Full Text
5555 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 3381 ] NEW DELHI, FRIDAY , AUGUST 30, 2024 /BHADRA 8, 194 6
CG-DL-E-31082024-256801
(1) (2)
60%
100%
60%
100%
60%
100%
40+900 पर
49.250
58.460
15.64
102+151 पर
117.740
123.550 5.449
0.361
44.00
0.361
[फा. सं. 141223/ई -237939 ]
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 30th August , 2024
S.O. 3711 (E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 3254(E) dated 5th July 2018 and S.O. 4132(E) dated 17th November 2020 issued under section
11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the
stretch Tanot -Ramgarh -Bhadasar -Jaisalmer section of NH -68 & Mokal -Sarkaritala section of NH -968 respectively in
the State of Rajasthan to the National Highways Authority of India (hereinafter referred to as the “Authority”);
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the “said Rules”), the Central Government hereby levies the fee at 60% of the base rate
specified in column (2) of Table 1 (hereinafter referred to as “base rate”) for net road section length of 166.657 Km.
and at 90% of the base rate for bypasses having length of 9.210 Km. costing rupees ten crores or more for use of two
lane with paved shoulders section; and at 100% of the base rate for net road section length of 11.846 K m. and for
equivalent structure length (having length more than 60m) of 3.610 Km. (having length of 0.361 Km .) and at 150% of
the base rate for bypasses having length 5.449 K m. length costing rupees ten crore or more for the use of four lane or
more lane section, on the type of vehicle specified in column (1) of Table 1, of Tanot -Jaisalmer section from km 0 .000
to Km. 125.573 section of NH -68 & Moka l-Sarkaritala from Km. 0.000 to K m. 67.950 section of NH -968 in the State
of Rajasthan and authorises the Authority to collect, either through its officials or through a co ntractor, the said fee,
namely: —
Table 1
Type of vehicle Base rate of fee per km for the
base year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or
Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee levied and collected hereunder shall be due and payable at the following Fee Plaza(s) for net road length
specified for such Fee Plaza(s):
Table -2
Location of Fee Plaza (chainage) Length (in km .) for
which Fee is
payable Rate at which fee is payable
At km 40.900 of NH68 (design chainage)
near village Ramgarh, Tehsil Ramgarh in
Jaisalmer district of Rajasthan State. 52.841 km . 60% for two lane with paved shoulders, of the base
rates mentioned in Table -1 above
2.949 km . 100% for four or more lane, of the base rates
mentioned in Table -1 above
At km . 102.151 of NH68 (design chainage)
near village Lanela, Tehsil Jaisalmer in
Jaisalmer district of Rajasthan State. 46.316 km . 60% for two lane with paved shoulders, of the base
rates mentioned in Table -1 above
8.447 km . 100% for four or more lane, of the base rates
mentioned in Table -1 above
At km . 19.900 of NH968 (design chainage)
near village Parewar Tehsil Jaisalmer in
Jaisalmer district of Rajasthan State. 67. 500 km . 60% for two lane with paved shoulders, of the base
rates mentioned in Table -1 above
0.450 Km . 100% or four or more lane, of the base rates
mentioned in Table -1 above
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing rupees ten
crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza: —
Table -3
Location of Fee Plaza
(Chainage) Name of the
Bypass Taking
Off Merging at Length and cost of bypass for
which additional fee is
payable Rate at which fee
is payable
Length
(in Km .) Cost (in Rs.
Crore)
At km 40+900 of NH68
(design chainage) near
village Ramgarh, Tehsil
Ramgarh in Jaisalmer
district of Rajasthan
State. Ramgarh
Bypass of
NH68
Design
Km.
49.250 Design
Km.58.460 9.21 Km . 15.64 Cr. 90% for two lane
with paved
shoulders, of the
base rates
mentioned in Table -
1 above
At km . 102+151 of
NH68 (design chainage)
near village Lanela,
Tehsil Jaisalmer in
Jaisalmer district of
Rajasthan State. Jaisalmer
bypass of
NH68
Design
Km.
117.740 Design Km .
123.550 5.449 Km .
(excluding 0.361
Km. length of
structure falling
therein). 44.00 Cr. 150% for four or
more lane, of the
base rates
mentioned in Table -
1 above
3. In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60m at the following fee Plaza(s), by length of structures into an equivalent length of highway by
multiplying the length of such structures by an equalisation factor of 10: —
Table -4
Location of Fee Plaza (Chainage) Length of Structures^ (in
Km.) to be converted into
equivalent road length Equivalent
road length (in
Km.) Rate at which fee is
payable
At km . 102+151 of NH68 (design
chainage) near village Lanela, Tehsil
Jaisalmer in Jaisalmer district of
Rajasthan State. 0.361 3.61 100% for four or more lane,
of the base rates mentioned
in Table -1 above
^The details are as under: —
Chainage Type of structure Length (in km .)
From Km . To Km .
1 122.097 122.458 4 lane ROB 0.361 Km.
Total 0.361 Km.
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial purposes and
resides within a distance of twenty kilometres from the fee plaza is Rs. 340.00 (Rupees Three Hundred Forty only) for
the year 2024 -25 and is subject to revision every year as per the provisions of the National Highways Fee
(Determination of Rates and Collection) Rules, 2008.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
Table -5
Amount Payable Maximum number of one -way
journeys allowed Period of validity
One and half times of the fee for one way
journey Two Twenty -four hours from the time of
payment
Two-third of amount of the fee payable for
fifty single journeys Fifty One month from date of payment
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the
fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road etc. shall be as per definitions specified in the rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules.
10. Based on the Base rate of fee per km for the base year 2007 -08 as mentioned in Table -1 above, the actual amount
of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of
the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same
shall be published in at least one newspaper, each in English and vernacular language accordingly.
11. The estimated capital cost of the project is Rupees 884.07 Crore. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, Annuity Payments etc. are yet to be completed. The
Authority shall maintain a record of the recovery of capital cost through user fee realised.
[F. No. 141223/E -237939 ]
SUMAN PRASAD SINGH, Jt. Secy .
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text