JOINT ELECTRICITY REGULATORY COMMISSION
(For the UT of J&K and the UT of Ladakh )
NOTIFICATION
Jammu, the 29th November, 2023
No. JERC -JKL/Reg/2023/17 .—In exercise of the powers conferred on it by sub -section (1) of Sect ion 181 and
Clauses (za) and (zb) of Sub -section (2) of Section 181, read with Sections 30, 57, 58, 59 and Clause (i) of Sub -
section (1) of Section 86 of the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in this behalf, the
Joint Elec tricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh hereby makes the
following Re gulations:
Chapter 1: General
1. Short Title, Commencement , and Extent
i. These Regulations shall be called the Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir
and the UT of Ladakh (Transmission Performance Standards) Regulations, 2023.
ii. These Regulations shall be applicable to all the licensees engaged in the transmission of electricity in the UT of
Jammu & Kashmir and the UT of Lada kh.
iii. These Regulations shall come into force from the date of their publication in the Official Gazette .
2. Definitions
2.1 In these Regulations, unless the context otherwise requires:
1. “Act” means the Electricity Act, 2003 (36 of 2003), including amendments theret o;
2. “Affected Person” means a user of an Intra -State Transmission System, who is affected due to non -
adherence to the Standards of Performance specified in these Regulations by the Transmission Licensee;
3. “Availability” means time in hours; the transmissio n system is capable to transmit electricity at its rated
voltage from the supply point to the delivery point and shall be expressed in percentage (%) of total hours in a
given period;
4. “Delivery Point or Interconnection point” means the physical to uch point where the electric power is
supplied/received by the user to/from the State transmission system;
5. “Extra High Voltage (EHV)” or “Extra High Tension (EHT)” means the voltage, which exceeds 33,000
volts; under normal conditions subject, however, to the percentage variation allowed under electricity rules;
6. “Force Majeure Event” means, with respect to any party, any event or circumstance, which is not within the
reasonable control of, or due to an act or omission of, that party and which, by the exerc ise of reasonable care
and diligence, that party is not able to prevent, including, without limiting the generality of the foregoing:
i. Acts of God, including but not limited to lightning, storms , earthquakes, floods , drought , and natural
disasters ;
ii. strikes, lockouts, go -slow, bandh , or other industrial disturbances;
iii. acts of public enemy, wars (declared or undeclared), blockades, insurrections, riots, revolution, sabotage,
vandalism , and civil disturbance;
iv. unavoidable accident, including but not limited to fi re, explosion, radioactive contamination , and toxic
chemical contamination;
v. any shutdown or interruption of the grid, which is required or directed by the State or Central Government or
by the Commission or the State Load Despatch Centre;
7. “State Grid Code” means the State Grid Code specified by the Commission under clause (h) of Sub -section
(1) of Section 86 of the Act;
8. “Intra-state Transmission System (I STS)” means State Transmission System which includes the entire
transmission network within the State ex cluding the Inter -State Transmission System;
9. “Remote areas” means the far -flung areas of the UT of J&K and the UT of Ladakh including snowfall areas.
10. “State Transmission Utility (STU)” means the Board or the Government Company specified as such by the
State Government under Sub -section (1) of Section 39 of the Act;
11. “System Average Interruption Duration Index (SAIDI)” means the average duration of sustained
interruptions at a time occurring during the reporting period for a voltage class, determined by divi ding the
number of EHV sub -stations in service during the reporting period having that class of voltage supply;
12. “System Average Interruption Frequency Index (SAIFI)” means the average frequency of sustained
interruptions at a time occurring during the repo rting period for a voltage class, determined by dividing the
number of EHV sub -stations in service during the reporting period having that class of voltage supply;
13. “State Transmission System” means the system of EHV network and electrical equipment operate d and/or
maintained by the Transmission Licensee for the purpose of the transmission of electricity among generating
stations, external interconnections, distribution systems , and any other user s connected to it;
14. “Transmission Licensee” means a licensee au thorized under section 14 of the Act to establish or operate
transmission lines. At present " Jammu & Kashmir Power Trans mission Corporation Limited ( JKTCL)" is the
transmission licensee in the State;
15. “User” means any person who uses any segment/ element o f the Intra -State Transmission System including
Generating Station located in the State /UT, Independent Power Producer(s), Renewable Energy Power Plant,
Distribution Licensee, Deemed Licensee, Open Access Customer interconnected to State Transmission
Syste m and entered into Transmission Service Agreement with Transmission Licensee; and
16. “Year” means financial year
2.2 The words and expressions used in these Regulations and not defined herein, but defined in the Act / Rules or
any other Regulations of the Commiss ion, shall have the meaning assigned to them under the Act / Rules or any
other Regulations of the Commission.
Chapter 2: Objective, Norms , and Methodology
3. Objective - (1) These standards of performance shall serve as guidelines for the Transmission License e to operate
its Transmission System for providing an efficient, reliable, coordinated , and economical system of electricity
supply and transmission.
(2) These standards set the levels of operational security and quality of supply, which a licensee shall b e obliged
to maintain in making power available for the purposes of supply/receipt to/from the user. The objectives of the
performance standards are -
i. to ensure that the Grid Performance meets a minimum standard, which is essential for the User’s system
demand and the equipment function properly;
ii. to enable the Users to design their systems and equipment to suit the electrical environment that they
operate in;
iii. to ensure compliance with Standards of Performance by Transmission Licensees; and
iv. to monitor the operational performance of the Transmission Licensees.
4. Performance Standards - All Transmission Licensees shall comply with the following Standards of
performance specified in these Regulations:
i. Voltage Variation
ii. Frequency Variation
iii. Safety Standards
iv. Transmis sion System Availability
v. Reliability Indices
vi. Restoration Time
Provided that standards of performance as specified in these Regulations shall be minimum standards that
Transmission Licensee shall achieve and maintain:
Provided furt her that any time limits s et in these Regulations shall refer to the maximum time permitted for
performing activities to which they relate to:
Provided further that Transmission Licensee shall also comply with “Standards for Operation and Maintenance
of Transmission Lines” as speci fied in the Central Electricity Authority (Grid Standards) Regulations, 20 10 as
amended from time to time;
i. Voltage Variation:
a. Voltage Variation is defined as the deviation of the root-mean -square (RMS) value of the voltage from
its nominal value, expresse d in terms of percent. Voltage Variation may be either of short duration not
exceeding one minute or long duration for a time greater than one minute.
b. For the purpose of these standards, the sustained variation in steady -state voltage exceeding one -minute
duration shall be considered. The specified permissible limits of sustained voltage variation shall not
apply in the cases where the circumstances are reasonably beyond the control of the State Transmission
Utility /Transmission Licensee e.g. major break -downs, grid failures, accidents, system distress
conditions , etc.
c. State Transmission Utility /Transmission Licensee shall make all possible efforts to ensure that the grid
voltages remain within the following voltage levels at all EHT sub -stations of its Tr ansmission System:
Voltage (kV rms)
Nominal Voltage
(kV) Maximum Minimum Reference
Limit (%) Value (%) Limit (%) Value (%)
765 +5 800 -5 728 State Grid Code
400 +5 420 -5 380 State Grid Code
220 +10 245 -10 198 State Grid Code
132 +10 145 -7 122 State Grid Code
33 +10 35 -9 30 State Grid Code
d. The compliance with above standards is subjected to the following conditions:
- Voltage is maintained by PGCIL, at Transmission Licensee/ State Transmission Utility interfaces, as
per limits.
- Discoms drawal at a power factor not below 0.95 lagging.
- Loading of all lines limited to the Surge Impedance Loading
- (SIL) in normal conditions.
e. The compliance shall be reported as per Annexure - 1A to 1E.
ii. Frequency Variation:
a. State Transmission System shall always operate a s an integral part of the Northern grid. However,
frequency management is the joint responsibility of all constituents of the Northern grid. State
Transmission Utility /Transmission Licensee shall be responsible for complying with the provisions of
the IEG C/State Grid Code. Further State Transmission Utility /Transmission Licensee shall fulfill its
responsibility to keep the frequency within the following specified ranges:
Target Range (As per State Grid Code) Variation (%) Value (Hz)
Upper Limit +0.1% 50.05 Hz
Lower Limit -0.2% 49.90 Hz
b. The compliance shall be as per Annexure -2.
iii. Safety Standards
a. State Transmission Utility /Transmission Licensee shall observe the general safety requirements as laid
down in the Central Electricity Authority (Measures re lating to Safety and Electric Supply) Regulations,
2010 , and its amendments for construction, installation, protection, operation , and maintenance of the
electric supply lines and apparatus.
b. State Transmission Utility /Transmission Licensee shall designate suitable persons as designated officers
as specified in the State Grid Code for coordination of safety procedures before work is taken up, during
work, and after work is completed till the concerned system component is energized, both inside its own
Trans mission System and across a control boundary between State Transmission Utility’s/Transmission
licensee's Transmission System and that of any user.
c. State Transmission Utility / Transmission Licensee shall develop its own Operation and Maintenance
Manual (i ncluding Safety Regulations) taking into consideration the safety requirements for the
construction, operation , and maintenance of electrical plants and electric lines as may be specified by the
Central Electricity Authority under Clause (c) of section 73 of the Act.
d. A consolidated report on the compliance of each clause of section 6.2(c) of this regulation shall be
submitted to the Commission in the proforma enclosed in Annexure — 3.
iv. Transmission System Availability
The availability of the AC Transmission system shall be calculated as per the applicable (Terms &
Conditions for the Determination of Tariff), Regulations , and its amendment.
The AC and HVDC System Availability shall not be below 98.0%.
The compliance shall be reported as per Annexure - 4 (a), (b ), (c).
v. Reliability Indices
(a) System Average Interruption Frequency Index (SAIFI) -
System Average Interruption Frequency Index (SAIFI) SAIFI = Σ I / N
Where,
Σ I = Sum number of interruptions exceeding 5 minutes at a time duration in the month for the voltag e
class.
N = Number of EHV sub -stations in service at the beginning of month having that class of voltage
supply.
(b) System Average Interruption Duration Index (SAIDI) -
SAIDI = Σ D/ N
Where,
Σ D = Sum of the duration of all interruptions of exceeding 5 minut es at a time in the month for the
voltage class.
N = Number of EHV substations in service at the beginning of the month having that class of voltage
supply:
Provided that all interruptions of a duration exceeding 5 (five) minutes at a time shall be conside red for
computation of indices:
Provided further that interruptions due to scheduled outages , load shedding to meet capacity shortage,
failure of Inter -State Transmission System , or failure of generating units (leading to grid failure or
system islanding) shall be excluded.
(c) SAIFI and SAIDI for the transmission system shall be calculated on a monthly basis for each voltage
class as per items (a) and (b) above and the same shall not be exceeded to the values as given in Table -1
below:
TABLE -1
(d) The detail of SAIFI and SAIDI shall be submitted to the Commission as per Regulation 7 of these
Regulations.
vi. Restoration Time
Restoration time for different types of failures of transmission lines , power transf ormers , and reactors shall
be as per the following Table: -
TABLE -2
Sl
No. Type of Failure Restoration Time from the date of occurrence of failure
(Days)
1. Insulator failure
Other than remote areas 1
Remote Areas Summer Months
(April to October) Winter Months
(November to March)
3 4
2. Tower after collapse by Emergency
Restoration System (ERS) 7
3. Tower after collapse
Other than remote areas 30
Remote Areas Summer Months
(April to October) Winter Months
(November to March)
90 120
4. Phase conductor broken
Other than remote areas 2
Remote Areas Summer Months
(April to October) Winter Months
(November to March)
3 7
5. Failure of earth wire
Other than remote areas 1
Remote Areas Summer Months
(April to October) Winter Months
(November to March)
3 5
6. Restoration of Failure of Power
Transformer/Inter Connecting Transformer
(Single/three Phase) If Transformer is available 7
If Transformer is not
available 180
7. Restoration of the failed reactor If the reactor is available 7
If the reactor is not
available 180
Note:
1. In the event of different types of failure of transmission lines , transformers , and reactors, the power supply of the
affected area(s) has to be restored on top priority.
5. Payment of Comp ensation and Penalty - Any failure by the Transmission Licensee to maintain the standards of
performance for restoration time of various elements as specified in Table -2 of clause (vi) of Regulation 4 shall
render the concerned licensee liable for payment o f compensation as per Regulation 6 of these Regulations to an
affected person claiming such compensation:
Provided that any failure by the Transmission Licensee to maintain the standards of performance as provided in
Regulation 4, except Clause (vi), the p enalties for such failure shall be determined by the Commission:
Provided further that the payment of compensation by the Transmission Licensee shall be without prejudice to
any penalty, which may be imposed or any prosecution which may be initiated by the Commission in accordance
with the provisions of the Act:
Provided further that the Transmission Licensee shall not be entitled to recover the amount of
compensation/penalty through tariff from the users.
SAIFI SAIDI
2 interruptions per month 30 minutes per month
6. Methodology for Compensation -
i. An affected person , within ninety (90) days from the date of restoration of transmission element for the
standards as specified in Table -2 of clause (vi) of Regulation 4, may make an appropriate Petition to the
Commission for the award of compensation along with necessary d ocumentary evidence of being affected
because of non -adherence of Standards of Performance.
ii. The Commission shall determine the compensation after giving reasonable opportunity to the concerned
transmission licensee of being heard:
Provided that the compens ation to be paid by the Transmission Licensee to the affected party shall be 1.5
times of the applicable transmission charges for the affected person during such period of non -adherence of
Standards of Performance or as awarded by t he Commission through it s order.
Chapter -III Information to be furnished by Transmission Licensees
7. Information to be furnished by Transmission Licensees -
(1) All Transmission Licensees, shall furnish the following information to the Commission for every financial
year - the level of performance achieved with regard to the standard of performance, as indicated in clause (i)
to Clause (vi) of Regulation 4 of these Regulations, as per the formats given in Annexure 1 -7;
(2) The report shall be submitted within 60 days from the end of the fin ancial year.
(3) The Commission may, from time to time, modify the contents of the formats and add new formats as per the
requirement. The same shall be communicated to the transmission licensee for reporting.
(4) All Transmission Licensees shall display on their websites the actual performance against the specified
Standards of Performance on a monthly basis and the aggregate amount of compensation paid, if any, in the
formats enclosed in Annexure -7.
Provided that such information also be displayed by the Commissi on on its w ebsite.
8. Annual Review of Performance Standards - The Commission, by an Order, may designate a Nodal Agency or
a Committee to review the performance of each Transmission Licensee every year and submit its
recommendations, if any, to the Commissio n.
9. Force Majeure - The Commission may, if it considers necessary or expedient to do so and for the reasons to be
recorded in writing, relax adherence to any specific Standard of Performance during the Force Majeure event:
Provided that the Transmission Lic ensee shall not be discharged from its liability on account of its failure to
maintain the Standards of Performance under these Regulations if such failure is attributed to the negligence or
deficiency or lack of preventive maintenance of the State transmi ssion system or failure to take reasonable
precaution which has resulted in a loss to the affected person.
Chapter -IV Miscellaneous
10. Power to remove difficulties - If any difficulty arises in giving effect to any of the provisions of these
Regulations, the Commission may, either suo -motu or on an application made to it, by general or special order,
make such provisions, not inconsistent with the provisions of the Act or provisions of other Regulations as
specified by the Commission, as may appear to be neces sary for removing the difficulty in giving effect to the
objectives of these Regulations.
11. Power to amend - The Commission, may, at any time, add, vary, alter, modify , or amend any of the provisions of
these Regulations.
12. Power to Relax - The Commission may, by general or special order, for reasons to be recorded in writing, and
after giving an opportunity of being heard to the parties likely to be affected by the grant of relaxation, may relax
any of the provisions of these Regulations on its own motion or o n an application made before it by an interested
person for the period specified in the order.
By Order of the Commission.
V. K. DHAR, (JKAS) Secy.
[ADVT. -III/4/Exty./ 610/2023 -24]
Annexure —1A
Voltage Variation Performance Achieved During the Year (FY…...) Voltage — 765 KV Bus at EHV Substations
Standard Limits - Maximum +5% or 800 KV & Minimum -5% or 728 KV
Sl. No. Name Of Substation Max. Voltage Actually Achieved Min. Voltage Actually Achieved
% KV % KV
1.
N
Annexure - 1B
Voltage Variation Performance Achieved During the Year (FY……. ) Voltage —400KV Bus at EHV Substations
Standard Limits - Maximum +5% or 420KV_ & Minimum -5% or 380KV
Sl. No. Name Of Substation Max. Voltage Actually
Achieved Min. Voltage Actually
Achi eved
% KV % KV
1.
N
Annexure —1C
Voltage Variation Performance Achieved During the Year (FY…… ) Voltage —220KV Bus at EHV Substations
Standard Limits - Maximum +10% or 245KV & Minimum -10% or 198KV
Sl. No. Name Of Substa tion Max. Voltage Actually
Achieved Min. Voltage Actually
Achieved
% KV % KV
1.
2.
N
Annexure — 1D
Voltage Variation Performance Achieved During the Year (FY……. )Voltage —132KV Bus At EHV Substations
Standard Limit s - Maximum +10% or 145 KV & Minimum -7% or 122 KV
Sl. No. Name Of Substation Max. Voltage Actually Achieved Min. Voltage Actually
Achieved
% KV % KV
1.
2.
Annexure - 1E
Voltage Variation Performance Achieved During the Year (FY…… )Voltage —33 KV Bus At EHV Substation s
Standard Limits - Maximum +10% or 36 KV & Minimum -9% or 30 KV
Sl. No. Name Of Substation Max. Voltage Actually Achieved Min. Voltage Actually
Achieved
% KV % KV
1.
2.
Annexure - 2
Frequency Varia tion Performance Achieved During the Year (FY…….. ) Standard Frequency — 50 Htz
Target Range : Maximum +0.1% or 50.05 Htz and Minimum -0.2% 49.90 Htz
Sl. No. Frequency Range Duration in % age of Time
1 Above 50.3 Htz
2 From 50.05 to 50.3 Htz
3 From 50 to 50.05 Htz
4 From 49.90 to 50 Htz
5 From 49.50 to 49.90 Htz
6 From 49.2 to 49.50 Htz
7 Below 49.2 Htz
Annexure - 3
Confirmation Report On Security Standards For the Year (FY…… ..)
Annexure —4 (a)
System Availability Achieved During the Year (FY……… .) at the Different Voltage Levels
Standard Limits: 98.0%
System Voltage Actual Achieved
Q1 Q2 Q3 Q4 Year
765 kV
400 kV
220 kV
132 kV
Over All (AC System)
HVDC Transmiss ion
system
Annexure —4 (b)
For each quarter:
Element Total outage time
during the quarter
(minutes) Total outage time during the
quarter considered for
computation of Availability
(minutes) % Availability
During the
Quarter
AC Transmission line
Power Transformer/
Interconnecting
Transformer (ICT)
Reactors
Static VAR Compensator
Series Compensator
HVDC ( Back -to-back
Stations and bi-pole links)
Annexure — 4 (c)
System availability of five major Critical Lines
Sl. No. With Regard to Whether Compiled Reason for De viation, if any
1 General Safety Requirements
2 Supports Standards and Safety
Clearances
3 Line Crossing and Guarding
4 Earthing
5 Safety and Protective Devices
6 Protection Against Lightening
7 Unused Overhead Lines
SR NO. DESCRIPTION UNIT (%) TARGET FOR THE
QUARTER ACTUAL FOR THE
QUARTER CUMULATIVE TARGET
TILL THE END OF THE
CURRENT QUARTER CUMULATIVE
ACHIEVED TILL END
OF CURRENT
QUARTER % VARIATION IN
CUMULATIVE
ACHIEVEMENT w.r.t.
CUMULATIVE TARGET CUMULATIVE
ACHIEVEMENT FOR
THE SAME PERIOD
LAST YEAR % VARIATION
IN CUMULATIVE
COMPARED TO THE
SAME PERIOD OF
LAST YEAR
Annexure — 5
SAIFI and SAIDI of the Transmission System
Months SAIFI (in Numbers) SAIDI (in mins)
April
May
March
Annexure — 6
The restoration times for different types of failures of a transmission line and failure of the power transformer
and reactor in the following format:
Details of Elements where restoration time has exceeded the standards specified in Regulation 4
Sl.
No. Types of failures Name of
element Restoration time as per
regulations Actual restoration time
(in days)
Non-remote
areas Remote
areas
1. Insulator failure i)
ii)
2. Tower after collapse without
emergency Restoration System i)
ii)
3. Failure of earth wire i)
ii)
4. Restoration of failed Power
Transformer/Inter Connecting
Transformer (Single/three Phase
Unit) i)
ii)
5. Failure of Reactors (Single/three
Phase Unit) i)
ii)
6. Restoration of the failed reactor i)
ii)
Annex ure — 7
Details of compensation paid by the transmission licensee under Regulations 5&6.
Element Name Violation of Regulation 4(vi) Compensation Paid (in Rs.)
Restoration time as per
Regulation (in days) Actual restoration
time (in days)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text