The Ministry of Power appoints Bid Process Coordinators for four transmission scheme parts under the Khavda area renewable energy evacuation project in Gujarat, pursuant to Section 63 of the Electricity Act, 2003.

Detailed Summary

In notification S.O. 3894(E) dated 29 August 2023, the Ministry of Power, exercising powers under sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (36 of 2003), and on recommendation of the 14th meeting of the National Committee on Transmission, appoints Bid Process Coordinators (BPCs) for the Transmission System for Evacuation of Power from the potential renewable energy zone in Khavda area, Gujarat under Phase-IV (7 GW), comprising REC Power Development and Consultancy Limited for Part A (works including a 765 kV bus section at KPS3, the KPS3(GIS)-Lakadia(AIS) 765 kV double-circuit line of route length 185 km, and the KPS1(GIS)-Bhuj PS 765 kV second double-circuit line of route length 110 km) and Part C (works including the Boisar-II(GIS) substation and the South Olpad(GIS)-Boisar-II(GIS) 765 kV double-circuit line of route length 225 km), and PFC Consulting Limited for Part B (works including a GIS substation south of Olpad, the Vadodara(GIS)-South Olpad(GIS) 765 kV double-circuit line of route length 140 km, and the Ahmedabad-South Olpad(GIS) 765 kV double-circuit line of route length 250 km); each part carries a tentative implementation timeframe of 24 months from SPV transfer, matching the other parts of Khavda Phase-IV, with final timelines to be indicated in the RfP Document.

Full Text

EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY No. 3733] NEW DEL HI, MON DAY , SEPTEMBER 4, 2023/ BHADRA 13, 1945 CG-DL-E-06092023-248580 2. • 400/220 केिी, 500 2] 3. 4) 2) 7x500 • 240 7x80 • 125 400/220 केिी, 500 2) 7x80 10x500 • 240 -10 • 400/220 केिी, • 125 (1) MINISTRY OF POWER NOTIFICATION New Delhi, the 29th August, 2023 S.O. 3 894(E).—In exercise of the powers conferred by sub -para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (no. 36 of 2003), the Central Gov ernment, on recommendations of 14th meeting of National Committee o n Transmission, hereby appoints the following Bid -Process Coordinators (BPCs) for the Transmission Schemes, as shown against the name of the Transmission Schemes: - Sl. No. Name & Scope of the Tra nsmission Scheme Bid Process Coordinator 1. Transmission S ystem for Evacuation of Power from potential renewable energy zone in Khavda area of Gujarat under Phase -IV (7 GW): Part A Tentative Implementation timeframe: 24 months from SPV transfer a nd match ing with Parts B, C & D of Khavda Ph -IV (7 GW) Scope: Sl. No. Scope of the Transmission Scheme Capacity/ Route length 1. Creation of 765 kV bus section -II at KPS3 (GIS) along with 765 kV Bus Sectionaliser & 1x330 MVAR, 765 kV Bus Reactors on Bus Section -II Bus section – II shall be created at 765 kV & 400 kV level both with 3x1500 MVA, 765/400 kV ICTs at Bus Section -II Bus Section -II at KPS3 765 kV Bus Sectionaliser – 1 set 1500 MVA, 765/400 kV ICT – 3 Nos. 330 MVAR, 765 kV Bus Reactor – 1 No . 765 kV reactor bay – 1 No. 765 kV ICT bays – 3 Nos. 2. Creation of 400 kV bus Section -II at KPS3 (GIS) along with 400 kV Bus Sectionaliser & 1x125 MVAR, 420 kV Bus Reactors on Bus Section -II and 3 Nos. 400 kV bays at Bus Section -II for RE interconnectio n Bus Se ction-II at KPS3 400 kV Bus Sectionaliser – 1 set 125 MVAR, 420 kV Bus Reactors – 1 No. 400 kV reactor bay – 1 No. 400 kV ICT bays – 3 Nos. (for ICTs at Sl. 1 above) 400 kV line bays – 3 Nos. (for RE interconnection) 3. KPS3 (GIS) – Lakadia (AIS) 765 kV D /C line Route length: 185 km 4. 2 Nos. of 765 kV line bay s each at KPS3 (GIS) & Lakadia (AIS) for KPS3 (GIS) – Lakadia (AIS) 765 kV D/C line • 765 kV line bays (GIS) – 2 Nos. (at KPS3 end Bus section -II) REC Power Development and Consultancy • 765 kV line bays (AIS) – 2 Nos. (at Lakadia end) 5. ±300 MVAR STATCOM with 1x125 MVAR MSC, 2x125 MVAR MSR at K PS3 400 kV Bus section -II • ±300 MVAR STATCOM (with 1x125 MVAR MSC, 2x125 MVAR MSR) • 400 kV bay – 1 No. 6. KPS1 (GIS) – Bhuj PS 765 kV 2nd D/C line • Route length: 110 km 7. 2 Nos. of 765 kV line ba ys each at KPS1 (GIS) & Bhuj PS for KPS1 (GIS) – Bhuj PS 765 kV D/C line • 765 kV line bays (GIS) – 2 Nos. (at KPS1 end Bus section -II) • 765 kV line bays (AIS) – 2 Nos. (at Bhuj end) 8. 330 MVAR switchable line reactors at KPS3 end of KPS3 (GIS) – Lakadia 765 kV D/C line (with NGR bypass arrangement) • 330 MVAR, 765 k V switchable line reactor - 2 Nos. • Switching equipment for 765 kV line reactor - 2 Nos. • 1x110 MVAR spare switchable reactor unit at KPS3 (GIS) end Note: i. Bay(s) required for completion of d iameter (GIS) in one -and-half breaker scheme, shall also be execute d by the TSP. ii. TSP of KPS3 shall provide space for work envisaged at Sl. 1, 2, 4, 5 & 8. iii. The TSP of the present scheme shall arrange for additional land for installation of STATCOM (with MS C/MSR) a s specified at Sl. No. 5 at KPS3 and TSP of KPS3 shall pro vide space for 1 No. 400 kV bay for termination of STATCOM. iv. TSP of KPS1 and Bhuj PS shall provide space for work envisaged at Sl. No. 7. v. The TSP of the present scheme shall arrange for add itional land adjoining Lakadia S/s for creation of 2 Nos. 765 kV di ameter consisting of 1 main bay & 1 Tie bay (for each diameter) in one -and-half breaker AIS scheme, towards implementation of 2 Nos. 765 kV line bays at Lakadia S/s (at Sl. No. 4) associate d with K PS3 – Lakadia 765 kV D/c line and the same shall be extenda ble in future for integration of 2nd main bay (future line with switchable line reactor) for diameter completion. vi. The line lengths mentioned above are approximate as the exact length shall be obta ined after the detailed survey. vii. The implementation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Document. 2. Transmission System for Evacuation of Power f rom potential renewable energy zone in Khavda area of Gujarat under Phase -IV (7 GW): Part B Tentative Implementation timeframe: 24 months from SPV transfer and matching with Parts A, C & D of Khav da Ph-IV (7 GW) Scope: PFC Consulting Limited Sl. No. Scope of the transmission Scheme Capacity /km 1. Establishment of 2x1500 MVA, 765/400 kV & 2x500 MVA, 400/220 kV GIS S/s at a suitable location South of Olpad (between Olpad and Ichhapore) with 2x330 MVAR, 765 k V & 1x12 5 MVAR, 420 kV bus reactors Future Provisions : Space for • o 765/400 kV ICT along with bays- 4 Nos. o 765 kV line bays along with switchable line reactors – 8 Nos. o 765 kV Bus Reactor along with bay: 2 Nos. o 765 kV Sectionaliser bay: 1 - set o 400 kV lin e bays a long with switchable line reactor – 8 Nos. o 400/220 kV ICT along with bays - 8 Nos. o 420 kV Bus Reactor along with bay: 3 Nos. o 400 kV Sectionalization bay: 1 - set o 220 kV line bays: 18 Nos. o 220 kV Sectionalization bay: 1 set o 220 kV BC: 1 Nos. o Establishme nt of 2500 MW, ± 500 kV South Olpad (HVDC) [VSC] terminal s tation (2x1250 MW) 765/400 kV, 1x1500 MVA ICT -2 Nos. (7x500 MVA single phase units including one spare unit) 400/220 kV, 500 MVA ICT – 2 Nos. 765 kV ICT bays - 2 Nos. 400 kV ICT bays - 4 Nos. 220 kV ICT bays - 2 Nos. 220 kV BC bay – 1 No. 330 MVAR, 765 kV bus reactor -2 Nos. 125 MVAR, 420 kV bus reactor -1 No. 765 kV reactor bay - 2 Nos. 765 kV line bay - 4 Nos. 400 kV reactor bay - 1 No. 400 kV line bay - 4 Nos. 110 MVAR, 765 kV, 1 -ph reactor (spare un it for line/bus reactor) -1 No. 2. Vadodara (GIS) –South Ol pad (GIS) 765 kV D/C line Route length: 140 km 3. 240 MVAR switchable line reactors on each ckt at Vadodara (GIS) end of Vadodara (GIS) –South Olpad (GIS) 765 kV D/C line (with NGR bypass arrangeme nt) • 240 MVAR, 765 kV switchable line reactor - 2 Nos. • Switc hing equipment for 765 kV line reactor - 2 Nos. • 1x80 MVAR spare bus reactor available at Vadodara (GIS) to be used as spare 4. 2 Nos. of 765 kV line bays at Vadodara (GIS)for Vadodara(GIS) – South Olpad (GIS) 765 kV D/C line • 765 kV line bays (GIS) – 2 Nos. (at Vadodara end) 5. LILO of Gandhar – Hazira 400 kV D/c line at South Olpad (GIS) using twin HTLS conductor with minimu m cap acity of 1700 MVA per ckt at nominal voltage LILO route length ~ 10 km. 6. Ahmedabad – South Olp ad (GIS) 765 kV D/c line Route length: 250 km 7. 240 MVAR switchable line reactors on each ckt at Ahmedabad & South Olpad (GIS) end of Ahmedabad – South Olp ad (GIS) 765 kV D/c line (with NGR bypass arrangement) • 240 MVAR, 765 kV switchable line reactor - 4 Nos. [2 for Ahmedabad end and 2 for South Olpad (GIS) end] • Switching equipment for 765 kV line reactor - 4 Nos. [2 for Ahmedabad end and 2 for South Olpa d (GIS) end] • 1x80 MVAR, 765 kV 1- ph spare line reactor – 1 No. (for South Olpad end) • 1x80 MVAR, 765 kV 1- ph spare line reactor being implemented for Lakadia – Ahmedabad line (under Khavda Ph -II Part B scheme) at Ahmedabad S/s to be used as spare 8. 2 Nos. o f 765 kV line bays at Ahmedabad S/sfor Ahmedabad – South Olpad (GIS) 765 kV D/c line • 765 kV line bays (AIS) – 2 Nos. (at Ahmedabad end) Note: i. TSP of Vadodara S/s shall provide space for work envisaged at Sl. No. 3 & 4 given above ii. TSP of Ahmedabad S/s shall provide space for work envisaged at Sl. No. 7 & 8 given above iii. The line lengths mentioned ab ove are approximate as the exact length shall be obtained after the detailed survey. iv. The implementation timeline mentioned above is tentative. Final Time line would be indicated in the RfP Document. 3. Transmission System for Evacuation of Power from potential renewable energy zone in Khavda area of Gujarat under Phase -IV (7 GW): Part C Tentative Impleme ntation timeframe: 24 months from SPV transfer and matching with Parts A, B & D of Khavda Ph -IV (7 GW) Scope : REC Power Development and Consultancy Limited Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 4x1500 MVA, 765/400 kV & 2x500 MVA, 400/220 kV Boisar -II (GIS) S/s with 2x33 0 MVAR, 765 kV bus reactors and 2x125 MVAR, 420 kV bus reactors. (2x1500 MVA, 765/400 kV ICTs shal l be on each 400 kV section and 2x500 MVA, 400/220 kV ICTs shall be on 400 kV Bus Section -II. 2x125 MVAR Bus reactors shall be such that one bus reactor is placed on each 400 kV bus section. 400 kV Bus Sectionaliser to be kept under normally OPEN condition ) Future Provisions : Space for • o 765/400 kV ICT along with bays - 2 No. o 765 kV line bays along with switchable line reactors – 8 Nos. o 765 kV Bus Reactor along with bay: 2 No. o 765 kV Sectionaliser bay: 1 - set o 400 kV line bays along with switchable line reactor – 8 Nos. o 400/220 kV ICT along with bays - 6 Nos. o 420 kV Bus Reactor along with bay: 2 No. o 220 kV line bays: 12 Nos. o 220 kV Sectionalization bay: 1 set o 220 kV BC: 1 No. 765/400 kV, 1500 MVA ICT - 4 Nos. (13x500 MVA single phase units including one s pare unit) 400/220 kV, 500 MVA ICT – 2 Nos. 765 kV ICT bays - 4 Nos. 400 kV ICT bays - 6 Nos. (2 Nos. on Bus Section -I and 4 Nos. on Bus Section -II) 400 kV Bus Sectionaliser -1 set 220 kV ICT bays - 2 Nos. 220 kV BC bay – 1 No. 330 MVAR, 765 kV bus reactor -2 Nos. 125 MVAR, 420 kV bus reactor -2 Nos. 765 kV reactor bays - 2 Nos. 765 kV line bays - 6 Nos. 400 kV reactor bays - 2 Nos. (one on each bus section) 400 kV line bay - 6 Nos. (4 Nos. on bus Section -I and 2 Nos. on bus Section -II) 110 MVAR, 765 kV, 1 -ph reac tor (spare unit for line/bus reactor) -1 No. 2. South Olpad (GIS) – Boisar -II (GIS) 765 kV D/c line Route length: 225 km 3. 2 Nos. of 765 kV line bay s at South Olpad (GIS) for termination of South Olpad (GIS) – Boisar -II (GIS) 765 kV D/c line 765 kV li ne bays (GIS) – 2 Nos. (for South Olpad end) 4. 240 MVAR switchable line reactors on each ckt at South Olpad (GIS) & Boisar -II (GIS) end of South Ol pad (GIS) – Boisar - II (GIS) 765 kV D/c line (with NGR bypass arrangement) • 240 MVAR, 765 kV switchable li ne reactor - 4 [2 for Boisar -II (GIS) and 2 for South Olpad (GIS)] • Switching equipment for 765 kV line reactor - 4 (2 for Boisar -II (GIS) and 2 for South Olpad (GIS)) • 1x80 MVAR, 765 kV 1- ph spare line reactor – 1 No. (for Boisar -II end) • 1x80 MVAR, 765 kV 1 - ph spare line reactor proposed for Ahmedabad – South Olpad (GIS) 765 kV line (under Khavda Ph-IV Part B scheme) at South Olpad (GIS) S/s to be used as spare 5. LILO of Navsari (New) – Padghe (PG) 765 kV D/c line at Boisar -II LILO route length: 25 km. 6. Boisar -II (Sec -II) – Velgaon (MH) 400 kV D/c (Quad ACSR/AAAC/AL59 moose equivalent) line Route length: 10 km. 7. 2 Nos. of 400 kV line bays at Velg aon (MH) for termination of Boisar -II – Velgaon (MH) 400 kV D/c (Quad ACSR/AAAC/AL59 moose equivalent) line 400 kV line bays (GIS) – 2 Nos. [for Velgaon (MH) end] 8. LILO of Babhaleswar – Padghe (M) 400 kV D/c line at Boisar -II (Sec -I) using twin HTLS c onduc tor with a minimum capacity of 1700 MVA per ckt at nominal voltage LILO route length: 65 km. 9. 80 MVAR switchable line reactors at Bosar -II end of Boisar -II – Babhaleswar 400 kV D/c line (with NGR bypass arrangement) formed after above LILO • 80 M VAR, 420 kV switchable line reactor including switching equipment - 2 Nos. 10. ±200 MVAR STATCOM with 2 x125 MVAR MSC, 1x125 MVAR MSR at 400 kV bus section -I of Boisar -II and ±200 MVAR STATCOM with 2x125 MVAR MSC, 1x125 MVAR MSR at 400 kV bus section -II of Boisar-II • ±200 MVAR STATCOM (with MSC/MSR) on 400 kV Section -I • 400 kV bay – 1 No. on Section -I • ±200 MV AR STATCOM (with MSC/MSR) on 400 kV section -II • 400 kV bay – 1 No. on Section -II 11. ± 300 MVAR STATCOM with 3x125 MVAR MSC, 1x125 MVAR MSR at 400 kV le vel of Navsari (New)(PG) S/s with 1 No. of 400 kV bay (GIS) • ±300 MVAR STATCOM (with MSC/MSR) • 400 kV bay – 1 No. Note: I. Bay(s) required for completion of diameter (GIS) in one -and-half breaker scheme shall also be executed by the TSP. II. MSETCL shall carry out reconductoring of the balance portion of Padghe (M) – Boisar -II 400 kV D/c line (i.e. from LILO po int upto Padghe (M)) and shall also carry out corresponding upgradation of 400 kV bays at Padghe (M) as may be required in matching time -frame of the LILO line. MSETCL has confirmed the maximum capacity of the line which can be achieved after reconductoring considering clearances in existing towers of Babhaleswar – Padghe (M) 400 kV D/c line as 1700 MVA per ckt. III. MSETCL shall implement the LILO of both circu its of Boisar -II – Velgaon 220 kV D/c line at Boisar -II (ISTS) S/s along with 4 Nos. 220 kV GIS bays at Boisar -II in matching time -frame of Boisar -II (ISTS) S/s. IV. TSP of South Olpad (GIS) S/s shall provide space for work envisaged at Sl. No. 3 & 4. V. MSETCL s hall provide space for the work envisaged at Sl. No. 7 at Velgaon S/s. VI. TSP of the subject scheme shall implement Inter -tripping scheme on South Olpad (GIS) – Boisar -II (GIS) 765 kV D/c line (for tripping of the switchable line reactor at either end along w ith the main line breaker). VII. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. VIII. The implementation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Document. 4. Transmission System for Evacuation of Power from po tential renewable energy zone in Khavda area of Gujarat under Phase -IV (7 GW): Part D Tentative Implementation timeframe : 24 months from SPV Transfer Scope : Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 2x1500 MVA, 765/400 kV & 3x500 MVA, 400/220 kV Pune -III (GIS) S/s with 2x330 MVAR, 765 kV bus reactor and 2x125 MVAR, 420 kV bus reactor. Future Provisions : Space for • o 765/400 k V ICT along with bays - 4 No. o 765 kV line bays along with switchable line reactors – 8 Nos. o 765 kV Bus Reactor along with bay: 2 No. o 765 kV Sectionaliser bay: 1 -set o 400 kV line bays along with switchable line reactor – 12 Nos. o 400/220 kV ICT along with bays -5 Nos. o 400 kV Bus Reactor along with bay: 2 No. o 400 kV Sectionalization 765/400 kV, 1500 M VA ICT -2 Nos. (7x500 MVA including one spare unit) 400/220 kV, 500 MVA ICT – 3 Nos. 765 kV ICT bays - 2 Nos. 400 kV ICT bays - 5 Nos. 220 kV ICT bays - 3 No s. 220 kV BC bay – 1 No. 330 MVAR, 765 kV bus reactor -2 Nos. 125 MVAR, 420 kV bus reactor -2 Nos. 765 kV reactor bay - 2 Nos. 765 kV line bay - 6 Nos. 400 kV reactor bay - 2 Nos. 400 kV line bay - 2 Nos. 110 MVAR, 765 kV, 1 -ph reactor (spare unit for line/bus r eactor )-1 No. PFC Consulting Limited bay: 1 set o 220 kV line bays: 12 Nos. o 220 kV Sectionalization bay: 1 set o 220 kV BC: 1 No. o STATCOM (±300 MVAR) along with MSC (3x125 MVAR) & MSR (1x125 MVAR): alongwith 1 No. 400 k V bay: 1 No. o 80 MVAR, 765 kV, 1 -ph reactor (spare unit for line reactor) -1 No. 2. Boisar -II – Pune -III 765 kV D/c line Route length: 200 km 3. 330 MVAR switchable l ine reactors at Pune -III end of Boisar -II – Pune -III 765 kV D/c line (with NGR bypass arrangement). • 330 MVAR, 765 kV switchable line reactor - 2 Nos. • Switchin g equipment for 765 kV line reactor - 2 Nos. • 1x110 MVAR spare bus reactor available at Pune - III (G IS) to be used as spare 4. 2 Nos. of 765 kV line bays at Boisar -II for termination of Boisar -II – Pune -III 765 kV D/c line • 765 kV line bays (GIS) – 2 No s. (for Boisar -II end) 5. LILO of Narendra (New) – Pune (GIS) 765 kV D/c line at Pune -III LILO route length: 10 km. 6. 330 MVAR switchable line reactors at Pune -III end of Narendra (New) – Pune - III(GIS) 765 kV D/c line (with NGR bypass arrangement). • 330 MVA R, 765 kV switchable line reactor - 2. • Switching equipment for 765 kV line reactor - 2 • 1x110 MVAR s pare bus reactor (1 -ph) available at Pune -III (GIS) to be used as spare 7. LILO of Hinjewadi -Koyna 400 kV S/c line at Pune -III (GIS) S/s LILO route len gth: 40 km. 8. 80 MVAR, 420 kV switchable Line Reactors at Pune -III (GIS) end of Pune -III (GIS) – Koyn a 400 kV S/c line formed after above LILO (with NGR bypass arrangement). • 80 MVAR, 420 kV switchable line reactor along with switching equipment - 1 No. Note: i. Bay(s) required for completion of diameter (GIS) in one -and-half breaker scheme, shall also be executed by the TSP. ii. Logic for Inter -tripping scheme for tripping of the 330 MVAR switchable line reactor along with main line breaker at Pune (GIS) en d of Pu ne (GIS) – Narendra (New) 765 kV D/c line shall be implemented by the owner of the line after LI LO of Narendra (New) – Pune (GIS) 765 kV D/c line at Pune -III iii. MSETCL shall implement the following 220 kV lines along with 5 Nos. 220 kV GIS bays at Pu ne-III (GIS) S/s in matching time -frame of Pune -III S/s: a. LILO of both circuits of Jejuri -Phursungi 220 kV D/c line at Pune -III S/s with HTLS conductor (twin zebra equivalent) along with reconductoring of balance line section viz. LILO point to Phursungi and LILO points to Jejuri with HTLS conductor (twin zebra equivalent) b. Nanded City - Pune PG III 220 kV S /c line with HTLS conductor (twin zebra equivalent) iv. TSP of Boisar -II S/s shall provide space for work envisaged at Sl. No. 4. v. The line lengths mentioned above a re approximate as the exact length shall be obtained after the detailed survey. vi. The implementati on timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Document. 5. Transmission System for Ev acuatio n of Power from potential renewable energy zone in Khavda area of Gujarat under Phase -IV (7 GW): Part E2 Tentative Implementation timeframe : 21 months from SPV Transfer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Augmentation of transf ormation capacity at KPS2 (GIS) by 2x1500 MVA, 765/400 kV ICT on Bus section -I (5th& 6th) & 2x15 00 MVA, 765/400 kV ICT on Bus section -II (7th & 8th) & 2 Nos. 400 kV bays at Bus Section -I for RE interconnection and 3 Nos. 400 kV bays at Bus Section -II for RE interconnection 1500 MVA, 765/400 kV ICT – 4 Nos. 765 kV bays – 4 Nos. [2 Nos. complete Dia for 2 ICTs (one on each bus section) and balance 2 ICTs to be terminated in spare bays (one on each section)] 400 kV bays – 10 Nos. [4 Nos. ICT bays (2 o n each section) & 5 Nos. line bays (2 on bus section -I & 3 on bus section -II) along with 1 No. bay on B us Section -II for Dia completion] Note: i. The TSP shall implement two complete diameters (1 on Bus Section -I & 1 on bus section -II) at 765 kV level of KP S2 (GIS ) consisting of 2 Main Bays & 1 Tie Bay required for completion of diameter (GIS) in one -and-half breaker scheme. ii. The TSP shall implement five complete diameters (2 on Bus Section -I & 3 on Bus Section -II) at 400 kV level of KPS2 (GIS) consisting of 2 Main Bays & 1 Tie bay required for completion of diameter (GIS) in one -and-half breaker scheme. iii. Further, TSP of KPS2 shall provide space to carry out the above augmentation work. iv. 2 Nos. 400 kV bays at Bus Section -I for RE interconnection and 1 No. 400 kV bays at Bus Section -II for RE interconnection are already under implementation at KPS2. v. The implemen tation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Documentt. REC Power Development and Consultancy Limited 6. Tran smission System for Evacuation of Power from potential renewable energy zone in Khavda area of G ujarat under Phase -V (8 GW): Part A Tentative Implementation timeframe : 48 months for Bipole -1 and 54 months for Bipole -2 from SPV Transfer Scope: Sl. No. Scope of the Transmission Scheme Capacity 1. Establishment of 6000 MW, ± 800 kV KPS2 (HVDC) [LC C] terminal station (4x1500 MW) along with associated interconnections with 400 kV HVAC Switchyard*. 6000 MW, ± 800 kV KPS2 (HVDC) [LCC] Terminal station 2. Establishment of 6000 MW, ± 800 kV Nagpur (HVDC) [LCC] terminal station (4x1500 MW) along with associated interconnections with 400 kV HVAC Switchyard* 6000 MW, ± 800 kV Nagpur (HVDC) [LCC] terminal station 3. ±800 kV HVDC Bipole line (Hexa lapwing) b etween KPS2 (HVDC) and Nagpur (HVDC) (1200 km) (with Dedicated Metallic Return) (capable to evacuate 6000 MW with overload as specified) Route length: 1200 km. 4. Establishment of 6x1500 MVA, 765/400 kV ICTs at NagpurS/s along with 2x330 MVAR (765 kV) & 2x125 MVAR, 420 kV bus reactors along with associated interconnections with HVDC Switchyard*. Th e 400 kV bus shall be established in 2 sections through 1 set of 400 kV bus sectionaliser so that 3x1500 MVA ICTs are placed in each section. The bus sec tionali ser shall be normally closed and may be opened based on Grid requirement. Future Provisions at Nagpur: Space for: o o 765/400 kV, 1500 MVA ICT - 4 (1 on 400 kV bus section -II & 3 on future 400 kV bus section -III) o 765 kV line bays along with switchab le line reactors – 10 Nos. o 765 kV Bus Reactor along with bay: 2 No. o 765 kV Sectionaliser bay: 1 -set o 400 kV line bays along with switchable line o o 765/400 kV, 1500 MVA ICT -6 (3 on each 4 00 kV section) (19 single phase units including one spare unit) o 765 kV ICT bays - 6 Nos. o 400 kV ICT bays - 6 Nos. (3 on each section) o 330 MVAR 765 kV bus reactor -2 Nos. o 125 MVAR 420 kV bus reactor -2 Nos. (one on each section) o 765 kV reactor bay - 2 Nos. o 765 kV line bay - 4 Nos. o 400 kV reactor bay - 2 Nos. (one on each section) o 400 kV Bus sectionaliser - 1 Set o 110 MVAR, 765 kV, 1-ph reactor (spare unit for l ine/bus REC Power Development and Consultancy Limited reactor – 12 Nos. o 400 kV Bus sectionaliser - 1 Set o 400/220 kV ICT along with bays -9 Nos. (3 Nos. on 400 kV bus sections II & 6 Nos. on future bus section -III) o 400 kV Bus Reactor along with bay: 4 No. (1 each on 400 kV bus sections I & II and 2 on future 400 kV bus section -III) o 220 kV line bays: 16 Nos. o 220 kV Sectionalization bay: 2 set o 220 kV BC & TBC: 3 Nos. o 80 MVA R, 765 kV, 1 - ph reactor (spare unit for line reactor) -1 reactor) - 1 No. 5. LILO of Wardha – Raipur 765 kV one D/c line (out of 2xD/c lines) at Nagp ur LILO route length: 30 km. 6. Installation of 240 MVAR switchable line reactor at Nagpur end on each ckt of Nagpur – Raipur 765 kV D/c line • 240 MVAR, 765 kV switchable line reactors - 2 Nos. (at Nagpur end) • Switching equipment for 765 kV line reactor - 2 Nos. (at Nagpur end) • 80 MVAR, 765 kV, 1 -ph reactor (spare unit for line reactor) -1 No. * The 400 kV interconnections (along with all associated equipm ent/ bu s extension, etc.) between HVDC & HVAC switchyards shall be implemented by the TSP Note: i. The 2x 1500 MW poles shall emanate from 400 kV bus section 1 of KPS2 and terminate at bus section 1 of Nagpur. Similarly, the other 2x1500 MW poles shall emanat e from 400 kV bus section 2 of KPS2 and terminate at bus section 2 of Nagpur. ii. HVDC System will be desig ned considering 100% power reversal capability. The rated power transmission capacity as well as the rated transmission voltage shall be defined and guar anteed at the rectifier end of the AC yard. iii. TSP of KPS2 shall provide space for the establishment of th e HVDC system as per above scope. iv. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. v. The i mplemen tation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Docum ent. 7. Transmission System for Evacuation of Power from potential renewable energy zone in Khavda area of Guj arat under Phase -V (8 GW): Part C Tentative Implementation timeframe : 48 months from SPV Trans fer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 2500 MW, ± 500 kV KPS3 (HVDC) [VSC] terminal station (2x1250 MW) at a suitab le location near KPS3 substation with associated interconnections with 400 kV HVAC Switchyard* 2500 MW, ± 500 kV KPS3 (HVDC) [VSC] Terminal station 2. Establishment of 2500 MW, ± 500 kV South Olpad (HVDC) [VSC] terminal station (2x1250 MW) along with associated interconnections with 400 kV HVAC Switchyard of South Olpad S/s* 2500 MW, ± 500 kV Sou th Olpad (HVDC) [VSC] terminal station 3. Establishment of KPS3 (HVDC) S/s along with 2x125 MVAR, 420 kV bus reactors along with associated interconne ctions with HVDC Switchyard*. The 400 kV bus shall be established in 2 sections through 1 set of 400 kV bus sectionaliser to be kept normally OPEN. 400/33 kV, 2x50 MVA transformers for exclusively supplying auxiliary power to HVDC terminal. MVAR Future Provis ions at KPS3 (HVDC) S/s Space for: o o 400 kV line bays – 6 Nos. (3 on each section) o 400 kV reacto r bay - 2 Nos. (one on each section) o o 400/33 kV, 1x50 MVA ICT along with bays - 2 Nos. o 125 MVAR 420 kV bus reactor -2 Nos. (one on each section) o 400 kV rea ctor ba y- 2 Nos. (one on each section) o 400 kV Bus sectionaliser - 1 Set 4. KPS3 – KPS3 (HVDC) 400 kV 2xD/c (Quad ACSR/AAAC/AL59 moose equivalent) line along with the line bays at both substations Route length - 2 km 400 kV GIS line bays - 4 Nos. at KPS3 (2 Nos. on each bus section) 400 kV GIS line bays - 4 Nos at KPS3 (HVDC) (2 Nos. on each bus section) 5. ±500 kV HVDC Bipole line between KPS3 (HVDC) and South Olpad (HVDC) (with Dedicated Metallic Return) (capable to evacuate 2500 MW) Route length: 600 k m PFC Consulting Limited *The 400 kV interconnections (along with all associated equipment/ bus extension, etc.) between HVD C & HVAC switchyards shall be implemented by the TSP Note: i. The 1250 MW pole -1 shall emanate from 400 kV bus section 1 of KPS3 (HVDC) and terminate at S outh Ol pad S/s. Similarly, the 1250 MW pole -2 shall emanate from 400 kV bus section 2 of KPS3 (HVDC) an d terminate at South Olpad S/s. ii. HVDC System will be designed with 100% power reversal capability as well as black start, automatic grid restoration & dyn amic re active power support capability. iii. The rated power transmission capacity as well as the rated tra nsmission voltage shall be defined and guaranteed at the rectifier end of the AC yard. iv. TSP of KPS3 shall provide space for scope at Sl. No. 4 as per the above s cope v. TSP of South Olpad S/s shall provide space for scope at Sl. No. 2 as per above scope vi. The li ne lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. vii. The implementation timeline mentioned above i s tenta tive. Final Timeline would be indicated in the RfP Document 8. Transm ission System for Evacuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part A Tentative Implementation timeframe : 24 mont hs from SPV Transfer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 4x1500 MVA, 765/400 kV & 5x500 MVA, 400/220 kV Fatehgarh - IV (Section -2) Pooling Station along with 2x240 MVAR (765 kV) Bus Reactor & 2x125 MVAR (420 k V) Bus Reactor [Future space provisions already approved at Fatehgarh -IV in 8th NCT meeting dated 25.03.22 would be utilized for the present scheme] • 765/400 kV, 1500 MVA ICT- 4 Nos. (13x500 MVA including one spare unit) • 765 kV ICT bays - 4 Nos. • 240 MVAR , 765 k V Bus Reactor - 2 Nos. (7x80 MVAR including one spare unit) • 765 kV Bus reactor bays -2 Nos. • 765 kV line bays - 4 Nos. [for LILO of Fatehgarh -III - Beawer 765 kV D/c (2nd) line at Fatehgarh -IV (Section -2) PS] • 400/220 kV, 500 MVA ICT -5 Nos. • 400 kV I CT bays - 9 Nos. • 400 kV line bays - 2 Nos. [For Fatehgarh -IV (Sec -2) - Bhinmal (PG) D/c line] • 125 MVAR, 420 kV Bus REC Power Development and Consultancy Limited Reactor -2 Nos. • 400 kV Bus reactor bays - 2 Nos. • 400 kV Sectionalisation bay: 1 set • 220 kV ICT bays - 5 Nos. • 220 kV line bays: 6 Nos. (for RE co nnectiv ity) • 220 kV BC (2 Nos.) and 220 kV TBC (2 Nos.) • 220 kV Sectionalisation bay: 1 set 2. Fatehga rh-IV (Section -2) PS – Bhinmal (PG) 400 kV D/c line (Twin HTLS*) along with 50 MVAR switchable line reactor on each ckt at each end Route Length: 2 00 km • 50 MVAR, 420 kV switchable line reactors at Fatehgarh -IV (Section -2) PS – 2 Nos. • 50 MVAR, 420 kV , switchable line reactors at Bhinmal (PG) – 2 Nos. • Switching equipment for 420 kV, 50 MVAR switchable line reactors at Fatehgarh -IV (Section -2) PS – 2 Nos. • Switching equipment for 420 kV, 50 MVAR switchable line reactors at Bhinmal (PG) – 2 Nos. 3. LILO of both ckts of 765 kV Fatehgarh - III- Beawar D/c line at Fatehgarh -IV (Section -2) PS along with 330 MVAR switchable line reactor at Fatehgarh -IV PS end of each ckt of 765 kV Fatehgarh -IV- Beawar D/c line (formed after LILO) LILO length: 15 km • 330 MVA R, 765 kV switchable line reactors at Fatehgarh -IV (Section -2) PS – 2 Nos. • Switching equipment for 330 MVAR, 765 kV switchable line reactors at Fatehgarh -IV (Se ction -2) PS – 2 Nos. • 110 MVAR (765 kV) spare reactor single phase unit at Fatehgarh -IV (Sectio n-2) PS end – 1 No. 4. 2 Nos. of 400 kV line bays at Bhinmal (PG) 400 kV line bays - 2 Nos. *with minimum capacity of 2100 MVA on each circuit at n ominal voltage. Note: i. Transmission system for evacuation of about 2 GW RE power from REZ in Rajasthan (20 GW) under Phase -III Part A1 at Fatehgarh -IV (Section -1) is under bidding. ii. Transmission system under Phase -IV (Part 2) is for evacuating 4 -5 GW RE potentia l at Fatehgarh -IV (Section 2), which is utilising the future provision (approved in 8th NCT meet ing dated 25.03.22) at Fatehgarh -IV approved under Phase -III scheme. iii. The line lengths mentioned above are approximate as the exact length shall be obtain ed afte r the detailed survey iv. POWERGRID to provide space for 2 Nos. of 400 kV line bays at Bhinmal (PG) along with the space for switchable line reactors without any cost implications. v. Implementation of A, B, C, D, E, F, H1, H2 packages shall be aligned vi. Switchabl e line reactors to be implemented with NGR bypass arrangement. vii. The implementation timeline menti oned above is tentative. Final Timeline would be indicated in the RfP Document. 9. Transmission System for Eva cuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part B Tentative Implementation timeframe : 24 months from SPV Transfer Scope: Sl. No. Scope of the Transmission Scheme Capacity 1. Establishment of 2x1500 M VA, 765 /400 kV Substation at suitable location near Sirohi along with 2x240 MVAR (765 kV) & 2x125 MVAR (420 kV) Bus Reactor Future provisions: Space for • 765/400 kV ICT along with bays - 4 Nos. • 765 kV line bays along with switchable line reactors – 10 No s. • 765 kV Bus Reactor along with bay: 1 Nos. • 400 kV line bays along with switchable line reactor –4 Nos. • 400 kV line bays –4 Nos. • 400 kV Bus Reactor along with bay: 1 No. • 400 kV Sectionalization bay: 2 sets • 400/220 kV ICT along with bay - 6 Nos. • 220 kV line bays -10 Nos. • 220 kV Sectionalization bay: 2 sets • 220 kV BC (3 Nos.) & TBC (3 Nos.) • STATCO M (2x±300 MVAR) along with MSC (4x125 MVAR) & MSR (2x125 MVAR) along with two number 400 kV bays. • 765/400 kV, 1500 MVA ICT- 2 Nos. (7x500 MVA including o ne spare unit) • 765 kV ICT bays -2 Nos. • 240 MVAR, 765 kV Bus Reactor -2 Nos. (7x80 MVAR including one spare unit) • 765 kV Bus reactor bays-2 Nos. • 765 kV line bays - 2 Nos. [for D/c line to Fatehgarh -IV (Section -2) PS] • 400 kV ICT bays - 2 Nos. • 400 kV line bays - 2 Nos. [ for D/c line to Chittorgarh (PG) S/s] • 125 MVAR, 420 kV Bus Reactor -2 Nos. • 400 kV Bus reactor bays- 2 Nos. PFC Consul ting Limi ted 2. Fatehgarh -IV (Section -2) PS – Sirohi PS 765 kV D/c line along with 240 MVAR switchable line reactor for each circuit at each end Route Lengt h – 240 km • 765 kV, 240 MVAR switchable line reactors at Fatehgarh -IV (Section -2) PS – 2 Nos. • 765 kV, 240 MVAR switchable line reactors at Sirohi PS – 2 Nos. • Switching equipment for 765 kV, 240 MVAR switchable line reactors at Fatehgarh -IV (Se ction-2) PS – 2 Nos. • Switching equipment for 765 kV, 240 MVAR switchable line reactors at Sirohi PS – 2 Nos. 3. Sirohi PS -Chittorgarh (PG) 400 kV D/c line (Quad) along with 80 MVAR switchable line reactor for each circuit at Sirohi PS end Route Length ~ 160 km • 420 kV, 80 MVAR switchable line reactors at Sirohi PS – 2 Nos. • Switching equipment for 420 kV, 80 MVAR switchable line reactors at Sirohi PS – 2 Nos. 4. 2 No. of 400 kV line bays at Chittorgarh (PG) S/s 400 kV line bays at Chittorgarh (PG) S/s - 2 Nos. 5. 2 No. of 765 kV line bays at Fatehgarh -IV (Section -2) PS 765 kV line bays at Fatehgarh - IV (Section -2) PS – 2 Nos. Note: i. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. ii. POWE RGR ID to provide space for 2 Nos. of 400 kV line bays at Chittorgarh (PG). iii. Developer of Fatehgarh -IV S/ s (Section -2) to provide space for 2 Nos. of 765 kV line bays at Fatehgarh -IV(Section -2) PS along with the space for switchable line reactor iv. Implementati on of A, B, C, D, E, F, H1, H2 packages shall be aligned v. Switchable line reactors to be implemented wi th NGR bypass arrangement. vi. The implementation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Document. 10. Transmission System for Evacuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW ) (Jaisalmer/Barmer Complex): Part C Tentative Implementation timeframe : 24 months from SPV Transfer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 3x1500 MVA, 765/400 kV & 5x500 MVA, 400/220 kV Mandsaur Pooling Station a long with 2x330 MVAR (765 kV) Bus Reactors & 2x125 MVAR, 765/400 kV, 15 00 MV A ICT – 3 Nos. (10x500 MVA single phase units including one spare REC Power Development and Consultancy Limited 420 kV Bus Reactor Future Provisions : Space for: • 765/400 kV ICT along with bays - 3 No. • 765 kV line bays along with switchable line reactors – 12 Nos. • 765 kV Bus Reactor along with bay: 2 No. • 765 k V Sectionaliser bay: 1 -set • 400 kV line bays along with switchable line reactor – 12 Nos. • 400/220 kV ICT along with bays - 5 Nos. • 400 kV Bus Reactor alo ng with bay: 2 No. • 400 kV Sectionalization bay: 1 - set • 220 kV line bays: 11 Nos. • 220 kV Sectionalizat ion bay: 1 set • 220 kV BC and TBC: 1 Nos. • STATCOM (± 300 MVAR) along with MSC (2x125 MVAR) & MSR (1x125 MVAR) along with one 400 kV bay. unit) 400/220 kV, 500 MVA ICT – 5 Nos. (3 Nos. on 220 kV bus section -1 & 2 Nos. on 220 kV bus section -2) 765 kV ICT bays – 3 Nos. 400 kV ICT bays – 8 Nos. 330 MVAR 765 kV bus reactor - 2 No s. (7x 110 MVAR single phase units including one spare unit) 765 kV bus reactor bay - 2 Nos. 765 kV line bay - 2 Nos. (for Indore line) 80 MVAR, 765 kV, 1 -ph reactor (spare unit) -1 No. 125 MVAR, 420 kV bus reactor - 2 Nos. 400 kV reactor bay - 2 Nos. 220 kV ICT b ays – 5 Nos. 220 kV line bays – 7 Nos. (4 Nos. on bus section -1 and 3 Nos. on bus section -2) 220 kV Bus Sectionaliser – 1 set 220 kV TBC bay – 2 Nos. 220 kV BC bay – 2 Nos. 2. Mandsaur PS – Indore(PG) 765 kV D/c Line Route Length ~ 200 km 3. 1x330 MV AR switchable line reactor (SLR) on each ckt at Mandsaur end of Mandsaur PS – Indore (PG) 765 kV D/c Line • 330 MVAR, 765 kV switchable line reactor - 2 Nos. • Switching equipment for 765 kV line reactor - 2 Nos. 4. 2 Nos. of 765 kV line bays a t Indore (PG) fo r termination of Mandsaur PS – Indore (PG) 765 kV D/c Line • 765 kV line bays – 2 Nos. (for Indore (PG) end) Note: i. The line lengths mentioned above are approximate as the exact length shall be obtained after detailed survey ii. POWERGRID to pr ovide spa ce for 2 Nos. of 765 kV line bays at Indore S/s iii. Implementation of A, B, C, D, E, F, H1, H2 pac kages shall be aligned iv. Switchable line reactors to be implemented with NGR bypass arrangement v. The implementation timeline mentioned above is tentative. Final Tim eline would be indicated in the RfP Document. 11. Transmission System for Evacuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part D PFC Consulting Limited Tentative Implementation timefram e : 24 months from SPV Transfer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Beawar - Mandsaur PS 765 kV D/c line along with 240 MVAR switchable line reactor for each circuit at each end Route Length – 260 km • 765 kV, 240 MVAR switchable l ine re actors at Beawar – 2 Nos. • 765 kV, 240 MVAR switchable line reactors at Mandsaur PS – 2 Nos. • Switching equipment for 765 kV, 240 MVAR switchable line reactors at Beawar – 2 Nos. • Switching equipment for 765 kV, 240 MVAR switchable line rea ctors at Mandsa ur PS – 2 Nos. 2. 2 No. of 765 kV line bays each at Beawar S/s & Mandsaur S/s 765 kV l ine bays - 4 Nos. (2 Nos. each at Beawer S/s and Mandsaur PS) Note: i. The line lengths mentioned above are approximate as the exact length shall be obtained after the d etailed survey ii. Developer of Mandsaur PS to provide space for 2 Nos. of 765 kV line bays at Mandsaur S/s along with the space for switchable line reactor. iii. Developer of Beawar S/s to provide space for 2 Nos. of 765 kV line bays at Beawar S/s along with the space for switchable line reactor. iv. Implementation of A, B, C, D, E, F, H1, H2 packages s hall be aligned v. Switchable line reactors to be implemented with NGR bypass arrangement vi. The implementation timeline mentioned above is tentative. Final T imeline would be indicated in the RfP Document. 12. Transmission System for Evacuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part E Tentative Implementation timeframe : 24 months from SP V Transfer Scope : Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 765 kV Subst ation at suitable location near Rishabdeo (Distt. Udaipur) along with 2x240 MVAR (765 kV) Bus Reactor Future Provisions: Space for • o 765/400 kV ICT alon g with bays- 5 No . along with • 240 MVAR, 765 kV Bus Reactor - 2 Nos. (7x80 MVAR including one sp are unit) • 765 kV Bus reactor bays-2 Nos. • 765 kV line bays - 6 Nos. [for 765 kV Sirohi PS- Rishabdeo – Mandsaur D/c line and REC Power Development and Consultancy Limi ted spare unit o 765 kV line bays along with switchable line reactors – 6 Nos. o 765 kV Bus Reactor along with bay: 1 No. o 400 kV line bays along with switchable line reactor – 4 Nos. o 400 kV line bays – 4 Nos. o 400 kV Bus Reactor along with bay: 3 Nos. o 400 kV Sectionalization bay: 2 sets o 400/220 kV ICT along with bay - 6 Nos. o 220 kV lin e bays -10 Nos. o 220 kV Sectionalization bay: 2 sets o 220 kV BC (3 Nos.) & TBC (3 Nos.) o STATCOM (2 x ±300MVAR) along with MSC (4x125 MVAR) & MSR (2x125 MV AR) along with tw o number 400 kV bays. LILO of one circuit of 765 kV Chittorg arh- Banaskanta D/c line at Rishabdeo S/s] 2. Sirohi PS - Rishabdeo 765 kV D/c line along with 330 MVAR switchable line reactor for each circuit at Sirohi end Route Length – 170 km • 765 kV, 330 MVAR switchable line reactors at Sirohi PS – 2 Nos . • Switchi ng equ ipment for 765 kV, 330 MVAR switchable line reactors at Sirohi PS – 2 Nos. • 110 MVAR (76 5 kV) spare reactor single phase unit at Sirohi PS – 1 No. 3. Rishabdeo - Mandsaur PS 765 kV D/c line along with 240 MVAR switchable line reactor for ea ch circuit at Ris habdeo end Route Length – 160 km • 765 kV, 240 MVAR switchable line reactors at Rish abdeo – 2 Nos. • Switching equipment for 765 kV, 240 MVAR switchable line reactors at Rishabdeo – 2 Nos. 4. LILO of one circuit of 765 kV Chittorgarh - Banaskanta D/c line at Rishabdeo S/s (20 km) LILO route length~ 20 km 5. 2 No. of 765 kV line bays e ach at Sirohi PS & Mandsaur S/s • 765 kV line bays – 4 Nos. (2 Nos. each at Sirohi PS & Mandsaur PS) Note: i. The line lengths mentioned above are approxim ate as the exact length shall be obtained after the detailed survey ii. Developer of Sirohi PS to provide s pace for 2 Nos. of 765 kV line bays at Sirohi PS along with the space for switchable line reactors, including spare unit. iii. Developer of Mandsaur PS to pro vide space for 2 Nos. of 765 kV line bays at Mandsaur PS. iv. Implementation of A, B, C, D, E, F, H1, H2 pa ckages shall be aligned v. Switchable line reactors to be implemented with NGR bypass arrangement. vi. The implementation timeline mentioned above is tentative . Final Tim eline would be indicated in the RfP Document. 13. Transmission System for Evacuation of Power from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part F (By clubbing Part F1 & F2) Tentat ive Im plementation timeframe : 24 months from SPV Transfer Scope: Sl. No. Scope of the Tra nsmission Scheme Capacity 1. Establishment of 3x1500 MVA, 765/400 kV & 2x500 MVA, 400/220 kV Barmer -I Pooling Station along with 2x240 MVAR (765 kV) Bus Reactor & 2x12 5 MVAR (420 kV) Bus Reactor Future provisions: Space for • o 765/400 kV ICT along with bays- 3 No. o 765 kV line bays along with switchable line reactors – 4 Nos. o 765 kV Bus Reactor along with bay: 1 No. o 400 kV line bays –4 o 400 kV line bays along with switcha ble line reactor –4 Nos. o 400/220 kV ICT along with bays -8 Nos. o 400 kV Bus Reactor al ong with bay: 1 No. o 400 kV Sectionalization bays: 2 sets o 220 kV line bays for connectivity of RE Applications -10 Nos. o 220 kV Sectionalization bay: 3 set s o 220 kV BC (3 Nos .) & TBC (3 Nos.) o STATCOM (2x±300 MVAR) along with MSC (4x125 MVAR) & MSR (2x125 MVAR ) along with two number 400 kV bays • 765/400 kV, 1500 MVA ICT- 3 Nos. (10x500 MVA including one spare unit) • 765 kV ICT bays-3 Nos. • 240 MVAR, 765 kV Bus Reactor -2 Nos. (7x80 MVAR, including one spare unit) • 765 kV Bus reactor bays -2 Nos. • 765 kV line bays- 2 Nos. (for D/c line to Sirohi PS) • 400/220 kV, 500 MVA ICT -2 Nos. • 400 kV ICT bays- 5 Nos. • 125 MVAR, 420 kV Bus Reactor -2 Nos. • 400 kV Bus reactor bays - 2 Nos. PFC Consulting Limited • 400 kV line bays - 2 Nos. [for D/c line to Fatehgarh - III(Section -2) PS] • 220 kV ICT bays- 2 Nos. • 220 kV line bays: 4 Nos. (for RE connectivity) • 220 kV BC (1 No.) & TBC (1 No.) 2. Fatehgarh -III (Section -2) PS – Barmer -I PS 400 kV D/c line (Quad) Route Length ~ 50 km 3. Barmer -I PS– Sirohi PS 765 kV D/c line along with 240 MVAR switchable line reac tor for each circuit at each end Route Length ~ 200 km • 765 kV, 240 MVAR switchable line reactors at Barmer -I PS – 2 Nos. • 765 kV, 240 MVAR switchabl e line react ors at Sirohi PS – 2 Nos. • Switching equipment for 765 kV 240 MVAR switchable line react ors at Barmer -I PS – 2 Nos. • Switching equipment for 765 kV 240 MVAR switchable line reactors at Sirohi PS – 2 Nos. 4. 2 No. of 400 kV line bays at Fate hgarh -III (S ection -2) PS 400 kV line bays at Fatehgarh -III (Section - 2) PS - 2 Nos. 5. 2 No. of 765 kV line bays at Sirohi PS 765 kV line bays at Sirohi PS – 2 Nos. Note: i. The line lengths mentioned above are approximate as the exact length shall be obtained after the d etailed survey ii. Developer of Sirohi PS to provide space for 2 Nos. of 765 kV line bays at Sirohi PS along with the space for switchable line reactor. iii. Developer of Fatehgarh -III PS (Section -2) to provide space for 2 Nos. of 400 kV line bays at Fatehgar h-III PS (Section -2). iv. Switchable line reactors to be implemented with NGR bypass arrangemen t v. Implementation of A, B, C, D, E, F, H1, H2 packages shall be aligned. vi. The implementation timeline mentioned above is tentative. Final Timeline would be indicated i n the RfP Document. 14. Transmission System for Evacuation of Po wer from Rajasthan REZ Ph -IV (Part -2 : 5.5 GW) (Jaisalmer/Barmer Complex): Part H1 Tentative Implementation timeframe : 24 months from SPV Transfer Scope: Sl. No . Scope of the Transmission Scheme Capacity 1. Establishment of 765/400 kV (2x1500 MVA), 40 0/22 kV (2x500 MVA) & 220/132 kV (3x200 MVA) Kurawar S/s with 2x330 MVAR 765 kV bus reactor and 1x125 MVAR, 420 kV bus reactor. Future Provisions : Space for • 765/400 kV IC T along with bays - 4 no. • 765 kV line bays along with switchable line reactors – 8 nos. • 765 kV Bus Reactor along with bay: 2 no. • 765 kV Sectionaliser bay: 1 -set • 400 kV line bays along with switchable line reactor – 8 nos. • 400/220 kV IC T along with bays - 6 nos. • 420 kV Bus Reactor along with bay: 3 nos. • 400 kV Sectionalization bay: 1 - set • 220 kV line bays: 12 nos. • 220 kV Sectionalization bay: 1set • 220 kV BC and TBC: 1 no. • 220/132 kV ICT along with bays: 5 Nos. • 132 kV line bays: 16 no s. • 132 kV Se ctiona lization bay: 1 set • 765/400 kV, 1500 MVA ICT – 2 (7 single units of 500 MVA including one spare unit) • 400/220 kV, 500 MVA ICT – 2 • 220/132 kV, 200 M VA ICT – 3 • 765 kV ICT bays - 2 • 400 kV ICT bays - 4 • 220 kV ICT bays – 5 • 132 kV ICT bays - 3 • 330 MVAR 765 kV bus reactor -2 • 125 MVAR 420 kV bus reactor -1 • 765 kV reactor bay - 2 • 765 kV line bays - 4 • 400 kV line bays - 4 • 400 kV reactor bay - 1 • 220 kV BC – 1 • 220 kV T BC – 1 • 132 kV TBC – 1 • 110 MVAR, 765 kV, 1 -ph reactor (spare unit) -1 • 80 MVAR, 765 kV , 1-ph reactor (spare unit) -1 REC Power Developm ent and Cons ultanc y Limited • 132 kV TBC – 1 no. • STATCOM (±300 MVAR) along with MSC (2x125 MVAR) & MSR (1x125 MVAR) along with 400 kV bay. 2. Mandsaur – Kurawar 765 kV D/c line Route length: 235 km 3. 240 MVAR switchable line reactors on each ckt at bot h ends of Ma ndsaur – Kurawar 765 kV D/c line • 240 MVAR, 765 kV switchable line reactor - 4 (2 for Mandsa ur end and 2 for Kurawar end) • Switching equipment for 765 kV line reactor - 4 (2 for Mandsaur end and 2 for Kurawar end) 4. 2 nos. of 765 kV line bays a t Mandsaur S /s for termination of Mandsaur – Kurawar 765 kV D/c line • 765 kV line bays – 2 Nos. (for M andsaur end) 5. LILO of Indore – Bhopal 765 kV S/c line at Kurawar LILO route length: 15 km. 6. Kurawar – Ashtha 400 kV D/c (Quad ACSR/AAAC/AL59 moos e equivalent ) line Route length: 65 km 7. 2 nos. of 400 kV line bays at Ashtha (MP) S/s for terminati on of Kurawar – Ashtha 400 kV D/c line 400 kV line bays – 2 Nos. [for Ashtha (MP) end] 8. LILO of one circuit of Indore – Itarsi 400 kV D/c line at Asth a LILO rout e leng th: 30 km 9. 2 nos. of 400 kV line bays at Ashtha (MP) S/s for LILO of one circuit o f Indore – Itarsi 400 kV D/c line at Astha 400 kV line bays – 2 Nos. [for Ashtha (MP) end] 10. Shujalpur – Kurawar 400 kV D/c (Quad ACSR/AAAC/AL59 moo se equivalen t) line Route length: 40 km 11. 2 nos. of 400 kV line bays at Shujalpur(PG) S/s for ter mination of Shujalpur – Kurawar 400 kV D/c line 400 kV line bays – 2 Nos. [for Shujalpur (PG) end] Note: i. The line lengths mentioned above are approxim ate as the e xact l ength shall be obtained after the detailed survey. ii. MPPTCL has confirmed availability of space for 2 nos. 400 kV bays at Ashta (MP) S/s and for 2 nos. additional bays, MPPTCL has informed that adjacent land is private land and may be purch ased by the projec t developer at their cost as per requirement. iii. Implementation of A,B,C,D, E ,F, H1 & H2 packages shall be aligned iv. TSP of the subject scheme shall implement Inter -tripping scheme on Mandsaur – Kurawar 765 kV D/c line (for tripping of the switchable l ine re actor at Mandsaur/Kurawar end along with the main line breaker). v. Switchable line reac tors to be implemented with NGR bypass arrangement vi. Developer of Mandsaur S/s to provide space for 2 Nos. 765 kV line bays for Mandsaur – Kurawar 765 kV D /c line. vii. POW ERGRID to provide space for 2 Nos. 400 kV line bays at Shujalpur S/s for Shujalpur – Kurawa r 400 kV D/c line. viii. The implementation timeline mentioned above is tentative. Final Timeline would be indicated in the RfP Document. 2. The appointment of the Bid Process Coordinator is subject to th e conditions laid down in the Guidelines issued by Ministry of Power in this regard, amended from time to time. [F. No. 15/3/2018 -Trans -Part(1) ] BIHARI L AL, Under Se cy. (T ransmission) NOTIFICATION New Delhi, the 29th August, 2023 S.O. 3895(E). —In exercise of the powers conf erred by sub - para 3.2 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (no. 36 of 2003), the Central Government had notified/ modified scope of following transmission schemes for implementation under Tariff Based Competitive Bidd ing (TBCB) vi de Gaz ette Notification mentioned below table: Sl. No. Name of the Scheme Gazette Notifica tion by which Scheme was notified 1. Transmission System for Evacuation of Power from REZ in Rajasthan (20 GW) under phase -III Part B1 S.O. 5032 (E) dat ed 6.12.2021 [F.No. 15/3/2018 -Trans -Part(1) And S.O. 1724 (E) dated 23.02.2023 [F.NO. 15/3/2018 –Trans -Part( 1)] 2. Now, the Central Government has decided to modify the scope of above mentioned scheme after examining the recommendations of the 14th meeting of Natio nal Co mmittee on Transmission (NCT). As such, the scopes of scheme “Transmission System fo r Evacuation of Power from REZ in Rajasthan (20 GW) under phase -III Part B1” is hereby modified as under: Sl. No . Revised Scope 1. Establishment of 2x15 00 MVA, 765/4 00 kV & 3x500 MVA, 400/220 kV pooling station at Bhadla -3 along with 2x330 MVAR (765 kV) B us Reactor & 2x125 MVAR (420 kV) Bus Reactor • 765/400 kV 1500 MVA ICTs: 2 Nos. (7x500 MVA including one spare unit) • 765 kV ICT bays - 2 Nos. • 400/22 0 kV, 500 MVA ICT – 3 Nos. • 765 kV line bays -2 Nos. • 400 kV ICT bays – 5 Nos. • 220 kV ICT bays - 3 Nos. • 220 kV line bays: 5 Nos. • 330 MVAR Bus Reactor -2 Nos. (7x110 MVAR, including one spare unit) • 765 kV reactor bay - 2 Nos. • 125 MVAR, 420 kV bus reactor - 2 Nos. • 420 kV re actor bay - 2 Nos. Future provisions: Space for • 765/400 kV ICTs along with bays: 2 Nos. • 765 kV line bay along with switchable line reactor: 6 Nos. • 765 kV line bay: 4 Nos. • 765 kV Bus Reactor along with bays: 2 Nos. • 400/220 kV ICTs along wit h bays: 10 No s. • 400 k V line bays: 8 Nos. • 400 kV line bays along with switchable line reactors: 8 Nos. • 400 kV Bus Reactor along with bays: 2 Nos. • 400 kV Sectionalization bay: 2 sets • 220 kV line bays: 12 Nos. • 220 kV Sectionalization bay: 2 sets 2. Bhadl a-3 PS – Sikar -II S/s 7 65 kV D/c line along with 330 MVAR Switchable line reactor for each circuit at e ach end of Bhadla -3 PS – Sikar -II S/s 765 kV D/c line • Switching equipment for 765 kV 330 MVAR switchable line reactor – 4 Nos. • 765 kV, 330 MVAR Switchabl e line reactor - 4 Nos. 3. 765 kV line bays at Sikar -II • 765 kV line bays – 2 Nos. i. Provision of suitabl e sectionalization shall be kept at Bhadla -3 at 400 kV & 220 kV level to limit short circuit level. ii. Developer of Sikar -II S/s to provide space for 2 Nos . of 765 kV lin e bays a t Sikar -II S/s along with space for switchable line reactors. iii. Space provision f or future 2 Nos. 220 kV Bus Coupler bay and 2 Nos. Transfer Bus Coupler Bay shall be kept for bus switching scheme requirement. 3. Bid Process Co-ordinators f or above scheme will remain unchanged, as per original notification. [F. No. 15/3/2018 -Trans-Part (1)] BIHARI LAL , Under Secy . (Trans) Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free