Full Text
7089 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99
EXTRAORDINARY
PART III—Section 4
PUBLISHED BY AUTHORITY
No. 756] NEW DELHI, THURS DAY , NOVEMBER 9, 2023/ KARTIKA 18, 1945 17, 1945
CG-JK-E-10112023-250005
JOINT ELECTRICITY REGULATORY COMMISSION
For The UT of J&K and the UT of Ladakh.
NOTIFICATION
Jammu, the 1st, November 2023
No.--JERC -JKL/REG/2023 /12:— In exercise of the powers conferred under Section 86(1)(b) read with
Section 181 of the Electr icity A ct, 2003 (Act No. 36 of 2003) (hereinafter referred to as the ‘Act’), and all other
powers enabling it in this behalf, the Joint Electricity Regulatory Commission for the UT of J&K and UT of Ladakh
hereby makes the following Regulations.
1: SHORT TITLE , COMMENCEMENT , AND EXTENT
1.1 These Regulations shall be called the Joint Electricity Regulatory Commission for the UT of J&K and the UT of
Ladakh ( Guidelines for Load Forecasts, Resources Pla ns, and Power Procurement Process) Regu lations, 2023.
1.2 These Reg ulations shall apply to Jammu and Kashmir Power Corporation Ltd (JKPCL) and all the Distribution
Licensees in the territory of the UT of Jammu & Kashmir and the UT of Ladakh and shall be applicable to all
inter/intra state purchase s of power from conventio nal and renewable sources made or proposed to be made by
JKPCL or by any Distribution Licensee s.
1.3 These Regulations shall come into force from the date of their publica tion in the Official Gazette.
2: DEFINITIONS
2.1 In these Regulat ions, unless it is repugn ant to the context:
a. "Act" means the Electricity Act, 2003 (36 of 2003);
b. “Commission ” means the Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the
UT of Ladakh;
c. “JKPCL ” means the Jammu and Kashmir Power Corporation Ltd, who proc ures power on beha lf of the
Distribution Licensees operating in the UT of Jammu & Kashmir and the UT of Ladakh;
d. “Long -term power procurement ” means Procurement of power under any arrangement or agreement with a
term or duration exceeding seven years;
e. “Med ium-term pow er procurement ” means Procurement of power under any arrangement or agreement
with a term or duration exceeding three months but not exceeding five years;
f. “Month ” means a calendar month as per the British Calendar;
g. “Power Exchanges ” mean any Exchange s operating as power exchanges for electricity in terms of the
guidelines issued by the Central Electricity Regulatory Commission ;
h. “Power Purchase Agreement (PPA )” means the agreement entered into between the Procurer(s) and the
Seller pursuant t o which the Seller shall supply power to the Procurer(s) as per the terms and conditions
specified therein;
i. “Power Sale Agreement (PSA)” shall m ean the back -to-back agree ment entered into between the Buying
Entity(s) and the Intermediary Procurer/trader fo r the onward sale of power purchased under any power
purchase agreement;
j. “Short -Term Power Procurement ” means Procurement of power under any arr angement or agreement w ith
a term or duration less than or equal to three months; and
k. “Year ” means the financial year commencing on 1st April of the calendar year and ending on 31st March of
the subsequent calendar year;
2.2 Unless the context otherwise requi res, the words a nd expressions in these Regulations shall bear the same
meaning as defined in the Electricity Ac t, 2003 (No. 36 of 2003), and Regulations notified by the Joint
Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of La dakh and amendme nts
thereof.
3: POWER PROCUREMENT PLAN
3.1 The Distribution Licensee along with JKPCL shall prepare the power procurement plan for a period of 5 years
with due regard to the requirement of electricity in its area of supply. The plan may include long-term, medium -
term, and short -term sources of power purchase , as per demand –supply position, in accordance with these
Regulations .
3.2 The Power Procurement plan presents a framework for long -term forecasting of power demand, energy
requirement , and supp ly positions and the need for the development of Long/ Medium/Short Term Power
purchase agreements/arrangements with:
a. State -owned old as well as new generation sources;
b. Central sector plants;
c. Independent power producers (IPP);
d. Captive Power Plants;
e. Power Trading Companies;
f. Power Market; and
g. Any other source.
4: FRAMEWORK FOR POWER PROCUREMENT PLANN ING
4.1 The Distrib ution Licensee in consultation with JKPCL for the MYT control period shall submit the Power
Procurement Plan along with necessary supporting doc uments for approval as a part of the Business Plan:
The Power Purchase procurem ent plan , as submitted under the Business plan , shall be submitted as a part of the
ARR petition to be filed by the Distribution licensee every year;
4.2 The 5 -year power procuremen t plan would comprise the following:
a. Monthly and yearly demand projection (MW) and energy requirement (MU) for each year;
b. Forecast of monthly and yearly availability from state -owned stations and purchases from all stations or
sources with which the Licen see has long -term/medium -term PPAs;
c. Asse ssment of the demand -supply deficit considering peak, and off -peak perio ds (as per daily/monthly 24 -
hour load curve) and plans to bridge the deficit and resource planning accordingly;
d. Quantum of purchase to be made f rom Renewable Energy Plants consideri ng the approved RPO trajectory to
meet the RPO requirement as specified in the relevant regulations ;
e. The power procurement plan shall also include a plant -wise yearly estimate for the cost of power purchase
including tr ansmissi on and other incidental charges:
Provided that power purchase cost shall be allowed in Retail Supply Ta riff after exercising prudence check as per
provisions in prevailing MYT Regulations read with other relevant Regulations;
f. The demand forecast and a ssessment of avail ability shall be as detailed in Regulations 4.4 to 4.15 below.
4.3 While examining the plan t he Commission may call for such additional information and data as it may deem
necessary for reviewing the Power Procurement Plan and the Distri bution Licensee / JKPCL shall furnish such
information, as and when required by the Commission and during techni cal validation, the licensee shall
demonstrate the power procurement forecast methodology .
A. Demand and Energy Forecast:
4.4 The assessment shall be based on trends and statistical analysis of historical data, future projections, and
forecasted results of the i mplementation of business plans.
4.5 The demand and energy forecast shall be prepared considering the following:
a) Category -wise monthly energy consu mption and monthly & yearly energy requirement forecast based on the
year-on-year growth/ Compound Annual Growth Rate ( CAGR ) for the past period and time series analysis.
b) Overall economic growth projections;
c) Change in number of consumers for categories, ex pected increase in connected load (kW), applications for
load enhancement/load reduction/new connections/disconn ections, and the month -wise energy consumption
for each consumer category;
d) The impact of the possible switchover of consumers to open access and captive generation;
e) Impact of Storage capacities including Batteries, Pump Storage systems, Electric Vehicle c harging stations,
etc.;
f) Impact of decentralized renewable energy plants set up under various initiatives;
g) Impact due to new schemes implemented by UT Govt /Central Government;
h) The effect of important festivals, working days or non -working days, the impact of Peak an d Off -peak hours
load pattern, hours of operation, and seasonal variations, cropping pattern, rainfall pattern, etc;
i) Standards to be m aintained with regard to quality and reliability of supply, in accordance with the relevant
Regulations of the C ommissi on;
j) Measures taken and proposed for energy conservation, energy efficiency, and Demand Side Management;
4.6 The Distribution Licensee(s) may follow the methodology adopted by the Central Electricity Authority (CEA) or
any other method like econometric a nalysis for forecasting.
4.7 The Licensee shall carry out Load Research studies of various consumer categories to understand their diurnal
consumpti on pattern and how diversity in their usages helps in flattening the demand curve.
B. Assessment of Availabi lity:
4.8 The Distribution Licensees along with JKPCL shall carry out technology/fuel -wise categorization of existing
generation capacity and any pipeline capacity which has been planned to be added to get an optimal energy mix
to meet the rise in energy demand.
4.9 The Distribution Licensees along with JKPCL shall develop a resource plan with different scenarios for RE
integration with conventional power sourc es and the adoption of different storage technologies to meet the peak
load during high -demand se asons.
4.10 The Plan t Availability (PAF) of the State Thermal power plants shall be considered on the basis of past patterns.
In the case of Central Generating stat ions, the planning norms as per CEA/CERC as applicable for coal -based
and gas -based units ma y be considered. In the case of IPPs, past performance shall be considered to estimate the
availability of power. PAF for all new/upcoming thermal projects shall be considered as per norms provided in
the State/Central tariff regulations.
4.11 The Capacity Utilization Factor (CUF) of existing solar and non -solar power plants shall be considered on the
basis of the past performance of the plant. For new/upcoming projects t he CUF shall be estimated considering
CUF as per the PPA of the plant.
4.12 For estimat ing availability from Hydro Po wer Plants (HPPs), past years’ rainfall pattern and corresponding
actual month -wise energy availability shall be considered , thereby reflecting the seasonal variation in generation
pattern for estimating the quantum of energy for forthcoming years.
4.13 The Distribution L icensee s / JKPCL shall follow a similar method as detailed above in Regulations 4.10 to 4.12
in case of consideration of Auxiliary co nsumption for different power plants.
4.14 The quantum of energy to be procured from renewable energy plants shall be as per the RPO trajectory in the
relevant Regulations and amendments thereof.
4.15 While estimating the energy availability , the Distribution Licens ees / JKPCL shall explore other o ptions like
banking/power market and bilateral arrangements with other state -owned utilities to ensure power availability
during Peak Periods .
C. Assessment to Involve Consultation:
4.16 The Distribution Licensees / JKPCL shall make long -term/medium -term demand and supply availability
assessments in consultation with any or all concerned including State Generating Companies, Distribution
Licensees , Central Generating Companies and Transmission Companies / National / State/Region al Load
Dispatch Centres, and Central Electricity Authority.
D. Other Considerations:
4.17 Any new Capacity arrangement /tie-up shall be subject to the prior approval of the Commission in view of
necessity, the reasonableness of the cost of power purchase , and prom otion of working in an efficient,
economical, and equitable manner.
4.18 All procurement of long -term/medium -term/s hort-term power from various sources shall be carried out as per the
guidelines/rules/ Regulations issued by the Central Governmen t/Commission fr om time to time.
4.19 Any new power purchase agreements or amendments to existing Power Purchase Agreements (PPAs ’)/ Power
Sale Agreements (PSA) entered into by the Distribution Licensees/ JKPCL shall be subject to the prior approval
of the Commission.
5: V ARIATION IN POWER PURCHASE
5.1 The Distribution Licensees / JKPCL may undertake additional power procurement durin g the year, over and
above the power procurement plan approved by the Commission, in accorda nce with this Regulation.
Provided that where ther e has been an unanticipated increase in the demand for electricity or a shortfall or failure
in the supply of el ectricity from any approved source of supply during the year or when the sourcing of power
from existing tied -up sources becomes costlier than o ther available alternative sources, the Distribution
Licensees /JKPCL may enter into additional agreement or arr angement for the procurement of power.
Provided that the Distribution Licensees / JKPCL may enter into a short -term arr angement or agreement fo r the
procurement of power without the prior approval of the Commission when faced with emergency conditions tha t
threaten the stability of the distribution system, or when directed to do so by the SLDC to prevent grid failure.
5.2 Within thirty days from the date of entering into an agreement or arrangement for short -term power procurement
for which prior approval is not taken, the Distribution Licensees / JKPCL shall submit to the Commission its
details, including the quantum, Tar iff computations, duration, supplier particulars , method of supplier selection
and such other details as the Commission may require so as to assess that the conditions specified in this
Regulation have been complied with.
6. PLACING OF INFORMATION ON WEBSITES
6.1 The monthly/weekly/d ay-ahead/intraday power procurements/sale by the Distribution Licensees / JKPCL and
generator schedule shall be made av ailable on the websites of the Distribution Licensees / JKPCL, as applicable,
and SLDC within 30 days of such procurements/sale with ease of access to the current as well as archived data.
6.2 SLDC shall also publish the monthly Merit Order Dispatch (MoD) stack along with p er unit variable cost of each
generating station on their website.
7: CONSTITUTION OF A DEDICATED CELL
7.1 Around -the-clock dedicated cell for power procurement shall be constituted by JKPCL within three months of the
regulat ion coming into for ce. The cell should have the requisite capability and tools for energy forecast. The cell
shall co -ordinate and consult with the Distri bution Licensees to do the energy forecasting. The cell shall have the
power to purchase/sell the ener gy in real -time, in tra-day, day -ahead, week ahead, or any longer duration through
Power Exchanges or any other means. JKPCL shall frame suitable guideline s for the modus operandi of the
dedicated cell in line with the spirit of this Regulation and apprise the Commis sion for the same within 45 days of
the coming into force of these Regulations.
8: MISCELLANEOUS
A. Non-Compliance with these Regulations:
8.1 In the event of the Distribution Licensee s / JKPCL not complying with these regulations, the Commission, in
additi on to impo sing such penalty as it may deem fit, may initiate Suo -Motu proceedings as per appropriate
provisions of the Electricity Act 2003.
B. Issue of Orders and Practice Directions:
8.2 Subject to the pro vision of the Electricity Act 2003 and these regulat ions, the Commission may, from time to
time, issue orders and practice directions with regard to the implementation of the regulations and proce dures to
be followed.
C. Powers to Remove Difficulties:
8.3 If any difficulty arises in giving effect to any of the p rovisions of these Regulations, the Commission may, by
general or special order, direct the SLDC, generators, licensees, JKPCL and the Open Acce ss Customer, to tak e
suitable action, not being inconsistent with the provisions of the Act, which appears to th e Commissi on to be
necessary or expedient for the purpose of removing the difficulties.
8.4 The Distribution L icensees , JKPCL and SLDC may make an application to the Commission and seek suitable
orders to remove any difficulties that may arise in the implemen tation of these regulations.
D. Power to amend:
8.5 The Commission may from time to time add, vary, alter, modify, or amend any provisions of these r egulatio ns
after following the necessary procedures.
E. Savings:
8.6 Nothing in these Regulations shall be deemed to limit or o therwise aff ect the inherent power of the Commission
to make such orders as may be necessary to meet the ends of justice or to prevent abuses of the process of the
Commission.
8.7 Nothing in these Regulations shall bar the Commission from adopting i n conformi ty with the provisions of the
Act a procedure, which is at variance with any of the provisions of these Regulations, if the Commission , in view
of the special circumstances of a matter or class of matters and for reasons to be recorded in writing , deems it
necessa ry or expedient for dealing with such a matter or class of matters.
8.8 Nothing in these Regulations shall, expressly or impliedl y, bar the Commission from dealing with any matter or
exercising any power under the Act for which no Regulation s have bee n framed, and the Commission may deal
with such matters, powers and functions in a manner it thinks fit.
By order of the Commission .
V.K.DHAR , (JKAS) , Secy.
[ADVT.-III/4/ Extey.538/2023 -24]
Uploaded by Dte. of Printing at Government of Indi a Press, Ring Road, Mayapuri, New De lhi-110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text