Notification of intent by Western Railway (Construction Organization) to apply for powers under Section 164 of the Electricity Act, 2003 to establish a 132kV transmission line and substation between Bharuch and Ankleshwar, Gujarat.

Detailed Summary

The Ministry of Railways, Western Railway (Construction Organization), by Notification S.O. 3673(E) dated 16th August 2023 (F. No. DyCEE-C-BRC/EL/TSS/Ankleshwar/164), states that the Chief Administrative Officer (Construction) of the Ministry of Railways intends to apply, or has applied, to the Government of India to confer powers under Section 164 of the Electricity Act, 2003 for placing electric lines and plant, read with the Indian Telegraph Act, 1885 for telegraph line/post placement, to undertake survey, construction, installation, erection, commissioning, operation and maintenance of the proposed 132kV Ankleshwar Transmission Sub-Station (TSS) scheme. The scheme comprises a 132kV double-circuit line from the 132kV Bharuch substation to the proposed Ankleshwar TSS, running 5.150 route-km overhead with ACSR Panther conductor and 4.350 route-km underground cable (total 9.5 route-km), passing through the villages of Ankleshwar, Survadi, Gadkhol, Andada, Chhapra, Jhareswariya, Samor, Borbatha, Juna Kansia, Makatampur and Bharuch in Bharuch district, Gujarat. The notice invites public observations/representations within two months to the Deputy Chief Electrical Engineer (Construction), Western Railway, Pratapnagar, Vadodara, where the route alignment copy can also be inspected. The notification is signed by Pramod Gadre, Chief Electrical Engineer (Construction).

Full Text

5294 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99 EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY No. 3514] NEW DELHI, THURS DAY, AUGUST 17 , 2023/ SHRAVANA 26, 1945 CG-MH-E-17082023-248161 [फ़ा. सं. DyCEE -C-BRC/EL/TSS/Ankleshwar/164] MINISTRY OF RAILWAYS [Western Railway (Construction Organization )] NOTIFICATION Mumbai, the 16th August , 2023 S.O. 3673(E).—Chief Administrative Officer (Construction)/Ce ntral Government/ Ministry of Railways having its registered office at Deputy Chief Electrical Engineer (Construction), Western Railway, Office, Near DRM Office, Pratapnagar, Vadodara -390004, intends to apply/has applied to the Government of India to conf er upon him all the powers under Section 164 of the Electricity Act, 2003 for the placing of electric lines or electrical plant for the transmission of electricity or for the purpose of telephonic or telegraphi c communications necessary for the proper coordination of works which telegraph authority possess under the Indian Telegraph Act 1885 with respect to the placing of telegraph lines and posts for the purpose of a telegraph established or maintained, by the Government or to be so established or maintained and will undertake the survey, construction, installation, inspection, erection and other works to be followed by commissioning, operation, maintenance and other works for the following transmission schemes. Sl. No. Name & brief particulars of the Scheme Area of Work 1 132kV Ankleshwar TSS 132kV D/C (3 -Phase) Line from 132kV Bharuch S/S to Ankleshwar TSS (WR) on OH Tower line with ACSR Panther conductor (5.150 RKM) and partially with UG cable (4.350 RKM) ha ving total line length: 9.5 RkM.(3 -Phase System) The proposed BEE Line from proposed 132kV Ankleshwar TSS to existing 132kV Bharuch S/s passes through Village: Ankleshwar, Survadi, Gadkhol, Andada, Chhapra, Jhareswariya, Samor, Borbatha, Juna Kansia, Makta mpur & Bharuch. The transmission lines covered under the scheme will pass through, over, around, and between the following villages, towns and cities: - Description of Location Village, Taluka & District Latitude Longitude GETCO Bharuch S/s: Village: B haruch, Taluka & District: Bharuch. N21 42 34.1 E73 00 32.6 Prop. 132 Ankleshwar TSS Village: Bharuch, Taluka & District: Bharuch. N21 38 40.4 E73 00 25.4 Notice is hereby given to the general public to make observation/ representation on the proposed tr ansmission system within two months from the date of publication of this notice before (date) to the office of the Deputy Chief Electrical Engineer (Construction), Western Railway, Pratapnagar, Vadodara, Gujarat in writing. Copy of the route alignment und er this notification can be seen in the office of the Deputy Chief Electrical Engineer (Construction), Western Railway, Pratapnagar, Vadodara, Gujarat. [F. No. DyCEE -C-BRC/EL/TSS/Ankleshwar/164] PRAMOD GADRE, Chief Electrical Engineer (Construction) Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free