kV line bays – 2 nos. (at Davanagere /
Chitradurga )
3. 2x125MVAr 420kV bus reactors at Bellary
PS 420 kV, 125 MVAr bus reactors – 2 nos.
420 kV, 125 MVAr bus reactor bays – 2 nos.
4. Transmission Scheme for integration of Bijap ur REZ in Karnataka
Tentative Implementation Time: 24 months
BPC: PFC Consulting Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capacity (MVA) / Route Length (Km)
1. Establishment of 400/220 kV, 5x500 MVA
Pooling Station near Bijapur (Vijayapura) ,
Karnataka
Future Space Provisions:
400/220kV, 500 MVA, ICTs – 5 nos. 400/220 kV, 500 MVA, ICTs – 5 nos.
400 kV ICT bays – 5 nos.
220 kV ICT bays – 5 nos.
400 kV line bays – 2 nos. (at Bijapur PS for
termination of Bijapur PS – Raichur New line))
220 kV line bays – 10 nos.
400kV ICT bays – 5 nos.
220kV ICT bays – 5 nos.
400kV line bays – 6 nos.
(with provision for SLR)
220kV line bays – 14 nos.
220kV Sectionalizer : 2 sets
220 kV Bus Coupler (BC) Bay – 2 nos.
220 kV Transfer Bus Coupler (TBC) Bay –
2 nos. 220 kV Sectionalizer : 1 sets
220 kV Bus Coupler (BC) Bay – 2 nos.
220 kV Transfer Bus Coupler (TBC) Bay – 2 nos.
2. Bijapur PS – Raichur New 400kV (Quad
ACSR moose) D/c line ~150 km
400 kV line bays – 2 nos. (at Raichur New)
3. 2x125MVAr 420kV bus rea ctors at Bijapur
PS 420 kV, 125 MVAr bus reactors – 2 nos.
420 kV, 125 MVAr bus reactor bays – 2 nos.
Note: POWERGRID shall provide space for 2 nos. of 400 kV line bays at Raichur New for termination of Bijapur
PS – Raichur New 400 kV (Quad ACSR moose) D/c line.
5. Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 & 4 (2x1 000 MW)
Tentative Implementation Time: 30 months (Dec 2026)
BPC: PFC Consulting Limited
Scope:
Sl. No. Scope of the Transmission Scheme Capacity (MVA) / Route Length (Km)
1. KNPP 3&4 – Tuticorin -II GIS PS 400 kV
(quad) D/c line (~120 km)
{Line & bays at Tuticorin -II GIS under
ISTS scope and bays at KNPP under
NPCIL scope} ~120 km
400 kV GIS line bays at Tuticorin -II GIS – 2 nos.
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued
by Ministry of Power in this regard, amended from time to time.
[F. No. 15/3/2018 -Trans -Part(4) ]
OM KANT SHUKLA , Director (Transmission)