**Page 1:**
REGD. No. D. L.-33004/99
The Gazette of India
EXTRAORDINARY
PART III—Section 4
PUBLISHED BY AUTHORITY
No. 156] NEW DELHI, THURSDAY, MARCH 6, 2025/PHALGUNA 15, 1946
CG-DL-E-20032025-261731
1593 GI/2025 (1)
**Page 2:**
2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Short form | Expansion
AAAC | All Aluminium Alloy Conductor
ABT | Availability Based Tariff
ACSR | Aluminium Conductor Steel Reinforced
AIS | Air Insulated Sub-station
ATC | Available Transfer Capability
BESS | Battery Energy Storage System
CAGR | Compound Annual Growth Rate
CCAI | Coal Consumers' Association of India
CEA | Central Electricity Authority
CERC | Central Electricity Regulatory Commission
CICA | Composite Insulated Cross Arm
CKM | Circuit Kilometre [Length of route (in km) x No. of circuits]
CSD | Controlled Switching Device
CSIRT | Computer Security Incident Response Team
CTU | Central Transmission Utility
DISCOM | Distribution Company
DLR | Dynamic Line Rating
EHV | Extra High Voltage
EMT | Electro Magnetic Transient
EPS | Electric Power Survey
FACTS | Flexible Alternating Current Transmission System
GDP | Gross Domestic Product
GEC | Green Energy Corridor
GIL | Gas Insulated Line
GIS | Gas Insulated Sub-station
GNA | General Network Access
GW | Giga Watt (1 Gigawatt = 1000 Megawatt)
HEP | Hydro Electric Project
HTLS | High Temperature Low Sag
HVAC | High Voltage Alternating Current
HVDC | High Voltage Direct Current
ICT | Inter-Connecting Transformer
IEEE | Institute of Electrical and Electronics Engineers
IGBT | Insulated Gate Bipolar Transistor
Intra-STS | Intra State Transmission System
IPP | Independent Power Producer
ISGS | Inter State Generating Station
ISTS | Inter State Transmission System
IWPA | Indian Wind Power Association
**Page 3:**
[PART III—SEC.4] THE GAZETTE OF INDIA : EXTRAORDINARY 3
Short form | Expansion
kV | Kilo Volt
LiDAR | Light Detection and Ranging
LILO | Line In Line Out
MNRE | Ministry of New and Renewable Energy
MoEF&CC | Ministry of Environment, Forest and Climate Change
MoP | Ministry of Power
MPLS | Multi-Protocol Label Switching
MSC | Mechanical Switched Capacitor
MSR | Mechanical Switched Reactor
MU | Million Unit (1 MU = 10^6 kWh)
MVA | Mega Volt Ampere (1 MVA = 10^6 Volt-Ampere)
MVAR | Mega Volt Ampere Reactive
MW | Mega Watt (1 Megawatt = 10^6 Watt)
NCIIPC | National Critical Information Infrastructure Protection Centre
NCT | National Committee on Transmission
NGR | Neutral Grounding Resistor
OPGW | Optical Ground Wire
OSOWOG | One Sun One World One Grid
PDH | Plesiochronous Digital Hierarchy
PLCC | Power Line Carrier Communication
PMGS-NMP | PM Gati Shakti National Master Plan
PMU | Phasor Measurement Unit
PSP | Pumped Storage Plant/Project
PSS | Power System Stabilizer
PST | Phase Shifting Transformer
RE | Renewable Energy
REZ | Renewable Energy Zone
RoW | Right of Way
RPC | Regional Power Committee
RTC | Round The Clock
RTM | Regulated Tariff Mechanism
S/C and D/C | Single Circuit and Double Circuit
S/S | Sub-station
SAARC | South Asian Association for Regional Cooperation
SC | Synchronous Condenser
SCADA | Supervisory Control and Data Acquisition
SCOD | Scheduled Commercial Operation Date
SDH | Synchronous Digital Hierarchy
SECI | Solar Energy Corporation of India
**Page 4:**
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Short form | Expansion
SERC | State Electricity Regulatory Commission
SLR | Switchable Line Reactor
SSSC | Static Synchronous Series Compensator
STATCOM | Static Compensator
STU | State Transmission Utility
SVC | Static VAR Compensator
TBCB | Tariff Based Competitive Bidding
TCSC | Thyristor Controlled Series Compensator
TOV | Temporary Over Voltage
TSP | Transmission Service Provider
TTC | Total Transfer Capability
VSC | Voltage Source Converters
Comments received on the draft National Electricity Plan-Transmission
Comment | Received from | Action taken
General Comments
1 | Prayas Energy Group | Once the generation plan is prepared, the transmission plan is prepared. The National Electricity Plan (Generation) was notified in May 2023.
It is necessary to publish the draft and final transmission plan well before the start of the plan period. For upcoming cycles, the five-year plan for generation and transmission should be notified six months to one year before the start date of the plan period. | Efforts will be made to prepare generation and transmission plans (National Electricity Plan) before the start of the plan period in the future.
2 | Prayas Energy Group | (I) Progress during 2022-23 and 2023-24 has also been included in the plan. This plan already includes a review of the growth of the transmission system during 2017-22.
(I) Interim/Progress/Achievement Report - Interim report for 2022-24 should be notified and included in the plan.
(II) Project-wise progress check - Number of projects actually completed versus number of projects envisaged to be completed during the five-year period.
(III) Reporting of projects that were given any kind of extension due to COVID-19 pandemic.
(IV) Use of transmission elements during solar generation hours, peak electricity demand, non-peak electricity demand hours etc. | (II) The targeted transmission lines and sub-stations during 2017-22, which were delayed beyond 2021-22 due to some reasons, are already included in the NEP.
(III) Projects that were given an extension due to COVID-19, they are already included in the NEP.
**Page 5:**
[PART III—SEC.4] THE GAZETTE OF INDIA : EXTRAORDINARY 5
Comment | Received from | Action taken
(V) Power factor/grid reliability improvement equipment - The impact of such equipment on grid operation and management should be reported annually.
(VI) Data reporting on various portals - PMGS-NMP should be used for route alignment of new transmission lines during the planning phase. Data should be reported on the use of NASWS portal on a quarterly/annual basis. | already included in the National Electricity Plan.
(IV) It will be very difficult to measure the use of transmission elements during different hours of the day, as it will vary throughout the year.
(V) The impact of STATCOM/SVC on the grid is already being analyzed by Grid-India.
(VI) PMGS-NMP is being used for route alignment of transmission lines during the planning phase. The use of PMGS-NMP is mandatory for preliminary survey during bidding process coordinators (BPCs) for transmission lines/sub-stations. Approximately 90 applications for prior approval under Section 68 of the Electricity Act, 2003 and for authorization under Section 164 of the Electricity Act, 2003 were processed during 2023-24.
3 | Indian Wind Power Association (IWPA) | NEP (Transmission) is not within the scope.
Reactive power compensation option can be operated through RE generators capable of generating reactive power during non-generation hours with proposed appropriate tariff compensation.
4 | IWPA | NEP (Transmission) is not within the scope.
Most hydro reservoirs should have desilting arrangements. Approximately 30% additional energy can be envisaged which can be better utilized for RE integration. | The planning of the transmission system is done to provide connectivity (in MW) to the generation developers, withdrawal of electricity by entities, system strengthening etc. Desilting will increase energy generation. Energy (MU) is not included in the transmission plan.
**Page 6:**
6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Comment | Received from | Action taken
is done.
5 | Prayas Energy Group | As per existing regulations, any generator (above a certain capacity) can demand connectivity from ISTS and cannot be denied connectivity. The suggested process is being done separately. An analysis is being done to determine whether, after the ISTS waiver is gradually phased out, wheeling electricity from RE rich states through the ISTS network would be more economical than setting up RE within the state (with low CUF of RE).
Review the impact of ISTS transmission growth or planning on ISTS RE waiver and minimum connectivity limit (50 MW): An analysis needs to be done on the impact of ISTS waiver on ISTS connectivity requirements and whether connectivity, planning and operation for some projects in the intra-state transmission system would be more optimal.
6 | Shri Shankar Sharma, Energy and Climate Policy Analyst | To meet the increasing demand for electricity, new generation stations are being planned. To evacuate electricity from generation stations to load centers, a corresponding transmission network needs to be planned. While planning and constructing transmission lines, efforts are made to ensure that lines do not pass through environmentally sensitive areas; no-go areas etc. Efforts are made to minimize encroachment in forests.
Due to a sharp increase in maximum electricity demand, transmission infrastructure is also expected to grow on a large scale by 2047. The ecological and environmental impact of this needs to be assessed.
7 | Shri Shankar Sharma | To deal with the issues of climate change, focus is being given to the development of non-fossil sources like wind, solar, hydro (dam-based and run-of-river), nuclear etc. for electricity generation. Coal-based capacity is also being increased, though at a slower pace.
Since wind and solar resources are concentrated in a few states and are far from load centers, adequate transmission infrastructure will be required to evacuate electricity from renewable energy sources.
**Page 7:**
[PART III—SEC.4] THE GAZETTE OF INDIA : EXTRAORDINARY 7
Comment | Received from | Action taken
additional transmission lines and sub-stations will not be required. In the scenario of optimal utilization of distributed renewable energy sources, many existing transmission lines may even become redundant, and they can be shut down. | Existing transmission lines will not be redundant because during the period when solar plants do not generate electricity (during night, cloudy days etc.), electricity supply will have to be done from other generation sources. In addition, electricity demand will also have to be met in winters, when hydro generation will be quite low. Wind energy is also seasonal and there are times when wind energy generation is not available or is very low.
Therefore, a mix of generation resources and associated transmission lines is necessary to ensure electricity availability as per requirement.
8 | Shri Shankar Sharma | The rooftop solar installations are expected to have a capacity of approximately 60 GW by 2032. The entire demand for electricity cannot be met by rooftop solar installations alone.
Continuously prioritizing the construction of power plants with traditional technology and associated transmission infrastructure will be completely contrary to the recent statements by the Union Minister of Power on the immense potential of renewable energy sources and the Prime Minister's announcement of a scheme to install SPV systems on rooftops of 1 crore households. | The government is committed to increasing the share of renewable energy and plans to increase the non-fossil electricity generation capacity to approximately 500 GW by 2030.
Transmission infrastructure will be required to evacuate electricity from RE parks located in RE rich states like Rajasthan, Gujarat, Karnataka, Andhra Pradesh, Tamil Nadu etc. to load centers in the country.
Emphasis is being given to meeting electricity demand in a sustainable manner.
**Page 8:**
8 THE GAZETTE OF INDIA
Here is the English text extracted from the provided PDF, verbatim and in reading order, with tables formatted as requested:
451
S. No. | Plan/Description | State | Voltage (kV) | Type of Work | No. of Circuits | ckm | MVA | Status | Date of Establishment/Anticipated Date
35 | Proposed 220 kV SS Mandadam to Proposed 220/33 kV SS Kothaluru 220 kV DC | Andhra Pradesh | 220 kV | Line | D/C | 14 | | Planned | 2031-32
36 | 220/33kV SS Kothaluru to Proposed 220/33 kV SS Kuragallu 220 kV DC Line Line | Andhra Pradesh | 220 kV | Line | D/C | 7 | | Planned | 2031-32
37 | 400 kV SS Maradam to Proposed 220 kV SS Palakonda 220 kV DC Line in Srikakulam District | Andhra Pradesh | 220 kV | Line | D/C | 79 | | Planned | 2031-32
38 | 220 kV SS Porumamilla to Proposed 220 kV SS Giddalur 220 kV DC Line in Prakasam District | Andhra Pradesh | 220 kV | Line | D/C | 120 | | Planned | 2031-32
39 | Proposed 400/220 kV SS Tallayapalem to Proposed 220/33 kV SS Venkatapalem 220 kV DC Line | Andhra Pradesh | 220 kV | Line | D/C | 6 | | Planned | 2031-32
40 | 220 kV Kundukur -220 kV Racharlapadu LILO at 220 kV Kavali SS | Andhra Pradesh | 220 kV | Line | D/C | 10 | | Planned | 2031-32
41 | Maradam-Kalpaka 400 kV DC Line LILO in Vizag | Andhra Pradesh | 400 kV | Line | D/C | 40 | | Planned | 2029-30
42 | Kalpaka to Gangavaram Port (400 kV) 400 kV Line | Andhra Pradesh | 400 kV | Line | D/C | 32 | | Planned | 2030-31
43 | Rayadurgam to Uravakonda (400 kV) 400 kV Line | Andhra Pradesh | 400 kV | Line | D/C | 102 | | Planned | 2031-32
Odisha
(a) New Sub-stations / ICT Augmentation
1 | Neulapoi 400/220/33 kV S/S | Odisha | 400/220 kV | S/S | | | 1000 | Planned | 2028-29
2 | Kolabira 765/400 kV S/S | Odisha | 765/400 kV | S/S | | | 3000 | Planned | 2028-29
3 | Duburi 765/400 kV S/S | Odisha | 765/400 kV | S/S | | | 3000 | Planned | 2028-29
(b) Transmission Line
1 | Kolabira-Jharsuguda (B) 765 kV D/C Line | Odisha | 765 kV | Line | D/C | 25 | | Planned | 2028-29
2 | Kolabira-Duburi 765 kV D/C Line | Odisha | 765 kV | Line | D/C | 400 | | Planned | 2028-29
452
S. No. | Plan/Description | State | Voltage (kV) | Type of Work | No. of Circuits | ckm | MVA | Status | Date of Establishment/Anticipated Date
3 | LILO of both circuits of Angul - Paradeep 765 kV D/C Line at Duburi | Odisha | 765 kV | Line | D/C | 280 | | Planned | 2028-29
4 | Duburi (765) - Duburi 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 20 | | Planned | 2028-29
5 | Kolabira-Shyam Steel 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 70 | | Planned | 2028-29
6 | Kolabira-OPGC (5 & 6) 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 80 | | Planned | 2028-29
7 | LILO of Angul-Jharsuguda 765 kV D/C Line at NLC | Odisha | 765 kV | Line | D/C | 300 | | Planned | 2028-29
8 | NLC-Lapanga 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 10 | | Planned | 2028-29
9 | TTPS -Meramundali (B) 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 40 | | Planned | 2028-29
10 | TTPS - Pandiabili 400 kV D/C Line | Odisha | 400 kV | Line | D/C | 240 | | Planned | 2028-29
11 | LILO of both circuits of Meramundali-B to Duburi New 400 kV DC Line at Neulapoi | Odisha | 400 kV | Line | 2xD/C | 80 | | Planned | 2028-29
12 | LILO of both circuits of Meramundali-A to Mendhasal 400 kV DC Line at Neulapoi | Odisha | 400 kV | Line | 2xD/C | 80 | | Planned | 2028-29
West Bengal
(a) New Sub-stations / ICT Augmentation
1 | Sarbari 220/132/33 | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2027-28
2 | BTPS (Bandel) 220 kV GIS | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2027-28
3 | Farakka 220 kV GIS | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
4 | NT Silicon Hub GIS 132 Upg. To 220KV | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
5 | Lalbagh GIS 220 | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
6 | C.K.Road 220 kV S/S | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
7 | Deganga 220 kV S/S | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
8 | Jagadishpur 220 kV S/S | West Bengal | 220/132 kV | S/S | | | 320 | Planned | 2028-29
9 | N. Lakshmikantapur 400 kV S/S | West Bengal | 400/220 kV | S/S | | | 630 | Planned | 2027-28
453
S. No. | Plan/Description | State | Voltage (kV) | Type of Work | No. of Circuits | ckm | MVA | Status | Date of Establishment/Anticipated Date
10 | New PPSP 400 kV S/S (132 kV System addition) | West Bengal | 400/132 kV | S/S | | | 200 | Planned | 2027-28
(b) Transmission Line
1 | LILO of one circuit of Subhasgram (PG)-Jeerat D/C at N. Laksmikantapur 400 kV | West Bengal | 400 kV | Line | S/C | 90 | | Planned | 2027-28
2 | LILO of Asansol (proposed Kuilapur)-STPS at Sarbari 220 kV D/C | West Bengal | 220 kV | Line | D/C | 12 | | Planned | 2027-28
3 | S/c LILO of Rishra-Dharampur S/C at proposed BTPS 220KV SS 220 kV | West Bengal | 220 kV | Line | S/C | 10 | | Planned | 2027-28
4 | Proposed Ashokenagar to Deganga D/C 220 kV | West Bengal | 220 kV | Line | D/C | 10 | | Planned | 2028-29
5 | New Town-IIC -Silicon Valley 220KV D/C (UG Cable) 220 kV | West Bengal | 220 kV | Line | D/C | 6 | | Planned | 2028-29
6 | Sagardighi-Lalbag 220KV D/C 220 kV | West Bengal | 220 kV | Line | D/C | 50 | | Planned | 2028-29
7 | 220KV D/C from Farakka TPS to proposed Farakka 220KV SS 220 kV | West Bengal | 220 kV | Line | D/C | 6 | | Planned | 2028-29
8 | Haldia Energy Ltd.-N. Laxmikantapur 400 kV D/c line | West Bengal | 400 kV | Line | D/C | 100.00 | | Planned | 2027-28
9 | N. Laxmikantapur-Subhasgram (PG) 400 kV D/c line | West Bengal | 400 kV | Line | D/C | 80.00 | | Planned | 2027-28
10 | N.
[भाग III-खण्ड 4] | भारत का राजपत्र : असाधारण | 901
Arunachal Pradesh | New sub-stations / ICT | (A) augmentation
1 | Kimin (Papum Pare) 132/33kV, 2x10 MVA S/s | Arunachal Pradesh | 132/33 kV | S/s | | | 20 | Planned | 2029-30
2 | Raga, (Kamle) 132/33kV,2x10MVA S/s | Arunachal Pradesh | 132/33 kV | S/s | | | 20 | Planned | 2029-30
3 | Tato (Shi Yomi), 132/33 kV, 2x10 MVA S/s | Arunachal Pradesh | 132/33 kV | S/s | | | 20 | Planned | 2029-30
(B) Transmission Lines
1 | LILO of Yupia - Gerukamukh 132 kV D/c line at Kimin S/s | Arunachal Pradesh | 132 kV | Line | D/c | 15 | | Planned | 2029-30
2 | LILO of Ziro-Daporijo 132 kV S/c line at Raga (Kamle)( HTLS 1000A) | Arunachal Pradesh | 132 kV | Line | D/c | 13 | | Planned | 2029-30
3 | LILO of Kambang- Mechuka 132 kV S/c line at Tato (Shi Yomi). | Arunachal Pradesh | 132 kV | Line | D/c | 5 | | Planned | 2029-30
4 | Likabali-Basar 132kV S/c line | Arunachal Pradesh | 132 kV | Line | S/c | 80 | | Planned | 2029-30
5 | 2nd Circuit stringing of Gerukamukh-Likabali 132kV line | Arunachal Pradesh | 132 kV | Line | S/c | 60 | | Planned | 2029-30
6 | 2nd Circuit stringing of Likabali-Niglok 132kV line | Arunachal Pradesh | 132 kV | Line | S/c | 25.6 | | Planned | 2029-30
7 | 2nd Circuit stringing of Niglok- Pasighat 132kV line | Arunachal Pradesh | 132 kV | Line | S/c | 9.3 | | Planned | 2029-30
Manipur | New sub-stations / ICT | (A) augmentation
1 | Awang Potsangbam 132/33 kV, 2x 50 MVA S/s | Manipur | 132/33 kV | S/s | | | 100 | Planned | 2029-30
2 | Namrei 132/33 kV 2x25 MVA S/s | Manipur | 132/33 kV | S/s | | | 50 | Planned | 2029-30
(B) Transmission Lines
1 | Tamenglong-Karong 132 kV S/c line | Manipur | 132 kV | Line | S/c | 70 | | Planned | 2029-30
2 | Rengpang-Khoupum 132 kV S/c line | Manipur | 132 kV | Line | S/c | 10 | | Planned | 2029-30
3 | Hundung-Kamjong 132 kV S/c line | Manipur | 132 kV | Line | S/c | 55 | | Planned | 2029-30
4 | Karong-Maram 132 kV S/c line | Manipur | 132 kV | Line | S/c | 4 | | Planned | 2029-30
5 | LILO of Yurembam- Yaingangpokpi 132 kV D/c line at Awang Potsangbam | Manipur | 132 kV | Line | D/c | 10 | | Planned | 2029-30
6 | Hundung to Namrei 132kV D/c line | Manipur | 132 kV | Line | D/c | 10 | | Planned | 2029-30
Nagaland | New sub-stations / ICT | (A) augmentation
1 | Mon 132/33 kV, 2x25MVA S/s | Nagaland | 132/33 kV | S/s | | | 50 | Planned | 2029-30
2 | Tuli 132/33 kV, 2x50MVA S/s | Nagaland | 132/33 kV | S/s | | | 100 | Planned | 2029-30
902 | THE GAZETTE OF INDIA: EXTRAORDINARY | [PART III-SEC.4]
3 | Naginimora 132/33kV, 2x10MVA S/s | Nagaland | 132/33 kV | S/s | | | 20 | Planned | 2029-30
4 | Tizit 132/33kV, 2x10MVA S/s | Nagaland | 132/33 kV | S/s | | | 20 | Planned | 2029-30
5 | Niuland 132/33 kV, 2x25MVA S/s | Nagaland | 132/33 kV | S/s | | | 50 | Planned | 2029-30
6 | Champang 132/33kV, 2x10MVA S/s | Nagaland | 132/33 kV | S/s | | | 20 | Planned | 2029-30
7 | Old TPS 7th Mile Dimapur 132/33 kV, 2x50MVA S/s | Nagaland | 132/33 kV | S/s | | | 100 | Planned | 2029-30
(B) Transmission Lines
1 | Longleng to Mon 132kV S/c Line on D/C tower | Nagaland | 132 kV | Line | D/c | 44 | | Planned | 2029-30
2 | Mokokchung PG SS to Tuli132kV D/c line | Nagaland | 132 kV | Line | D/c | 112 | | Planned | 2029-30
3 | Tuli to Naginimora 132kV S/c line on D/c tower. | Nagaland | 132 kV | Line | S/c | 34 | | Planned | 2029-30
4 | Longleng to Tuli 132kV S/c line on D/c tower | Nagaland | 132 kV | Line | S/c | 50 | | Planned | 2029-30
5 | Naginimora to Tizit 132kV S/c line on D/c tower | Nagaland | 132 kV | Line | S/c | 44 | | Planned | 2029-30
6 | Tizit to Mon 132kV S/c line on D/c tower | Nagaland | 132 kV | Line | S/c | 30 | | Planned | 2029-30
7 | Zhadima to Niuland 132kV D/c line (Zebra conductor ) | Nagaland | 132 kV | Line | D/c | 54 | | Planned | 2029-30
8 | Niuland - Champhang 132kV S/c line | Nagaland | 132 kV | Line | S/c | 50 | | Planned | 2029-30
9 | Niuland to Champang 132kV S/c line on D/c tower | Nagaland | 132 kV | Line | S/c | 25 | | Planned | 2029-30
10 | Champang to Longnak 132kV S/c line on D/c tower | Nagaland | 132 kV | Line | S/c | 64 | | Planned | 2029-30
11 | Tsitrongse to Old TPS 7th Mile Dimapur132kV D/c line | Nagaland | 132 kV | Line | D/c | 26 | | Planned | 2029-30
Meghalaya | New sub-stations / ICT | (A) augmentation
1 | Pongtung 132/33 kV S/s | Meghalaya | 132/33 kV | S/s | | | 50 | Planned | 2027-28
2 | Nongpoh 132/33 kV S/s | Meghalaya | 132/33 kV | S/s | | | 50 | Planned | 2027-28
3 | Baghmara 132/33 kV S/s | Meghalaya | 132/33 kV | S/s | | | 50 | Planned | 2027-28
4 | Killing 132/33 kV S/s | Meghalaya | 132/33 kV | S/s | | | 40 | Planned | 2027-28
5 | Mawkhanu 132/33 kV S/s | Meghalaya | 132/33 kV | S/s | | | 50 | Planned | 2027-28
(B) Transmission Lines
1 | MLHEP II-New Shillong 220 kV D/C line | Meghalaya | 220 kV | Line | D/c | 160 | | Planned | 2029-30
2 | Sohra-Pongtung 132 kV D/c line | Meghalaya | 132 kV | Line | D/c | 60 | | Planned | 2027-28
3 | LILO of Umiam Stage-III P/S - Umtru P/S 132 kV D/c line at Nongpoh | Meghalaya | 132 kV | Line | D/c | 20 | | Planned | 2027-28
4 | Killing-Killing (New) 132 KV D/c line | Meghalaya | 132 kV | Line | D/c | 10 | | Planned | 2029-30
[भाग III-खण्ड 4] | भारत का राजपत्र : असाधारण | 903
5 | New Shillong-Mawkhanu D/C line | Meghalaya | 220 kV | Line | D/c | 40 | | Planned | 2029-30
6 | Nangalbibra-Baghmara 132 kV D/c line | Meghalaya | 132 kV | Line | D/c | 120 | | Planned | 2027-28
Tripura | New sub-stations / ICT | (A) augmentation
1 | Badharghat GIS S/S, 132/33 kV, 2x80 MVA S/s | Tripura | 132/33 kV | S/s | | | 160 | Planned | 2029-30
2 | Ompi AIS S/s, 132/33 kV, 2x25 MVA S/s | Tripura | 132/33 kV | S/s | | | 50 | Planned | 2029-30
3 | Jatanbari S/s, 132/33 kV, 2x25 MVA S/s | Tripura | 132/33 kV | S/s | | | 50 | Planned | 2029-30
4 | Boxanagar S/s, 132/33 kV 2x25 MVA S/s | Tripura | 132/33 kV | S/s | | | 50 | Planned | 2029-30
5 | Aralia GIS S/s, 132/33 kV 2x80 MVA S/s | Tripura | 132/33 kV | S/s | | | 160 | Planned | 2029-30
(B) Transmission Lines
1 | LILO of both circuit of 79 Tilla Grid-Rokhia 132 kV D/c line at Badharghat (HTLS) | Tripura | 132 kV | Line | D/c | 10 | | Planned | 2029-30
2 | Surajmaninagar (ISTS) Badharghat 132kV D/c line | Tripura | 132 kV | Line | D/c | 30 | | Planned | 2029-30
3 | Gamaitilla Ompi (ACSR Panther) 132 kV S/c on D/c line with associated bays | Tripura | 132 kV | Line | S/c | 22 | | Planned | 2029-30
4 | Ompi Amarpur (ACSR Panther) 132 kV S/c on D/c line with associated bays | Tripura | 132 kV | Line | S/c | 21 | | Planned | 2029-30
5 | Amarpur Jatanbari (ACSR Panther) 132 kV D/c line with associated bays | Tripura | 132 kV | Line | D/c | 40 | | Planned | 2029-30
6 | LILO of both circuit of Rokhia- Rabindranagar 132 kV D/c line at Boxanagar (ACSR Panther) | Tripura | 132 kV | Line | D/c | 30 | | Planned | 2029-30
7 | Palatana - Udaipur 132 kV 2nd S/c line (HTLS) with associated bays | Tripura | 132 kV | Line | S/c | 12 | | Planned | 2029-30
8 | LILO of 2nd circuit of Surajmaninagar (TSECL)- Bodhjungnagar 132 kV D/c line with HTLS at Surajmaninagar (ISTS) 400/132 kV S/s | Tripura | 132 kV | Line | D/c | 14 | | Planned | 2029-30
9 | LILO of both circuit of 79 Tilla Grid-Surjamaninagar 132 kV D/c line (HTLS) at Aralia | Tripura | 132 kV | Line | D/c | 8 | | Planned | 2029-30
Note: Some states have planned only sub-stations and associated transmission lines are being planned.
904 | THE GAZETTE OF INDIA: EXTRAORDINARY | [PART III-SEC.4]
Annex-8.4
Transmission system associated with Thermal Power Projects planned during 2027-32
1 | Singrauli STPP- III | Central | NTPC | 1600 (2x800) | Uttar Pradesh | Pit Head | (i)LILO of both circuits of (Vindhyachal Stage-IV to Vindhyachal Stage-V 400 kV D/C line at Singrauli Stage-III (ii) Reconductoring of Singrauli Stage-III - Vindhyachal stage-IV 400 kV D/c line (formed after above proposed LILO) with HTLS conductor (iii) Singrauli-III–Rihand-III 400 kV D/c line
2 | Meja-II | Central | NTPC-UP- JV | 2400 (3x800) | Uttar Pradesh | Non Pithead | (i)Establishment of 2x1500 MVA +2x 500 MVA 76