Two notifications of the Ministry of Power under the Guidelines issued under Section 63 of the Electricity Act, 2003: one appointing PFC Consulting Limited as Bid Process Coordinator for two transmission schemes, and the other modifying the scope of four previously notified transmission schemes.

Detailed Summary

By S.O. 4829(E) dated 7th November 2023, the Ministry of Power, in exercise of powers under sub-para 3.2 of Para 3 of the Guidelines issued under Section 63 of the Electricity Act, 2003 (36 of 2003) and on the recommendation of the 15th meeting of the National Committee on Transmission, appoints PFC Consulting Limited as Bid Process Coordinator for two transmission schemes to be implemented within 24 months of SPV transfer: the transmission system strengthening for interconnection of the Bhadla-III and Bikaner-III complex (including a Bhadla-III-Bikaner-III 765kV D/c line of about 150 km), and the network expansion scheme in Gujarat for evacuation of about 3.6 GW of load under Phase-I in the Jamnagar area (including a Jamnagar GIS pooling station, the Halvad-Jamnagar 765kV D/c line of 170 km, and multiple associated LILO connections and reactors); by a further notification, S.O. 4830(E), also dated 7th November 2023 and issued under the same statutory authority following the 15th NCT meeting, the Central Government modifies the scope of four previously notified Tariff Based Competitive Bidding transmission schemes: the Transmission Scheme for Solar Energy Zone in Bidar (2500 MW), Karnataka (originally notified vide S.O. 386(E) dated 24.01.2020 and modified vide S.O. 1486(E) dated 29.03.2023), now including a Bidar pooling station and the Bidar PS-Maheshwaram (PG) 765kV D/c line of 242 km; the Transmission System for evacuation of power from the Renewable Energy Zone in Rajasthan (20 GW) under Phase-III Part D (originally S.O. 5032(E) dated 03.12.2021), revised to include the Sikar-II-Khetri 765kV D/c line (90 km) and Sikar-II-Narela 765kV D/c line (260 km); the Transmission System for evacuation of power from the Renewable Energy Zone in Rajasthan (20 GW) under Phase-III Part I (originally S.O. 235(E) dated 13.01.2023), with a revised commissioning schedule of 48 months for Bipole-I and 54 months for Bipole-2; and the Transmission Scheme for integration of the Renewable Energy Zone (Phase-II) in Koppal-II (Phase-B), Karnataka (originally S.O. 855(E) dated 23.02.2023), with implementation schedule reduced from 36 to 24 months; the Bid Process Coordinators for these four schemes remain unchanged; both notifications are signed by Bihari Lal, Under Secy. (Transmission), under F. No. 15/3/2018-Trans-Part(5).

Full Text

7012 GI/202 3 (1) EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY 1. No. 4630] NEW DELHI, TUES DAY , NOVEMBER 7, 2023/ KARTIKA 16, 1945 CG-DL-E-07112023-249941 2. MINISTRY OF POWER NOTIFICATION New Delhi, the 7th November , 2023 S.O. 4829 (E).— In exercise of the powers conferred by sub -para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act , 2003 (no. 36 of 2003), the Central Government, on recommendations of 15th meeting of National Committee on Transmission, hereby appoints the following Bid -Process Coordinators (BPCs) for the Transmission Schemes, as shown against the name of the Transmi ssion Schemes: - Sl. No. Name & Scope of the Transmission Scheme Bid Process Coordinator 1. Transmission system strengthening for interconnections of Bhadla -III & Bikaner - III complex Tentative Implementation Timeframe: 24 months from date of SPV Transfer Scope: Sl. No. Scope of the Transmission Scheme 1 Bhadla -III – Bikaner -III 765 kV D/c line along with 240 MVAr switchable line reactor for each circuit at Bhadla -III end (line length~150 km) as well as associ ated 2 Nos. of 765kV line bay(s) at each at Bhadla -III & Bikaner - III end Note: i. Developer of Bhadla -III PS to provide space for two nos. of 765 kV line bays along with space for two nos. of switchable line reactors ii. Developer of Bikaner -III PS to prov ide space for two nos. of 765 kV line bays PFC Consulting Limited iii. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. 2. Network Expansion scheme in Gujarat for drawl of about 3.6 GW load under Phase -I in Jamnagar area Tentative Implementation Time: 24 months from date of SPV transfer Scope: 1. Establishment of 2x1500 MVA 765/400 kV Jamnagar (GIS) PS with 2x330 MVAR 765 kV bus reactor and 2x125 MVAR 420 kV bus reactor. Future Provisions : Space for • o 765/400 kV ICT along with bays - 4 no. o 765 kV line bays along with switchable line reactors – 10 nos. o 765 kV Bus Reactor along with bay: 2 no. o 765 kV Sectionaliser bay: 1 -set o 400 kV line bays along with switchabl e line reactor – 8 nos. o 400/220 kV ICT along with bays -6 nos. o 420 kV Bus Reactor along with bay: 2 no. o 400 kV Sectionalization bay: 1 - set o 220 kV line bays: 14 nos. o 220 kV Sectionalization bay: 1 set o 220 kV BC: 1 no. o 80MVAR 1 -ph spare reactor unit 765/400 kV, 1500 MVA ICT -2 Nos. 765 kV ICT bays - 2 Nos. 400 kV ICT bays - 2 Nos. 330 MVAR 765 kV bus reactor - 2 Nos. 125 MVAR 420 kV bus reactor - 2 Nos. 765 kV reactor bay - 2 Nos. 765 kV line bay - 2 Nos. 400 kV reactor bay - 2 Nos. 400 kV line bay - 10 Nos. 500 MVA, 765/400 kV 1 -Ph Spare ICT -1 No. 110 MVAR, 765 kV, 1 -ph reactor (spare unit for line/bus reactor) -1 No. 2. Halvad – Jamnagar 765 kV D/c line Route length: 170 km 3. 2 nos. of 765 kV line bays at Halvad for termination of Halvad – Jamnagar 765 kV D/c line 765 kV line bays – 2 Nos. (for Halvad end) 4. 330 MVAr switchable line reactors on each ckt at Jamnagar end of Halvad – Jamnagar 765 kV D/c line (with NGR bypass arrangement)  330 MVAr, 765 kV switchable line reactor - 2 Nos.  Switching equipments for 76 5 kV line reactor - 2 Nos. 5. LILO of Jam Khambhaliya PS – Lakadia 400 kV D/c (triple snowbird) line at Jamnagar. LILO route length: 5 km. 6. 50 MVAr, 420 kV switchable line reactors on each ckt at Jamnagar end of Jamnagar – Lakadia 400kV D/c line (wit h NGR bypass arrangement)  50 MVAr, 420 kV switchable line reactor - 2 Nos.  Switching equipments for 400 kV line reactor - 2 Nos. 7. Jamnagar – Jam Khambhaliya 400 kV D/c (Quad ACSR/AAAC/AL59 moose equivalent) line Route Length~ 50 km. 8. 2 nos. of 400kV line bays at Jam Khambhaliya for termination of Jamnagar – Jam Khambhaliya 400kV D/c (Quad ACSR/AAAC/AL59 moose equivalent) line  400 kV line bays (GIS) – 2 Nos. (for Jam Khambhaliya end) 9. LILO of CGPL – Jetpur 400kV D/c (triple snowbird) line at Jamnag ar. LILO route length: 65 km. PFC Consulting Limited 10. 80MVAr, 420kV switchable line reactors on each ckt at Jamnagar end of Jamnagar – CGPL 400kV D/c line (with NGR bypass arrangement)  80 MVAr, 420 kV switchable line reactor - 2 Nos.  Switching equipments for 400 kV line reac tor- 2 Nos. 11. LILO of both ckts of Kalavad – Bhogat 400kV D/c line (Twin AL -59) at Jam Khambhaliya PS  LILO route length: 10 km. 12. 4 nos. of 400kV line bays at Jam Khambhaliya for LILO of both ckts of Kalavad – Bhogat 400kV D/c line  400 kV line bays (GIS) – 4 Nos. (for Jam Khambhaliya end) 13. ±400 MVAr STATCOM with 3x125 MVAr MSC & 2x125 MVAr MSR at Jamnagar 400kV Bus section  ±400 MVAr STATCOM (with MSC/MSR)  400 kV bay – 2 no. (1 no. for STATCOM and 2nd for Dia. completion)* * The TSP shall imple ment one complete diameter (GIS) consisting of 2 main bays & 1 Tie bay in one and half breaker scheme Note: i. Bay(s) required for completion of diameter (GIS) in one -and-half breaker scheme shall also be executed by the TSP. ii. TSP (JKTL) shall enable Inter -tripping scheme on Jamnagar – Jam Khambhaliya 400 kV D/c line (for tripping of the 63 MVAR switchable line reactor at Jam Khambhalya PS end along with the main line breaker) after commissioning of the above system. iii. TSP of the present scheme shall implement Inter -tripping scheme on Jamnagar – Lakadia 400 kV D/c line (for tripping of the 50MVAR switchable line reactor at Jamnagar end along with the main line breaker) after commissioning of the above system. iv. The line lengths mentioned above are approximate as t he exact length shall be obtained after the detailed survey. 2. The appointment of the Bid Process Coordinator is subject to the conditions laid down in the Guidelines issued by Ministry of Power in this regard, ame nded from time to time. [F. No. 15/3/2018 -Trans -Part(5)] BIHARI LAL , Under Secy . (Transmission) 1. 2. NOTIFICATION New Delhi, the 7th November , 2023 S.O. 4830(E). — In exercise of the powers conferred by sub - para 3.2 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (no. 36 of 2003), the Central Government had notified/ modified scope of following transmission schemes for implementation under Tariff Based Competitive Bidding (TBCB) vide Gazette Notification men tioned below table: Sl. No. Name of the Scheme Gazette Notification by which Scheme was notified 1. Transmission Scheme for Solar Energy Zone in Bidar (2500 MW), Karnataka S.O. 386(E) dated 24.01.2020 [F.No.15/3/2018 -Trans -Part(1) and further modified by S.O. 1486(E) dated 29.03.2023 [F.No. 15/3/2018 -Trans - Part(2)] 2. Transmission System for evacuation of power from REZ in Rajasthan (20 GW) under Phase -III Pat D S.O. 5032(E) dated 03.12.2021 [F.No.15/3/2018 -Trans -Part(1) 3. Transmission System for evacua tion of power from REZ in Rajasthan (20 GW) under Phase -III Part I S.O. 235(E) dated 13.01.2023 [F.No.15/3/2018 -Trans -Part(1) 4. Transmission Scheme for integration of Renewable Energy Zone (Phase -II) in Koppal -II (Phase -B) in Karnataka S.O. 855(E) dated 23.02.2023 [F.No.15/3/2018 -Trans -Part(2) 2. Now, the Central Government has decided to modify the scope of above mentioned four schemes after examining the recommendations of the 15th meeting of National Committee on Transmission (NCT). As such, the scopes of schemes are hereby modified as under: Sl.SL. No. Name of Transmission Scheme and its Revised Scope 1. Transmission Scheme f or Solar Energy Zone in Bidar (2500 MW), Karnataka Revised scope of the Transmission Scheme: Sl. No. Revised Scope of the Transmission Scheme Capacity/Km 1. Establishment of 765/400 kV 3x1500 MVA, 400/220 kV 5x500 MVA pooling station at suitable borde r location near Bidar with 765 kV (1x240 MVAR) and 400 kV (1x125 MVAR) Bus Reactor 765 kV Future Provision i. Space for future 765/400 kV ICT along with associated bay: 1 no. ii. Space for future 765 kV Bus Reactor along with associated bay: 1 no. iii. Space for add itional future line bays with SLR: 8 nos. iv. Space for additional future 765/400 kV ICT along with associated bay: 2 nos. 400 kV Future Provision i. Space for future line bay: 8 nos. ii. Space for future 765/400 kV ICT bay: 1 no. iii. Space for future 400/220 kV ICT a long with associated bay: 2 nos. iv. Space for additional future line bay with SLR: 2 nos. v. Space for additional future 765/400 kV ICT bay: 2 nos. vi. Space for additional future 400/220 kV ICT along with associated bay: 4 nos. 220 kV Future Provision i. Space for fut ure 400/220 kV ICT bays: 2 nos. ii. Space for future line bays: 4 nos. iii. Space for additional future 400/220 kV ICT bays: 4 nos. iv. Space for additional future line bay: 6 nos. v. Space for additional future 220 kV Bus Sectionalizer: 2 sets vi. Space for additional fut ure 220 kV TBC bay: 2 nos. vii. Space for additional future 220 kV BC bay: 2 nos. 765/400 kV, 1500 MVA, ICTs – 3 Nos. (10x500 MVA including 1 spare unit) 500 MVA, 400/220 kV ICT – 5 Nos. 765 kV ICT bays – 3 Nos. 400 kV ICT bays – 8 Nos. 220 kV ICT bays – 5 No s. 765 kV line bays – 2 Nos. 220 kV line bays – 8 Nos. 765 kV, 240 MVAr Bus reactor – 1 No. (3x80 MVAr) 765 kV Bus reactor bays – 1 No. 125 MVAr, 420 kV Bus reactor – 1 No. 420 kV Bus reactor bay – 1 No. 220 kV Bus sectionalizer – 1set. 220 kV Bus coupler b ays – 2 Nos. 220 kV Transfer Bus Coupler bays – 2 Nos. 2. Bidar PS – Maheshwaram (PG) 765 kV D/C line Route Length – 242 km 3. 2 nos. of 765 kV line bays at Maheshwaram (PG) GIS substation for termination of Bidar PS – Maheshwaram (PG) GIS 765 kV D/C line 765 kV line bays (GIS) – 2 4. 765 kV, 1x240 MVAR Switchable Line Reactor for each circuit at Bidar PS end & Maheshwaram (PG) end of Bidar PS - Maheshwaram (PG) GIS 765 kV D/C line 240 MVAr, 765 kV line reactor – 4 Nos. [7x80 MVAr at Bidar PS an d 7x80 MVAr at Maheshwaram (PG), including 1 spare unit for both Bus Reactor & Line Reactor] Switching equipments for 765 kV reactor – 2 Nos. each at Bidar PS & Maheshwaram. Note: POWERGRID shall provide space for 2 no. of 765 kV line bays with provision for 240 MVAr SLR at Maheshwaram (PG) substation for termination of Bidar PS – Maheshwaram (PG) 765 kV D/c line 2. Transmission System for evacuation of power from REZ in Rajasthan (20 GW) under Ph ase-III Part D-Phase I Revised Scope of the Transmission Scheme: Sl. No. Scope of the Transmission Scheme Capacity/ Km 1. Sikar -II – Khetri 765 kV D/c line  Length – 90 km 2. Sikar -II – Narela 765 kV D/c line along with 240 MVAr Switchable line reac tor for each circuit at each end of Sikar -II – Narela 765 kV D/c line  Length – 260 km  Switching equipment for 765 kV, 240 MVAR Switchable line reactor –4 nos.  765kV, 240 MVAr Switchable line reactor - 4 nos. 3. 765 kV line bays at Sikar –II for Sikar -II – Khetri 765 kV D/c line and Sikar -II – Narela 765 kV D/c line  765 kV line bays – 4 nos. 4. 2 nos. of 765 kV line bays at both Khetri and Narela S/s  765 kV line bays – 4 nos. Note: i. Developer of Sikar -II S/s to provide space for 4 nos. of 765 kV line ba ys at Sikar -II S/s along with space for two nos. of switchable line reactors ii. Developer of Narela S/s to provide space for 2 nos. of 765 kV line bays along with space for switchable line reactors at Narela S/s iii. Powergrid to provide space for two nos. of 765 kV line bays at Khetri substation iv. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. 3. Transmission System for evacuation of power from REZ in Rajasthan (20 GW) under Phase -III Part I Modi fied scope of the Scheme: Revised commissioning schedule is 48 months for Bipole -I and 54 months for Bipole -2 4. Transmission Scheme for integration of Renewable Energy Zone (Phase -II) in Koppal -II (Phase -B) in Karnataka Modified Scope of the Scheme: Implementation schedule of Transmission Scheme is reduced from 36 months to 24 months. 3. Bid Process Co -ordinators for above scheme will remain unchanged, as per original notification. [F. No. 15/3/2018 -Trans -Part(5)] BIHARI LAL, Under Secy . (Transmission ) Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free