Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-HR-E-14062024-254713
EXTRAORDINARY
PART III-Section 4
PUBLISHED BY AUTHORITY
No. 411]
NEW DELHI, WEDNESDAY, JUNE 12, 2024/JYAISHTHA 22, 1946
JOINT ELECTRICITY REGULATORY COMMISSION
(For the State of Goa and Union Territories)
NOTIFICATION
Gurugram, the 27th May, 2024
Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Standard of
Performance for Distribution Licensees) (First Amendment) Regulations, 2024
No. 19/20/2015-JERC/1680-In exercise of the powers conferred under Section 181(1) and 181 (2) (za &
zb) of the Electricity Act, 2003, the Joint Electricity Regulatory Commission (for the State of Goa & Union
Territories) hereby makes the following amendments in the Joint Electricity Regulatory Commission for the State of
Goa and UTs (Standards of Performance for Distribution Licensees) Regulations, 2015 (hereinafter referred to as the
Principal Regulations).
1) Short Title, Commencement and Extent
(a) These Regulations may be called the Joint Electricity Regulatory Commission for the State of Goa and Union
Territories (Standard of Performance for Distribution Licensees) (First Amendment) Regulations, 2024.
(b) These Regulations shall come into force from the date of their publication in the Official Gazette.
(c) These Regulations shall extend to the State of Goa and the Union Territories of Andaman & Nicobar Islands,
Lakshadweep, Dadra & Nagar Haveli and Daman & Diu, Puducherry and Chandigarh.
2) AMENDMENT IN REGULATION 4 OF THE PRINCIPAL REGULATIONS:
(i) Following shall be inserted after Regulation 4.1 (g):
g(a) Customer Average Interruption Duration Index (CAIDI) means the average interruption duration of the
sustained interruptions (each longer than 3 minutes) for those who experienced interruptions during the reporting
period, as specified by the commission.
g(b) CUSTOMER AVERAGE INTERRUPTION FREQUENCY INDEX (CAIFI) MEANS THE AVERAGE
INTERRUPTION FREQUENCY OF THE SUSTAINED INTERRUPTIONS (EACH LONGER THAN 3
MINUTES) FOR THOSE WHO EXPERIENCED INTERRUPTIONS DURING THE REPORTING PERIOD, AS
SPECIFIED BY THE COMMISSION.
(ii) Following shall be inserted after Regulation 4.1 (l):
l(a) Momentary Average Interruption Frequency Index (MAIFI) means the average number of momentary
interruptions (each less than or equal to 3 minutes) per consumer occurring during the reporting period, as specified by
the commission.
(iii) Following shall be inserted after Regulation 4.1 (p):
p(a) System Average Interruption Duration Index (SAIDI) means the average duration of the sustained interruptions
(each longer than 3 minutes) per consumer occurring during the reporting period, as specified by the commission.
p(b) System Average Interruption Frequency Index (SAIFI) means the average frequency of the sustained
interruptions (each longer than 3 minutes) per consumer occurring during the reporting period, as specified by the
commission.
3) AMENDMENT IN REGULATION 8 OF THE PRINCIPAL REGULATIONS:
(i) Regulation 8.1 shall be substituted as under:
If the licensee fails to meet the specified standards of performance, the licensee shall pay compensation to the affected
consumer as per in Schedule-I of these Regulations.
(ii) Regulation 8.3 shall be substituted as under:
The payment of compensation shall be made to the affected consumers as per the rates specified under Schedule III of
these Regulations by way of adjustment against current and/or for future bills from supply of electricity within 90 day
from the date of violation of specified standards.
(iii) Following shall be inserted after Regulation 8.3:
8.3a In case, the licensee fails to pay the compensation amount as laid down in Schedule-III of these Regulations,
the aggrieved consumer(s) may approach the respective Consumer Grievances Redressal Forum (CGRF) to seek such
compensation.
8.3b CONSUMER SHALL BE AUTOMATICALLY COMPENSATED FOR THOSE PARAMETERS WHICH
CAN BE MONITORED REMOTELY WHEN IT CAN BE SUCCESSFULLY ESTABLISHED THAT THERE IS
A DEFAULT IN PERFORMANCE OF THE DISTRIBUTION LICENSEE.
8.3c The distribution licensee, within six months from the date of notification of these Regulations shall create an
online facility on which consumers may register their complaints and claim the compensation. The information in this
regard shall be widely circulated amongst consumers through appropriate means including mass media, bills, SMS, e-
mails or by uploading on licensee's website."
4) AMENDMENT IN REGULATION 9 OF THE PRINCIPAL REGULATIONS
(i) Following shall be inserted after Regulation 9.5:
9.5a The licensees shall endeavour to provide all services through a common Customer Relation Manager (CRM)
System to get a unified view of all the services requested, attended and pending, at the back end for better monitoring
and analysis.
9.5b The CRM shall have facilities for SMS, email alerts, notifications to consumers and officers for receipt of
application, completion of service, change in status of application, etc; online status tracking and auto escalation to
higher level, if services are not provided within the specified time period.
(ii) Following shall be inserted at the end of Regulation 9.6:
The distribution licensee shall arrange to give due publicity through media, TV, newspapers, website and by
displaying in boards at consumer service related offices to bring awareness for consumer rights, standards of
performance, compensation provisions, grievance redressal, measures for energy efficiency and any other schemes of
the distribution licensee.
(iii) Following shall be inserted after Regulation 9.7
9.8 The distribution licensee shall make available manual of procedure for providing common services and
handling customer grievances for reference of consumers at every office of the distribution licensee and downloadable
from its website.
9.9 The distribution licensee shall arrange to display feeder wise outage data, efforts made for minimising
outages, prevention of theft or unauthorised use of electricity or tampering, distress or damage to electrical plant,
electric lines or meter and results obtained during the year, on its website.
9.10 whenever the existing meters are to be replaced by any new technology meters, the distribution licensee shall
take adequate measures to create consumer awareness regarding the advantages of replacement of the existing meters.
distribution licensee shall issue a public notice in at least four daily newspapers. such information shall also be
displayed on the distribution licensee's website and the distribution licensee shall indicate the area wise schedule of
dates for replacement of such meters.
5) Amendment in “Schedule–I Guaranteed Standards of Performance” of the Principal Regulations
Following shall be inserted after Clause 15 of Schedule-I:
15(a): Release of new electricity connection
+-----+-------------------------------------------------------+------------------------------------------------------------------------------------------------------------------------------------------------+
| | Nature of request | Timeline |
+=====+=======================================================+================================================================================================================================================+
| 1. | New connection/additional load where | Metro Cities: within 3 days from receipt of application |
| | supply can be provided from existing | complete in all respect in the appropriate form. |
| | network | |
| | | Urban/Municipal areas: within 7 days from receipt of |
| | | application complete in all respect in the appropriate form. |
| | | |
| | | Rural area: within 15 days from receipt of application |
| | | complete in all respect in the appropriate form. |
| | | |
| | | Rural area of Islands: 30 days from receipt of application |
| | | complete in all respect in the appropriate form. |
+-----+-------------------------------------------------------+------------------------------------------------------------------------------------------------------------------------------------------------+
| ii. | Extension work or enhancement of | The distribution licensee shall supply the electricity to such |
| | transformer capacity is required/ | premises immediately after such extension or |
| | extension of distribution mains, or | commissioning within a period not exceeding 90 days." |
| | commissioning of new substations. | |
+-----+-------------------------------------------------------+------------------------------------------------------------------------------------------------------------------------------------------------+
6) Amendment in "Schedule-II Overall Standards of Performance” of the Principal Regulations
(i) Following shall be inserted after Clause 8 of Schedule-II:
8 a Release of new electricity connection:
The Licensee Shall Achieve the Standards of Performance as Specified at sl. No. 15a of Schedule-I of these
Regulations.
(ii) Clause 15 of Schedule-II shall be substituted as under:
15a the distribution licensee shall supply 24x7 power to all consumers. however, the commission may prescribe lower
hours of supply for some categories of consumers like agriculture in business plan/tariff order.
15b there shall be a uniform system of recording and reporting of distribution system reliability performance. the
same reliability indices shall be imposed on all licensees. the performance target levels set by the Commission
shall be unique to each licensee to be based initially on the historical performance of licensee and the same shall
be set in the Business Plan.
(iii) Clause17 of Schedule-II shall be substituted as under:
The licensee shall compute value of the distribution reliability indices viz. SAIFI, SAIDI, MAIFI, CAIFI and
CAIDI separately for the Urban Area, Rural area as per the formula and methodology as specified at Sl. No.
18 in this Schedule.
The distribution licensee shall put in place a mechanism, preferably with automated tools to the extent possible
for monitoring and restoring outages.
(iv) Clause 18 of Schedule-II shall be substituted as under:
18. The indices shall be computed for licensee as a whole by stacking, for each month all the 11kV feeders in
the supply area and then aggregating the number and duration of all interruptions in that month for each
feeder. The indices would then be computed using the following formulae:
a. SAIFI = Σ(Aᵢ × Nᵢ)/Nₜ
b. SAIDI = Σ(Bᵢ × Nᵢ)/Nₜ
c. MAIFI = Σ(Cᵢ × Nᵢ)/Nₜ
d. CAIFI = Σ(Aᵢ × Nᵢ)/Nₐ
e. CAIDI = Σ(Bᵢ × Nᵢ)/Nₐ
where,
Aᵢ= Total number of sustained interruptions (each longer than 3 minutes) on iᵗʰ Feeder for the month.
Bᵢ= Total duration of all sustained interruptions (each longer than 3 minutes) on iᵗʰ Feeder for the month.
Cᵢ= Total number of momentary interruptions (each less than or equal to 3 minutes) on iᵗʰ Feeder for the month.
Nᵢ=Number of Consumers of iᵗʰ feeder affected due to each interruption.
Nₜ=Total number of Consumers at 11kV feeders in licensee's supply area.
Nₐ= Total number of Consumers at 11kV feeders in licensee's supply area who experience interruptions during
the reported period
n = Number of 11 kV feeders in licensee's supply area (excluding agricultural feeders)
Note:
(a) The feeders must be segregated into Urban area and Rural area and the value of the indices must be reported
separately for each month.
(b) Licensee shall propose the target level of these indices annually at the time of submitting ARR. The
Commission would thereafter notify these indices.
(v) Following shall be inserted after Clause 18 of Schedule-II
19. In view of the increasing pollution level particularly in the metros and the cities with a population 100,000
and above, the distribution licensee shall endeavor to ensure 24x7 uninterrupted power supply to all the
consumers, to avoid running the diesel generator sets.
20. The consumers, who are using the diesel generator sets as essential back up power, shall endeavor to shift to
cleaner technology such as renewable energy with battery storage etc., within five years from the date of
commencement of these Regulations.
21. The process of giving temporary connections to the consumers for construction activities or any temporary
usage and the like shall be simplified by the distribution licensee and connection shall be provided not later
than forty-eight-hours and within seven days in case augmentation of the distribution system is required. This
shall avoid any use of diesel generator sets for temporary activities in the area of the distribution licensee.
22. The temporary connection shall be through a pre-payment meter or through consumer meters as defined in the
Central Electricity Authority (Installation and Operation of Meters) Regulations as amended from time to
time.
7) AMENDMENT IN "SCHEDULE-III COMPENSATION" OF THE PRINCIPAL REGULATIONS
(i) Schedule-III shall be substituted as under:
In case of failure of licensee to meet the guaranteed Standards of Performance as specified in Schedule-I of
these Regulations, compensation shall be payable to the consumer, as shown in the table below:
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| S.No.| Performance Parameters | Compensation payable | Automatic/Manual |
| | | to individual | |
| | | consumer in case of | |
| | | violation of Standard | |
| | | (default shall be | |
| | | considered from the | |
| | | time consumer has | |
| | | made complaint) | |
+======+=========================+========================================================================================================================+===================+
| I. | | Billing of Consumers | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 1. | Raising of Final Bill | Within 2 Billing Cycles | 10% of the Billed |
| | | | amount subject to |
| | | | maximum of Rs. 500/-|
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 2. | In case Bills are raised| | Rs 500/- for each case |
| | even after disconnection| | |
| | on consumer's request | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 3. | Resolution of Billing | Resolve within 7 days of | Rs 100/- for each day of | Automatic
| | Complaints | receipt of complaint, if no | default |
| | | additional information is | |
| | | required. If required, within 7 | |
| | | days of receipt of additional | |
| | | information | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 4. | Consumer requiring upto | Licensee to carry out special | Rs 100/- for each day of |
| | date bill | reading and prepare final bill | default |
| | | within 7 days | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| II. | | Transfer of consumer's connection and conversion of services | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 5. | Change of consumer's | Within 2 Billing Cycles of | Rs 100/- for each day of | Automatic
| | name due to change in | acceptance of application | default |
| | ownership/occupancy for | | |
| | property | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 6. | Transfer of consumer's | Within 2 Billing cycles of | Rs 100/- for each day of | Automatic
| | name to legal heir | acceptance of application | default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 7. | Load Reduction | 30 days after receipt of the | Automatic |
| | | application | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 8. | Change of Category | Within 10 days of acceptance | |
| | | of application | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 9. | Shifting of Meter/Service| Within 30 days of consumer | |
| | Line etc. | depositing the estimated | |
| | | amount for which the licensee | |
| | | is allowed 30 days. | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| III. | | Release of new electricity connection | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 10. | New | Metro Cities: within 3 days | |
| | connection/additional | from receipt of application | |
| | load where | complete in all respect in the | |
| | supply can be provided | appropriate form. | |
| | from existing network | | |
| | | Urban/Municipal areas: | |
| | | within 7 days from receipt of | |
| | | application complete in all | |
| | | respect in the appropriate | |
| | | form. | |
| | | | |
| | | Rural area: within 15 days | |
| | | from receipt of application | |
| | | complete in all respect in the | |
| | | appropriate form. | |
| | | | |
| | | Rural area of Islands: 30 | |
| | | days from receipt of | |
| | | application complete in all | |
| | | respect in the appropriate | |
| | | form. | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 11. | Extension work or | The distribution licensee shall | Rs.200/- for. Each day| Manual
| | enhancement of | supply the electricity to such | of default |
| | transformer capacity is | premises immediately after | |
| | required/ extension of | such extension or | |
| | distribution mains, or | commissioning within a | |
| | commissioning of new | period not exceeding 90 days. | |
| | substations | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| IV. | | Disconnection/Reconnection of Supply | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 12. | Request for reconnection| In case consumer requests for | Rs 100/- for each day of| Automatic
| | | reconnection within a period | default |
| | | of six months after dis- | |
| | | connection, the Licensee shall | |
| | | reconnect the consumer's | |
| | | installation within 7 days of | |
| | | payment of past dues and | |
| | | reconnection charges. | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| V. | | Meter Complaints | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 13. | Testing of Meter | Within 30 days of receipt of | |
| | | complaint | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 14. | Replacement of burnt | Within 6 hours of restoration | Rs 100/- for each day of| Automatic
| | meter | supply by bypassing the burnt | default |
| | | meter. Meter to be replaced | |
| | | within 15 days. | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 15. | Replacement of defective| Within 15 days of declaring | |
| | meter | Meter defective after testing | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| VI. | | Power Supply failure | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 16. | Fuse blown out or MCB | Within 4 hours for Urban | Rs 40/- for each hour of| Automatic
| | Tripped (in case fuse or| areas Within 12 hours in | default |
| | MCB belongs to Licensee | Remote areas. | |
| | i.e. pole or feeder pillar| | |
| | fuse) | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 17. | Service line broken service| Within 6 hours for Urban | |
| | line snapped from the Pole| areas within 12 hours for | |
| | | Rural areas | Rs 300/- for each day of| Automatic
| | | Rectification of fault and | default |
| | | thereafter Restoration of | |
| | | normal power supply within | |
| | | 12 hours | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 18. | Fault in distribution line/| Rectification within 24 hours | |
| | system | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 19. | Breakdown of | Replacement of failed | |
| | underground Cables | transformer within 24 hours in | |
| | | Urban areas; | |
| | | Within 48 hours in rural areas; | |
| | | Within 60 hours in Remote | |
| | | areas. | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 20. | Distribution transformer| Rectification of fault within 12 | Rs 400/- for each day of| Automatic
| | failed/burnt | hours | default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 21. | HT mains failed | Repair and restoration of | Rs 1000/- for each day| Automatic
| | | supply within 48 hours | of default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 22. | Problem in grid (11kV or| As per 15.8 of Schedule-I | Rs 1000/- for each day| Automatic
| | 33kV or 66 kV) substation| | of default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 23. | Failure of Power | Within 3 days | Rs 100/- for each day of| Automatic
| | Transformer | | default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| VII. | | Voltage fluctuation | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 24. | Local problem on | Within 15 days for LT System | Rs 200/- for each day of| Automatic
| | Transformer | Within 30 days for HT System | default |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 25. | Distribution network | Within 180 days | Rs 500/- for each day of| Automatic
| | problem where no | | default |
| | expansion on enhancement| | |
| | of network is involved | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
| 26. | Distribution network | | |
| | problem, if upgradation of| | |
| | distribution system | | |
| | including erection and/or| | |
| | enhancing capacity of sub-| | |
| | station is required | | |
+------+-------------------------+------------------------------------------------------------------------------------------------------------------------+-------------------+
8) AMENDMENT IN "ANNEXURE- III" OF THE PRINCIPAL REGULATIONS
(I) S.No. 3 of Annexure-III shall be substituted as under:
(a) SAIFI
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Sl.No.| Month | Nᵢ = Number of Consumers | Aᵢ = Total number of sustained | Nₜ= Total number of | =Σ(Aᵢ ×Nᵢ) | SAIFI=(2)/(1) |
| | | of iᵗʰ feeder | interruptions (each | Consumers at | For all 11kV | |
| | | affected due to | longer than 3 | 11kV feeders in | feeders | |
| | | each | minutes) on iᵗʰ | licensee's | excluding | |
| | | interruption | feeder for the | supply (1) | agriculture | |
| | | | month | | feeders (2) | |
+=======+=======+=================================================+===================================================================================+=========================================================+===================================================================================+====================+
| I | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| N | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Total | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
(b) SAIDI
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Sl.No.| Month | Nᵢ = Number of Consumers | Bᵢ = Total duration | Nₜ = Total number of | =Σ(Bᵢ ×Nᵢ) | SAIDI=(2)/(1) |
| | | of iᵗʰ feeder | of all sustained | Consumers at | For all 11kV | |
| | | affected due to | interruptions (each | 11kV feeders | feeders | |
| | | each | longer than 3 | in licensee's | excluding | |
| | | interruption | minutes) on iᵗʰ | supply (1) | agriculture | |
| | | | feeder for the | | feeders (2) | |
| | | | month | | | |
+=======+=======+=================================================+===================================================================================+=========================================================+===================================================================================+====================+
| I | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| N | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Total | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
(c) MAIFI
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Sl.No.| Month | Nᵢ = Number | Cᵢ = Total | Nₜ= Total | =Σ(Cᵢ ×Nᵢ) | MAIFI=(2)/(1) |
| | | of Consumers | number of | number of | For all 11kV | |
| | | of iᵗʰ feeder | momentary | Consumers at | feeders excluding | |
| | | affected due to | interruptions | 11kV feeders | agriculture | |
| | | each | (each less than or | in licensee's | feeders (2) | |
| | | interruption | equal to 3 | supply (1) | | |
| | | | minutes) on iᵗʰ | | | |
| | | | feeder for the | | | |
| | | | month | | | |
+=======+=======+=================================================+===================================================================================+=========================================================+===================================================================================+====================+
| I | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| N | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Total | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
(d) CAIFI
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Sl.No.| Month | Nᵢ=Number of | Aᵢ= Total | Nₐ= Total number of | =Σ(Aᵢ ×Nᵢ) | CAIFI=(2)/(1) |
| | | Consumers of | number of | Consumers at | For all 11kV | |
| | | iᵗʰ feeder | sustained | 11kV feeders in | feeders | |
| | | affected due to | interruptions | licensee's supply | excluding | |
| | | each | (each longer | area who | agriculture | |
| | | interruption | than 3 minutes) | experience | feeders (2) | |
| | | | on iᵗʰ feeder for | interruptions | | |
| | | | the month | during the | | |
| | | | | reported period | | |
| | | | | (1) | | |
+=======+=======+=================================================+===================================================================================+=========================================================+===================================================================================+====================+
| 1 | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| N | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Total | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
(e) CAIDI
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Sl.No.| Month | Nᵢ=Number | Bᵢ = Total | Nₐ= Total number of | =Σ(Bᵢ ×Nᵢ) | CAIDI=(2)/(1) |
| | | of Consumers | duration of all | Consumers at 11kV | For all 11kV | |
| | | of iᵗʰ feeder | sustained | feeders in licensee's | feeders | |
| | | affected due | interruptions | supply area who | excluding | |
| | | to each | (each longer | experience | agriculture | |
| | | interruption | than 3 | interruptions during | feeders (2) | |
| | | | minutes) on iᵗʰ | the reported period | | |
| | | | feeder for the | (1) | | |
| | | | month | | | |
+=======+=======+=================================================+===================================================================================+=========================================================+===================================================================================+====================+
| 1 | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| N | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
| Total | | | | | | |
+-------+-------+-------------------------------------------------+-----------------------------------------------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------------------------------+--------------------+
Note: The Distribution Licensee shall also upload such report on its website.
S.D.SHARMA, Secy. (I/C), JERC
[ADVT.-III/4/Exty./180/2024-25]
Login to read full text