Gazette Tracker
Gazette Tracker

Core Purpose

The Central Government withdraws 76550.90 Sqm. of land from acquisition in Mouza – Raynagar, P.S. – Bansdroni, Kolkata, previously notified for the construction of Metro Railway between Tolly – Garia.

Detailed Summary

The Ministry of Railways (Metro Railway, Kolkata) issued Notification S.O. 4113(E) on 10th September, 2025, announcing the Central Government's withdrawal of 76550.90 Sqm. of land from acquisition. This withdrawal is exercised under Section 93(1) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The land, located at Mouza – Raynagar, P.S. – Bansdroni, Kolkata – 700070, District – South 24 Parganas, was originally notified for acquisition via Gazette of India Notification No. 208, dated 28.02.2003, for the purpose of constructing the Metro Railway between Tolly – Garia. The withdrawal applies to land parcels where possession has not yet been taken. The detailed Withdrawal Land Schedule specifies multiple Dag numbers (e.g., 61, 62, 64, 67, 68, 69, 70, 71, 72, 73, 74, 75, 79, 88, 89, 447, 448, 449, 450, 451, 468, 484) and indicates a total area of 76550.90 Sqm. to be de-notified from an original total area of 84550.90 Sqm., with 8000.00 Sqm. having been previously acquired. The boundaries of the land include Tolley's Nullah to the North, Jay Engineering Works shed to the South and East, and Public Road (Usha Road) to the West. The notification was signed by Ajay Kumar, Chief Engineer/O&M.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-WB-E-15092025-266160 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY NEW DELHI, WEDNESDAY, SEPTEMBER 10, 2025/BHADRA 19, 1947 MINISTRY OF RAILWAYS (Metro Railway, Kolkata) WITHDRAWAL NOTIFICATION Kolkata, the 10th September, 2025 S.O. 4113(E).— In exercise of the powers conferred under Section-93 (1) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, the Central Government do hereby withdraw 76550.90 Sqm. of Land from acquisition as per the Land schedule given below at Mouza – Raynagar, P.S. – Bansdroni, Kolkata – 700070, District – South 24 Parganas. The following land was previously notified in Extraordinary Gazette of India for acquisition vide Gazette of India Notification No. 208, dated 28.02.2003 for the purpose of construction of Metro Railway between Tolly – Garia of which possession has not been taken. Withdrawal Land Schedule Schedule of Land/Dag to be de-notified (withdrawn) in connection with Construction of Metro Railway between Tolly - Garia, Area Description and Boundary of Land, Premises, Building etc. +-------+-------------------------------------------+----------+---------+---------------------------------------------+-------------------------+-----------------------------------+----------------------------+------------------------------+ | Sl. | Purpose for | Mouza | Dag | Total Area as | Area acquired | Area to be | Boundary of | Description of | | No. | which land was | | No. | per BL & LRO | (in Sqm.) | de-notified | the Land | Land/Premises | | | to be acquired | | | record (in Sqm.) | | (in Sqmı) | | | +-------+-------------------------------------------+----------+---------+---------------------------------------------+-------------------------+-----------------------------------+----------------------------+------------------------------+ | 1 | | | 61 | 4493.64 | 1519.00 | 2974.64 | | | | 2 | | | 62 | 1983.68 | 856.00 | 1127.68 | | | | 3 | | | 63 | 1329.00 | 1329.00 | 0.00 | | | | 4 | | | 64 | 890.63 | 778.00 | 112.63 | | | | 5 | | | 65 | 1115.00 | 1115.00 | 0.00 | | | | 6 | | | 66 | 776.00 | 776.00 | 0.00 | | | | 7 | | | 67 | 728.70 | 234.00 | 494.7 | | | | 8 | | | 68 | 4088.81 | 214.00 | 3874.81 | North: | | | 9 | | | 69 | 2874.31 | | 2874.31 | Tolley's | | | 10 | Construction of Metro Railway from Tolly | Raynagar | 70 | 1740.78 | | 1740.78 | Nullah, | | | | - Garia and other works connected | | | | | | | | | | therewith | | | | | | | | | 11 | | | 71 | 688.22 | | 688.22 | South: Jay | M/s Jay | | 12 | | | 72 | 526.28 | | 526.28 | Engineering | Engineering | | 13 | | | 73 | 15221.71 | 112.00 | 15109.71 | Works shed, | Works | | 14 | | | 74 | 5910.56 | | 5910.56 | East: Jay | | | 15 | | | 75 | 2064.65 | | 2064.65 | Engineering | | | 16 | | | 79 | 23520.78 | 1067.00 | 22453.78 | Works shed, | | | 17 | | | 88 | 4534.13 | | 4534.13 | | | | 18 | | | 89 | 2793.35 | | 2793.35 | West: Public | | | 19 | | | 447 | 121.45 | | 121.45 | Road (Usha | | | 20 | | | 448 | 40.48 | | 40.48 | Road) | | | 21 | | | 449 | 283.38 | | 283.38 | | | | 22 | | | 450 | 404.83 | | 404.83 | | | | 23 | | | 451 | 566.77 | | 566.77 | | | | 24 | | | 468 | 728.70 | | 728.7 | | | | 25 | | | 484 | 7125.06 | | 7125.06 | | | +-------+-------------------------------------------+----------+---------+---------------------------------------------+-------------------------+-----------------------------------+----------------------------+------------------------------+ | Total area (in Sqm.) | | | 84550.90 | 8000.00 | 76550.90 | | | +-------+-------------------------------------------+----------+---------+---------------------------------------------+-------------------------+-----------------------------------+----------------------------+------------------------------+ [F. No. MRTS/W-90/49/Land Acquisition/GC/Pt.III] AJAY KUMAR, Chief Engineer/O&M Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054. GORAKHA NATH YADAVA Digitally signed by GORAKHA NATH YADAVA Date: 2025.09.15 16:11:17 +05'30'

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free