No. 717] NEW DELHI, WEDNES DAY, SEPTEMBER 11 , 2024/ BHADRA 20, 1946
CG-HR-E-12092024-257109
CG-HR-E-12092024-257109
JOINT ELECTRICITY REGULATORY COMMISSION
(For the State of Goa and Union Territories)
NOTIFICATION
Gurugram, the 1st August, 2024
Joint Electricity Regulatory Commission for the State of Goa and Union Territories (S olar PV Grid Interactive
System based on Net Metering & Gross Metering) (First Amendment) Regulations, 2024
No. JERC -24/2019 .—In exercise of the powers conferred under Sub-Section (1) of Section 181 of the
Electricity Act, 2003 and all other powers enablin g it in this behalf, and after previous publication, the Joint
Electricity Regulatory Commission (for the State of Goa and Union Territories) hereby amends its prevailing
(Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (hereinaft er referred to as the Principal
Regulations).
REGULATIONS
1. Short title, commencement, and extent of application:
1.1 These Regulations may be called the Joint Electricity Regulatory Commission for the State of Goa &
Union Territories (Solar PV Grid Interactive System based on Net Metering & Gross Metering) (First
Amendment) Regulations, 2024 (hereinafter referred to as “Net Metering & Gross Metering (First
Amendment) Regulations, 2024”).
1.2 These Regulations shall come into force from the date of publication in the Official Gazette.
1.3 These Regulations shall extend and apply to the State of Goa and the Union Territories of Andaman &
Nicobar Islands, Chandigarh, Dadra & Nagar Haveli and Daman & Diu, Lakshadweep and Puducherry.
1.4 These Regulations shall apply only to the Grid Connected Rooftop mounted, ground mounted and floating
Solar Power Projects.
2. Amendment in Regulation 2 of the Principal Regulations:
(i) Regulation 2.1 (9) of the Principal Regu lations shall be substituted as under:
“Consumer means any person who is supplied with electricity for his own use by a licensee or the
Government or by any other person engaged in the business of supplying electricity to the public
under this Act or any o ther law for the time being in force and includes any person whose premises
are for the time being connected for the purpose of receiving electricity with the works of a licensee,
the Government or such other person, as the case may be.”
(ii) Following shall be inserted after Regulation 2.1 (13) of the Principal Regulations:
“(13) (a) Days means clear working days.”
(iii) Following shall be inserted after Regulation 2.1 (18) of the Principal Regulations:
“(18) (a) Gross -metering means a mechanism whereby the total sol ar energy generated from Grid
Interactive rooftop Solar Photovoltaic system of a Prosumer and the total energy consumed by the
Prosumer are accounted separately through appropriate metering arrangements and for the billing
purpose, the total energy consume d by the Prosumer is accounted at the applicable retail tariff and
total solar power generated is accounted for at feed -in tariff determined by the Commission.
(18) (b) Gross Metering Connection Agreement means an agreement executed between a
Distribution Licensee and an Eligible Consumer.”
(iv) Regulation 2.1 (23) of the Principal Regulations shall be substituted as under:
“Net Metering means a mechanism whereby solar energy exported to the Grid from Grid
Interactive rooftop Solar Photovoltaic system of a Prosu mer is deducted from energy imported from
the Grid in units (kWh) to arrive at the net imported or exported energy and the net energy import or
export is billed or credited or carried -over by the distribution licensee on the basis of the applicable
retail tariff by using a single bi -directional energy meter for net -metering at the point of supply.”
(v) Following shall be inserted after Regulation 2.1 (23) of the Principal Regulations:
“(23) (a) Net-billing or Net feed -in means a single bidirect ional energy meter used for net -billing
or net feed in at the point of supply wherein the energy imported from the Grid and energy exported
from Grid Interactive rooftop Solar photovoltaic system of a Prosumer are valued at two different
tariffs, where -
(i) the monetary value of the imported energy is based on the applicable retail tariff;
(ii) the monetary value of the exported solar energy is based on feed -in tariff determined by the
Commission;
(iii) the monetary value of the exported energy is deducted from the mon etary value of the
imported energy to arrive at the net amount to be billed (or credited/ carried -over).”
(vi) Following shall be inserted after Regulation 2.1 (25) of the Principal Regulations:
“(25) (a) Occupier means the owner, tenant or person in occupation of the premises where
electricity is used or proposed to be used.”
(vii) Following shall be inserted after Regulation 2.1 (27) of the Principal Regulations:
“(27) (a) Owner/legal heirs means the person who is having absolute right over the property.”
(viii) Regulation 2.1 (29) of the Principal Regulations shall be substituted as under:
“Prosumer means a person who consumes electricity from the grid and can also inject electricity
into the grid for distribution licensee, using same point of supply.”
(ix) Following shall be i nserted after Regulation 2.1 (31) of the Principal Regulations:
“31 (a) Resident Welfare Association (referred as the Association) means an association
comprising all the property owners and tenants within a Co -operative Group Housing Society, Multi
storie d Building, Residential Colony, or a similar body registered with the State Government.”
(x) Following shall be inserted after Regulation 2.1 (43) of the Principal Regulations:
“43 (a) Storage means an energy storage system utilizing methods and technologies like solid state
batteries, flow batteries, pumped storage, compressed air, fuel cells, hydrogen storage or any other
technology to store various forms of energy and to deliver the stored energy in the form of
electricity.”
3. Amendment in Regula tion 4 of the Principal Regulations:
(i) Regulation 4.1 of the Principal Regulations shall be substituted as under:
“Solar Projects of capacity up to 500 kWp at one premise based on the technologies approved by MNRE are
eligible for connecting the project with the Grid under these Regulations. The capacity of the Solar Project
to be installed under Group Net Metering or Virtual Net Metering framework shall be up to 500 kWp or up
to the sanctioned load, whichever is lower.
Provided that the Solar Project capacit y higher than 500 kWp shall be under net -billing or net feed -in.
Provided further that in the case of Prosumers availing net -billing or net feed -in, the time -of-the-day tariffs
may be introduced whereby Prosumers are incentivised to install energy storage for utilization of stored
solar energy by them or feeding into the grid during peak hours thus helping the grid by participating in
demand response of the Distribution Licensee:
Provided also that in case of net -metering or net -billing or net feed -in, the distribution licensee may install a
solar energy meter to measure the gross solar energy generated from the Grid Interactive rooftop Solar
Photovoltaic system for the purpose of renewable energy purchase obligation credit, if any:
Provided also that the gr oss-metering may be permitted for Prosumers who would like to sell all the
generated solar energy to the distribution licensee instead of availing the net -metering, net -billing or net
feed-in facility and the generic tariff or feed -in tariff for gross -mete ring shall be determined by the
Commission as per the JERC (Terms and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2019 (as amended from time to time).”
4. Amendment in Regulation 11 of the Principal Regulations:
Following R egulations shall be inserted after Regulation 11.8 of the Principal Regulations:
“11.9 In case of Net billing or Net feed -in, the billing and energy accounting shall be dealt with as under:
a) Net Billing is permitted for eligible prosumer who opt to sell al l generated solar energy to the
distribution licensee while availing consumption of electrical energy as a consumer under an electric
connection through separate circuit.
b) The eligible prosumer under the Net billing or Net feed -in mechanism shall inject the entire power
from the Grid Interactive Solar PV plant to the distribution system of the distribution licensee to the
nearest distribution network of the same voltage under the Power Purchase Agreement as suitably
devised by the distribution licensee.
c) Entire quantum of electricity generated by the prosumer shall be procured under the Power Purchase
Agreement as suitably devised by the distribution licensee at feed -in tariff determined by the
Commission.
d) The distribution licensee shall enter into a Power Pur chase Agreement as suitably devised by the
distribution licensee and a Power Sale Agreement as suitably devised by the distribution licensee with
the consumer for purchase and sale of entire quantum of power generated.
e) Rate of sale of power to the consume r shall be same as applicable retail tariff.
f) The monetary value of the imported energy is computed based on the applicable retail tariff;
g) In case, the prosumer is subjected to Time of Day tariff, the monetary value of the imported energy
shall be computed accordingly;
h) The monetary value of the exported energy is computed based on the feed -in tariff determined by the
Commission;
i) The monetary value of the exported energy is deducted from the monetary value of the imported
energy to arrive at the net amount t o be billed to the prosumer;
j) If the net amount in a billing cycle comes to negative, the same shall be carried over to the next billing
cycle as ‘Billing Credit’;
k) At the end of the settlement period, if there is any outstanding Billing Credit, the prosumer has the
option to receive payment of the net credit balance, if any, or have such credit balance carried over to
the next settlement period.
11.10 In case of Gross -metering, the billing and energy accounting shall be dealt with as under:
(a) Gross meteri ng is permitted for eligible consumer or generator who opt to sell all generated solar energy to
the distribution licensee.
(b) The eligible consumer or generator under the Gross Metering scheme shall inject the entire power
generated from the grid intera ctive Solar PV Energy Generating Plant to the distribution system of the
distribution licensee to the nearest distribution network of same voltage under Power Purchase Agreement
as suitably devised by the distribution licensee.
(c) The distribution license e shall enter into a Power Purchase Agreement (as suitably devised by the
distribution licensee) with the generator for purchase of entire quantum of power generated.
(d) The exported solar energy is paid to the generator at the feed -in tariff determined by the Commission.
(e) The other terms and conditions of power purchase under the Power Purchase Agreement shall be same as
mentioned for the Net Metering.”
5. Amendment in Regulation 16 of the Principal Regulations:
Following Regulation shall be added after Regulation 16.7:
“16.8 For installation of roof top solar photo voltaic systems, the technical feasibility study shall be completed
within a period of fifteen days and the outcome of the study shall be intimated to the applicant, failing which it
shall be presumed that the proposal is technically feasible.
16.9 The applications for roof top solar photo voltaic systems up to 10 kW capacity, complete in all respects
shall be deemed to have been accepted without requiring technical feasibility study and any co mmensurate
enhancement of the sanctioned load of the consumer, as may be required, shall be carried out by the
distribution licensee on application by the Prosumer.
16.10 Subject to Regulation (16.9), during the time period from the feasibility study or de emed acceptance of
the application till the completion of installation, in case, there is any requirement of upgradation of
distribution infrastructure like augmentation of service line, distribution transformer capacity, and the like for
installation of t he required capacity of roof top solar photo voltaic system, the same shall be carried out by the
distribution licensee or consumer, as the case may be:
Provided that the cost of strengthening the distribution infrastructure, including distribution transfo rmer, as
necessary, to facilitate the installation of roof top solar photovoltaic systems up to a capacity of 5 kW or a
higher capacity, shall be included in the revenue requirement of the distribution licensee.
16.11 After installation of roof top solar p hotovoltaic system, the consumer shall submit the installation
certificate to such distribution licensee and such distribution licensee shall complete signing of connection
agreement, installation of meter and successful commissioning of the roof top solar photovoltaic system within
fifteen days from the date of submission of the installation certificate.
16.12 The Formats of connection agreement and installation certificate shall be placed on web -portal of the
distribution licensee.
By Order of the Commis sion,
S. D. SHARMA , Secy. (I/c)
[ADVT. -III/4/Exty./487 /2024 -25]