Full Text
6318 GI/202 3 (1) रजिस्ट्री सं. डी.एल.- 33004/99 REGD. No . D. L. -33004/99
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 4178] NEW DELHI, THURSDAY , OCTOBER 5 , 2023/ ASVINA 13, 1945
CG-GJ-E-07102023-249232
द्वारका 22° 22 ′ 39.53 ″उ 69°04 ′48.15 ″ पू
MINISTRY OF RAILWAYS
(Central Organization for Railway Electrification )
NOT IFICATION
Gujarat, the 5 th October, 2023
S.O. 4349(E).—Central Organization for Railway Electrification having its registered office at 733,
CPD/RE/ADI, D Cabin Road, New Railway Colony, Opp, New Railway Colony Post Office, Sabarmati, Ahmedabad
intends to apply /has applied to the Government of India to confer upon him all the powers under Section 164 of the
Electricity Act, 2003 for the placing of electric lines or electri cal plant for the transmission of electricity or for the
purpose of telephonic or tel egraphic communications necessary for the proper coordination of works which telegraph
authority possess under the Indian Telegraph Act. 1885 with respect to the placing o f telegraph lines and posts for the
purpose of a telegraph established or maintained, by the Government or to be so established or maintained and will
undertake the survey, construction, installation, inspection, erection and other works to be followed by
commissioning, operation, maintenance and other works for the following transmission schemes.
Sr.
No. Name & brief particulars of the Scheme Area of Work
1 Erection work of 66 KV s/C (2 Phase) line on D/C Tower with ACSR
panther conductor with GI Earth w ire-7/3.15 mm (route Length -6.656
Km) and partly laying of 66 KV 630 sq.mm (2+1) Poly Al. sheathed
XLPE U/G cable line ( route length -0.225 Km) from 66 Kv Korada
(GETCO) S/s to proposed Gorinja TSS for catering 5,000 KVA
power Demand on 66 KV system. Surround ing area Village: -Gorinja,
Tehsil: -Okhamadhi,
Dist: Devbhumi Dwarka.
The transmiss ion lines covered under the scheme will pass through, over, around, and between the following villages,
towns and cities.
Description of Location Village, Taluka & District Latitude Longitude
GETCO 66 KV Kor ada TSS Korada, Dwarka, Devbhoomi Dwarka 22° 22′ 39.53″N 69°04 ′ 48.15″ E
Gorinja TSS Gorinja, Okhamadhi, Devbhoomi Dwarka 22° 17′ 27.0″N 69° 04′ 40.2″ E
Copy of the route alignment is available in the office of the und ersigned. Notice is hereby given to the
general public to make observation/ represe ntation on the proposed transmission system within two months from the
date of publication of this notice before (date) to the office of the undersigned in writing. For furt her particulars and
clarifications please contact:
[F. No. RE/ADI/EL/TSS/Gorinja/ 164]
AMARENDRA KUMAR SINGH, Chief Project Director, Ahmedabad
Uploaded by Dte. of Printing at Government of India Pre ss, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text