Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-1312024-259392
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4976] | NEW DELHI, THURSDAY, DECEMBER 12, 2024/AGRAHAYANA 21, 1946
S.O. 5376(E).— In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the recommendations of 24th meeting of National Committee on Transmission, hereby notifies the following transmission schemes under TBCB mode, with details of respective Bid-Process Coordinator (BPC): -
Sl No. | Name & Scope of the Transmission Scheme
1. | Transmission system for Evacuation of Power from RE Projects in Rajgarh (1500 MW) SEZ in Madhya Pradesh-Phase III
Tentative implementation timeframe: Implementation timeframe of elements at Sl. No. 1, 2a, 3 & 4 shall be 24 months from date of SPV Transfer & for element at Sl. No. 2b shall be 31.03.2028 in matching timeframe of RE generator (Purvah Green Power Pvt. Ltd.: 297 MW)
BPC: REC Power Development and Consultancy Limited
8050 GI/2024
(1)
2 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)]
Scope:
Sl. No. | Scope of the Transmission Scheme | Capacity
1. | Creation of New 220 kV Bus Section (3rd) with 220 kV Bus Sectionaliser and 400/220 kV, 3x500 MVA ICT augmentation (7th, 8th & 9th) at Pachora PS terminated on 220 kV Bus Section (3rd) | • 500 MVA 400/220kV ICT – 3 Nos.
• 400 kV ICT bay – 3 Nos. (on Section-II)
• 220 kV ICT bay –3 Nos. (on Section-III)
• 220 kV Bus Sectionaliser bays – 1 set
• 220 kV BC & TBC – 1 No. each
2a. | 3 Nos. 220 kV line bays for RE interconnection on Bus Section (3rd) | • 3 Nos. on Sec-III
2b. | 1 No. 220 kV line bay for RE Interconnection of Purvah Green Power Pvt. Ltd. on Bus Section (3rd) | • 1 No. on Sec-III
3. | Pachora PS – Rajgarh (PG) 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along with associated line bays at both ends and 50 MVAr Switchable Line Reactors (Sw LR) on each ckt at both ends | • Line length:180 km.
• 400 kV line bays: 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
• 420 kV, Switchable Line Reactors (Sw LRs): 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
4. | Installation of 1x125 MVAR, 420 kV bus reactor at Pachora PS (400 kV Bus Section- II) | • 125 MVAr, 420 kV Bus reactor – 1 No.
• 400 kV Bus reactor bay: 1 No.
2. | Transmission system for Evacuation of Power from RE Projects in Neemuch (1000 MW) SEZ in Madhya Pradesh-Phase II
Tentative implementation timeframe: 24 months from date of SPV transfer
BPC: PFC Consulting Limited
Scope:
Sl. No. | Scope of the Transmission Scheme | Capacity
1. | Creation of New 220 kV Bus Section-II at Neemuch PS with Augmentation of transformation capacity by 3x500 MVA, 400/220 kV ICTs (3rd, 4th & 5th) at Neemuch S/s along with associated bays. | • 500 MVA 400/220 kV ICT – 3 Nos.
• 400 kV ICT bay – 3 Nos.
• 220 kV ICT bay – 3 Nos. (on Sec- II)
• 220 kV Bus Sectionaliser bays – 1 set
• 220 kV BC & TBC – 1 No. each
2. | 4 Nos. 220 kV Line bays at Neemuch PS for RE nterconnection | • 220 kV Bays – 4 Nos. on Sec-II
3. | Neemuch PS – Pachora PS 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along associated Line bays and 50 MVAr Switchable Line Reactor (Sw LR) on each ckt at both ends | • Line length: 190km.
• 400 kV Line bays: 4 Nos. (2 at Neemuch PS & 2 at Pachora PS) 420 kV, Switchable Line Reactors (Sw LRs): 4 Nos. (2 at Neemuch PS & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Neemuch PS & 2 at Pachora PS)
[PART II-SEC. 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 3
4. | Establishment of 2x500 MVA, 400/220 kV S/s at Handiya along with 2x125 MVAr 420 kV Bus Reactors | • 400/220 kV ICTs: 2 Nos.
• 400 kV ICT Bays: 2 Nos.
• 220 kV ICT Bays: 2 Nos.
• 400 kV Line bays: 6 Nos.
• 220 kV Line bays for MPPTCL – 8 Nos.
• 125 MVAr, 420 kV Bus reactor – 2 Nos.
Future provision (space for):
• 400 kV line bays along with switchable line reactors- 6 Nos. (Sec-II)
• 400/220 kV ICT along with bays 4 Nos. (1 No. on Sec-I & 3 Nos. on Sec-II)
• 400 kV Bus Reactor along with bays: 2 Nos. (Sec-II)
• 220 kV line bays: 8 Nos. (on Sec-II)
• 400 kV Sectionalization bay: 1 set
• 220 kV Sectionalization bay: 1 set
• 220 kV TBC & BC: 1 No.
5. | Pachora PS -Handiya 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along with associated bays at Pachora PS end and 50 MVAr Switchable Line Reactor (Sw LR) on each ckt at both ends | • Line length: 190 km.
• 400 kV bays: 2 Nos. (at Pachora PS)
• 420 kV, Sw LRs: 4 Nos. (2 at Handiya & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Handiya & 2 at Pachora PS)
6. | LILO of Khandwa (PG) – Itarsi (PG) 400 kV D/c (Twin Moose) line at Handiya S/s | • LILO route length : 22 km (88 ckm)
• The Khandwa (PG) – Itarsi (PG) 400 kV D/c line is of Twin Moose configuration and LILO shall be ofsimilar conductor configuration
7. | Installation of 1x125 MVAR, 420 kV bus reactor (2nd) at Neemuch PS | • 125 MVAr, 420 kV Bus reactor – 1 No.
• 400 kV Bus reactor bay: 1 No.
Note:TSP of Neemuch & Pachora PS shall provide space for above scope of work
4 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)]
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by Ministry of Power in this regard, amended from time to time.
[F.No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 11th December, 2024
S.O. 5376(E).— In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government, on the recommendations of 24th meeting of National Committee on Transmission, hereby notifies the following transmission schemes under TBCB mode, with details of respective Bid-Process Coordinator (BPC): -
Sl No. | Name & Scope of the Transmission Scheme
1. | Transmission system for Evacuation of Power from RE Projects in Rajgarh (1500 MW) SEZ in Madhya Pradesh-Phase III
Tentative implementation timeframe: Implementation timeframe of elements at Sl. No. 1, 2a, 3 & 4 shall be 24 months from date of SPV Transfer & for element at Sl. No. 2b shall be 31.03.2028 in matching timeframe of RE generator (Purvah Green Power Pvt. Ltd.: 297 MW)
BPC: REC Power Development and Consultancy Limited
Scope:
Sl. No. | Scope of the Transmission Scheme | Capacity
1. | Creation of New 220 kV Bus Section (3rd) with 220 kV Bus Sectionaliser and 400/220 kV, 3x500 MVA ICT augmentation (7th, 8th & 9th) at Pachora PS terminated on 220 kV Bus Section (3rd) | • 500 MVA 400/220kV ICT – 3 Nos.
• 400 kV ICT bay – 3 Nos. (on Section-II)
• 220 kV ICT bay –3 Nos. (on Section-III)
• 220 kV Bus Sectionaliser bays – 1 set
• 220 kV BC & TBC – 1 No. each
2a. | 3 Nos. 220 kV line bays for RE interconnection on Bus Section (3rd) | • 3 Nos. on Sec-III
2b. | 1 No. 220 kV line bay for RE Interconnection of Purvah Green Power Pvt. Ltd. on Bus Section (3rd) | • 1 No. on Sec-III
3. | Pachora PS – Rajgarh (PG) 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along with associated line bays at both ends and 50 MVAr Switchable Line Reactors (Sw LR) on each ckt at both ends | • Line length:180 km.
• 400 kV line bays: 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
• 420 kV, Switchable Line Reactors (Sw LRs): 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Rajgarh (PG) & 2 at Pachora PS)
[PART II-SEC. 3(ii)] | THE GAZETTE OF INDIA : EXTRAORDINARY | 5
4. | Installation of 1x125 MVAR, 420 kV bus reactor at Pachora PS (400 kV Bus Section- II) | • 125 MVAr, 420 kV Bus reactor – 1 No.
• 400 kV Bus reactor bay: 1 No.
2. | Transmission system for Evacuation of Power from RE Projects in Neemuch (1000 MW) SEZ in Madhya Pradesh-Phase II
Tentative implementation timeframe: 24 months from date of SPV transfer
BPC: PFC Consulting Limited
Scope:
Sl. No. | Scope of the Transmission Scheme | Capacity
1. | Creation of New 220 kV Bus Section-II at Neemuch PS with Augmentation of transformation capacity by 3x500 MVA, 400/220 kV ICTs (3rd, 4th & 5th) at Neemuch S/s along with associated bays. | • 500 MVA 400/220 kV ICT – 3 Nos.
• 400 kV ICT bay – 3 Nos.
• 220 kV ICT bay – 3 Nos. (on Sec- II)
• 220 kV Bus Sectionaliser bays – 1 set
• 220 kV BC & TBC – 1 No. each
2. | 4 Nos. 220 kV Line bays at Neemuch PS for RE nterconnection | • 220 kV Bays – 4 Nos. on Sec-II
3. | Neemuch PS – Pachora PS 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along associated Line bays and 50 MVAr Switchable Line Reactor (Sw LR) on each ckt at both ends | • Line length: 190km.
• 400 kV Line bays: 4 Nos. (2 at Neemuch PS & 2 at Pachora PS) 420 kV, Switchable Line Reactors (Sw LRs): 4 Nos. (2 at Neemuch PS & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Neemuch PS & 2 at Pachora PS)
4. | Establishment of 2x500 MVA, 400/220 kV S/s at Handiya along with 2x125 MVAr 420 kV Bus Reactors | • 400/220 kV ICTs: 2 Nos.
• 400 kV ICT Bays: 2 Nos.
• 220 kV ICT Bays: 2 Nos.
• 400 kV Line bays: 6 Nos.
• 220 kV Line bays for MPPTCL – 8 Nos.
• 125 MVAr, 420 kV Bus reactor – 2 Nos.
Future provision (space for):
• 400 kV line bays along with switchable line reactors- 6 Nos. (Sec-II)
• 400/220 kV ICT along with bays 4 Nos. (1 No. on Sec-I & 3 Nos. on Sec-II)
• 400 kV Bus Reactor along with bays: 2 Nos. (Sec-II)
• 220 kV line bays: 8 Nos. (on Sec-II)
• 400 kV Sectionalization bay: 1 set
• 220 kV Sectionalization bay: 1 set
• 220 kV TBC & BC: 1 No.
5. | Pachora PS -Handiya 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) along with associated bays at Pachora PS end and 50 MVAr Switchable Line Reactor (Sw LR) on each ckt at both ends | • Line length: 190 km.
• 400 kV bays: 2 Nos. (at Pachora PS)
• 420 kV, Sw LRs: 4 Nos. (2 at Handiya & 2 at Pachora PS)
• Switching equipment for 400 kV line reactor – 4 Nos. (2 at Handiya & 2 at Pachora PS)
6. | LILO of Khandwa (PG) – Itarsi (PG) 400 kV D/c (Twin Moose) line at Handiya S/s | • LILO route length : 22 km (88 ckm)
• The Khandwa (PG) – Itarsi (PG) 400 kV D/c line is of Twin Moose configuration and LILO shall be ofsimilar conductor configuration
6 | THE GAZETTE OF INDIA : EXTRAORDINARY | [PART II-SEC. 3(ii)]
7. | Installation of 1x125 MVAR, 420 kV bus reactor (2nd) at Neemuch PS | • 125 MVAr, 420 kV Bus reactor – 1 No.
• 400 kV Bus reactor bay: 1 No.
Note:TSP of Neemuch & Pachora PS shall provide space for above scope of work
2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by Ministry of Power in this regard, amended from time to time.
[F.No. 15/3/2018-Trans-Part(4)]
NAOREM INDRAKUMAR SINGH, Under Secy. (Transmission)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
GORAKHA NATH YADAVA Digitally signed by GORAKHA NATH YADAVA
Date: 2024.12.13 16:06:57 +05'30'
Login to read full text