Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-31082026-275862
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4606]
NEW DELHI, SATURDAY, AUGUST 29, 2026/BHADRA 7, 1948
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 28th August, 2026
S.O. 4793(E).- Whereas, by notifications of the Government of India in the Ministry of Road
Transport and Highways number S.O.1192 (E), dated the 3rd December,2001 and in the erstwhile Ministry
of Shipping, Road Transport and Highways (Department of Road Transport and Highways), number S.O.
465(E), dated the 26th April, 2002, issued under section 11 of the National Highways Authority of India Act,
1988 (68 of 1988), the Central Government has entrusted the stretches from Km 248.165 to 259.230
(Namakkal Bypass), Km 292.400 to Km 306.400 (Karur Bypass and Km 259.230 to Km 292.400 (Salem
Madurai section), of National Highway old No.7 (New NH-44) in the state of Tamil Nadu, to the National
Highways Authority of India hereinafter referred to as the Authority):
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956
(48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules,
2008 (hereinafter referred to as the "rules"), and in supersession of the notification of the Government of
India in the Ministry of Road Transport and Highways number S.O.1180 (E) dated 08.05.2009, the Central
Government, hereby levies the fee at the rate specified in column (2) of the Table 1 for net road section length
of 37.369 kms[Table 2] and for equivalent structure length (having more than 60m) of 10.300 Km (having
length of 1.030 Km [Table 4]) and at one and half times the base rate for bypasses having length of 2.971
kms [Table 3] costing rupees 10 cr or more on the type of vehicles specified in column (1) of the Table 1
below for the use of four lane of Namakkal – Karur section from Km 248.625 to 292.600 of new National
Highway no.44 in the State of Tamil Nadu and authorize the Authority to collect toll fee either through its
officials or through an agency, the said fee, namely:-
Table-1
+-----------------------------------+---------------------------------------------------+
| Type of Vehicle | Base rate of fee per km for the base year 2007-08 |
| | (in Rupees) |
+===================================+===================================================+
| (1) | (2) |
+-----------------------------------+---------------------------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-----------------------------------+---------------------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini | 1.05 |
| Bus | |
+-----------------------------------+---------------------------------------------------+
| Bus or Truck (Two axles) | 2.20 |
+-----------------------------------+---------------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-----------------------------------+---------------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving | 3.45 |
| Equipment (EME) or Multi Axle Vehicle (MAV) (four to | |
| six axles) | |
+-----------------------------------+---------------------------------------------------+
| Over Sized Vehicles (seven or more axles) | 4.20 |
+-----------------------------------+---------------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road
length specified for such Fee Plaza(s) namely;
Table-2
+-------------------------------------------------------------+-----------------------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+
| Location of Fee Plaza (chainage) | Length in km for which Fee is payable | Rate at which fee is payable |
+=============================================================+=================================================================================================================+=====================================================================================+
| At Km 259+500, Rasampalayam Village, Namakkal District in the state of Tamil Nadu | 37.369 kms [Excluding length of bypasses (costing ≥Rs. 10 cr.) and structures length(>60 m)] | 100% for four or more lane, of the base rates mentioned in Table-1 above. |
+-------------------------------------------------------------+-----------------------------------------------------------------------------------------------------------------+-------------------------------------------------------------------------------------+
2. In addition to above, the following fee shall be due and payable for the use of the bypass costing Rs
10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s) :-
Table -3
+-----------------------------------+----------------+-----------+-----------+-----------------------------------------------------------------------------------+-------------------------+
| Location of Fee Plaza (Chainage) | Name of the Bypass | Taking Off | Merging at | Length and Cost of bypass for which additional fee is payable (Excluding length of structure > 60m length) | Rate at which fee is payable |
+===================================+================+===========+===========+===================================================================================+=========================+
| | | | | Length (in Km) | Cost (In Rs.) |
+-----------------------------------+----------------+-----------+-----------+-----------------------------------------------------------------------------------+-------------------------+
| At Km 259+500 at Rasampalayam Village of Namakkal District in the state of Tamil Nadu | Vellur Bypass | 274+850 | 278+625 | 2.971 | >10 Cr. |
+-----------------------------------+----------------+-----------+-----------+-----------------------------------------------------------------------------------+-------------------------+
| | Total length | | | 2.971 | |
+-----------------------------------+----------------+-----------+-----------+-----------------------------------------------------------------------------------+-------------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following
structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures
into an equivalent length of highway by multiplying the length of such structures by an equalization factor
of 10: -
Table- 4
+-----------------------------------+---------------------------------------------------+-------------------------+-------------------------+
| Location of Fee Plaza (Chainage) | Length of structures (in km) to be converted into equivalent road length | Equivalent road length (in km) | Rate at which fee is payable |
+===================================+===================================================+=========================+=========================+
| Located at Km 259+500 at Rasampalayam Village of Namakkal District in the state of Tamil Nadu | 1.030^ | 10.300 | 100% for four or more lane, of the base rate mentioned in Table-1 above |
+-----------------------------------+---------------------------------------------------+-------------------------+-------------------------+
^The details are as under: -
+-------+-----------+--------+--------------------------+---------------------+
| Sl. No. | Chainage (Km) | Type of Structure (4 Lane) | Length (in km) |
+=======+===========+========+==========================+=====================+
| | From | To | | |
+-------+-----------+--------+--------------------------+---------------------+
| 1 | 249.063 | 249.138| Flyover | 0.075 |
+-------+-----------+--------+--------------------------+---------------------+
| 2 | 257.163 | 257.238| Flyover | 0.075 |
+-------+-----------+--------+--------------------------+---------------------+
| 3 | 268.852 | 268.928| Major Bridge | 0.076 |
+-------+-----------+--------+--------------------------+---------------------+
| 4 | 276.498 | 277.302| Major Bridge | 0.804 |
+-------+-----------+--------+--------------------------+---------------------+
| | Total | | | 1.030 |
+-------+-----------+--------+--------------------------+---------------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial
purposes and resides within a distance of twenty kilometers from the toll plaza is Rs.360./- (Rupees Three
Hundred and Sixty Only) for the FY 2026-27 which is subject to revision every year as per the provisions of
the said rules.
5. For multiple journey on the highway section, passes shall be issued at the following rates namely:
Table 5
+---------------------------------------------------+-------------------------------------+---------------------------------------------+
| Amount Payable | Maximum number of one way journeys allowed | Period of validity |
+===================================================+=====================================+=============================================+
| One and half times of the fee for one way journey | Two | Twenty four hours from the time of payment |
+---------------------------------------------------+-------------------------------------+---------------------------------------------+
| Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment |
+---------------------------------------------------+-------------------------------------+---------------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the
district where the fee plaza shall be 50% of the specified rate for that category of vehicle provided no service
road or alternate road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of
permissible load specified for its category, shall be liable to pay fee for entering the over loaded vehicle on
the National Highway to the fee collecting agency, equal to the fee specified in rule 10 of the said rules.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the said Rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said
Rules.
10. Based on the Base rate of fee per km for the base year 2007-08 as mentioned in Table-1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the
Authority on the basis of the completed length of the section and revised annually in accordance with the
rule 5 of the said rules and the same shall be published in at least one newspapers in English and vernacular
language.
11. The estimated capital cost of the project length is Rupees 482.59 Crores. The Authority shall maintain
a record of the recovery of capital cost through user fee realised.
[F. No. PROJ-16017(43)/3/2026-PIUSalem/E-269848]
CHETNA NAND SINGH, Jt. Secy.
Login to read full text