Appoints PFCCL as Bid-Process Coordinator for transmission schemes related to capacity augmentation at Mandsaur Substation for renewable energy interconnection.

Detailed Summary

The Central Electricity Authority (CEA), under the Electricity Act, 2003, and directives from the Ministry of Power and the National Committee on Transmission (NCT), appoints Power Finance Corporation Consulting Limited (PFCCL) as the Bid-Process Coordinator (BPC) for specified transmission schemes. These schemes aim to augment transformation capacity and implement line bays at the Mandsaur Substation for Renewable Energy (RE) interconnection. The nine schemes include creation of new bus sections, augmentation of transformation capacity with ICTs, and installation of line bays for interconnections of projects by Waaree Renewable Technologies Ltd., NTPC Renewable Energy Ltd., JSP Green Pvt. Ltd., and TEQ Green Power XXII Pvt. Ltd. at Mandsaur PS. Implementation timelines vary between March 2027 and March 2028, linked to the SCOD of the Mandsaur – Khandwa 765 kV D/c line.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-04032025-261463 EXTRAORDINARY PART III-Section 4 PUBLISHED BY AUTHORITY No. 153] NEW DELHI, TUESDAY, MARCH 4, 2025/PHALGUNA 13, 1946 CENTRAL ELECTRICITY AUTHORITY NOTIFICATION New Delhi, the 4th February, 2025 F. No. CEA-PS-12-13/3/2022-PSPA-II Division. -Transmission Services framed under Section 63 of the Electricity Act, 2003 (no. 36 of 2003) and Ministry of Power office order dated 28.10.2021, National Committee on Transmission (NCT) headed by Chairperson, Central Electricity Authority hereby appoints the following Bid-Process Coordinator (BPC) for the Transmission Schemes, as shown against the name of the Transmission schemes: +-----+-----------------------------------+-----------------------------------------------------+----------------+ | Sr. | Name of Scheme | Broad Scope* of the transmission scheme and Tentative | Bid Process | | No. | | Implementation timeframe | Coordinator | +=====+===================================+=====================================================+================+ | 1 | Augmentation of | 1. Creation of New 400 kV & 765kV Bus Section-II | PFCCL | | | transformation capacity & | through Sectionalizer arrangement | | | | Implementation of line | 2. Augmentation of Transformation capacity by 1x1500| | | | bays at Mandsaur S/s for | MVA, 765/400 kV ICT (4th) (Terminated at 400 kV & | | | | RE Interconnection | 765 kV Bus Section-II) | | | | | 3. Augmentation of Transformation capacity by 1x500 | | | | | MVA, 400/220 kV ICT (6th) (Terminated on 400 kV | | | | | Bus Section-I & 220 kV Bus Section-II) | | | | | 4. 1 No. 220 kV line bay (on 220 kV Bus Sec-II) at | | | | | Mandsaur PS for interconnection of Solar project of| | | | | Waaree Renewable Technologies Ltd. (WRTL) | | | | | (2200001192) (300 MW) | | | | | 5. 1 No. 400 kV line bay at Mandsaur PS (on 400 kV Bus | | | | | Sec-II) for interconnection of Solar project of NTPC| | | | | Renewable Energy Ltd. (NTPCREL) (2200001301) (300 | | | | | MW) | | | | | 6. Augmentation of Transformation capacity by 1x500 | | | | | MVA, 400/220 kV ICT (7th) (Terminated on 400 kV | | | | | Bus Section-II & 220 kV Bus Section-III) at Mandsaur| | | | | PS | | | | | 7. Creation of New 220 kV Bus Section-3 with | | | | | Sectionaliser arrangement at Mandsaur PS | | | | | 8. 1 No. 220 kV line bay at Mandsaur PS (220 kV New | | | | | Bus Section-3) for interconnection of wind project of| | | | | JSP Green Pvt. Ltd. (JSPGPL) (2200001356) (350 MW)| | | | | 9. 1 No. 220 kV line bay at Mandsaur PS (220 kV New | | | | | Bus Section-3) for interconnection of Hybrid project of| | | | | TEQ Green Power XXII Pvt. Ltd. (TGP XXII PL) | | | | | (2200001431) (250 MW) | | | | | Implementation time frame: | | | | | • Scope at Sl. 1, 2, 3, 4 & 6: Matching with SCOD of| | | | | Mandsaur – Khandwa 765 kV D/c line being implemented| | | | | under Transmission system for Common Evacuation of| | | | | Power from Sirohi PS (2 GW) & Merta-II PS (2 GW),| | | | | which is currently under tendering stage subject to| | | | | minimum schedule of 18 months. | | | | | • Scope at Sl. 5: 31.03.2027 or Matching with SCOD of| | | | | Mandsaur - Khandwa 765 kV D/c line, whichever is later| | | | | subject to minimum schedule of 18 months | | | | | • Scope at Sl. 7 & 8: 15.06.2027 or Matching with SCOD| | | | | of Mandsaur – Khandwa 765 kV D/c line, whichever is| | | | | later (subject to minimum schedule of 18 months) | | | | | • Scope at Sl. 9: 30.03.2028 | | +-----+-----------------------------------+-----------------------------------------------------+----------------+ *Detailed scope may be seen in the minutes of the 26th meeting of the National Committee on Transmission and subsequent amendments, available at: https://cea.nic.in/wp-content/uploads/comm_transmission/2025/01/MoM_26th_NCT.pdf The appointment of the Bid-Process Coordinators is subject to the conditions laid down in the Guidelines. RAKESH KUMAR, Secy. [ADVT.-III/4/Exty./1011/2024-25]

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free