Notification by the Ministry of Road Transport and Highways levying user fees under Section 7 of the National Highways Act, 1956 for the four-laned Unnao to Lalganj section of National Highway 31 (Old NH-232A) in Uttar Pradesh.

Detailed Summary

By S.O. 355(E) dated 19th January, 2024, referencing S.O. 2429(E) dated 1st August, 2017 (issued under Section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), entrusting the entire NH-232A in Uttar Pradesh to the National Highways Authority of India), the Ministry of Road Transport and Highways, exercising powers under section 7 of the National Highways Act, 1956 (48 of 1956) read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, levied a toll fee for the four-or-more-lane Unnao to Lalganj section (Design Km 1.000 to Km 70.000, existing Km -0.550 to Km 65.173) of National Highway No. 31 (Old NH-232A), covering a net road length of 46.656 km, equivalent structure length of 4.320 km, and bypass length of 21.912 km costing Rs. 10 crore or more (charged at one-and-a-half times the base rate), and authorised the National Highways Authority of India to collect the fee directly or through a contractor; base-year (2007-08) per-km rates are Rs. 0.65 for Car/Jeep/Van/Light Motor Vehicle, Rs. 1.05 for Light Commercial/Goods Vehicle or Mini Bus, Rs. 2.20 for Bus/Truck (two axles), Rs. 2.40 for three-axle commercial vehicles, Rs. 3.45 for Heavy Construction Machinery/Earth Moving Equipment/Multi Axle Vehicles (four to six axles), and Rs. 4.20 for oversized vehicles (seven or more axles); the fee for the 46.656 km net length is collected at the Fee Plaza at Design km 33.350, Akwabad Village, Unnao district, at 100% of the base rate, while additional bypass fees at 150% of the base rate are payable at the same plaza for the Achalganj and Bethar Bypass (8.328 km, cost Rs. 143.10 crore), Railway Line Bypass (2.450 km, Rs. 31.32 crore), Bihar Bypass (2.500 km, Rs. 41.80 crore), Nihastha Bypass (1.000 km, Rs. 21.77 crore) and Lalganj Bypass (7.634 km, Rs. 151.09 crore); structures longer than 60 metres are converted to an equivalent road length using an equalisation factor of 10 for additional fee calculation.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-30012024-251641 EXTRAORDINARY PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY No. 334] NEW DELHI, MONDAY, JANUARY 29, 2024/MAGHA 9, 1945 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 19th January, 2024 S.O. 355(E).-Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 2429(E) dated the 01st August 2017 issued under Section 11 of the National Highway Authority of India Act 1988 (68 to 1988), the Central Government has entrusted entire National Highway No. 232A in the state of Uttar Pradesh to the National Highways Authority of India (hereinafter referred to as the "Authority"); Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules"), the Central Government hereby levies the fee at the rate specified in column (2) of the Table 1 for net road section length of 46.656 km and for equivalent structure length (having length more than 60m) of 4.320 km (having length of 0.432 km) and at one and one half times of the base rate for bypasses having length of 21.912 km costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for the use of four or more lane of Unnao to Lalganj section from design kilometer 1.000 to kilometer 70.000 (existing Km. -0.550 to Km. 65.173) of National Highway number 31 (Old NH -232A) in the State of Uttar Pradesh and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table-1 +-------------------------------------------------------------+-----------------------------------------------------+ | Type of vehicle | Base rate of fee per km for the | | | base year 2007-08 (in Rupees) | +=============================================================+=====================================================+ | (1) | (2) | +-------------------------------------------------------------+-----------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | +-------------------------------------------------------------+-----------------------------------------------------+ | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | +-------------------------------------------------------------+-----------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +-------------------------------------------------------------+-----------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +-------------------------------------------------------------+-----------------------------------------------------+ | Heavy Construction Machinery (HCM) or Earth Moving | 3.45 | | Equipment (EME) or Multi Axle Vehicle (MAV) | | | (four to six axles) | | +-------------------------------------------------------------+-----------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------+-----------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza namely: - Table-2 +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ | Location of Fee Plaza | Length (in km) for which Fee is payable | Rate at which fee is payable | | (chainage) | | | +=====================================================+=====================================================+=====================================================+ | At Design | 46.656 | 100% for four or more lane, of the base | | km 33.350 at | [Excluding length of Bypass (costing >10 | rates mentioned in Table-1 above | | Akwabad Village | Cr.) and length of structures (>60m)] | | | of Unnao District in | | | | Uttar Pradesh State. | | | +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza: - Table-3 +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ | Location of Fee | Name of the | Taking Off | Merging at | Length and Cost of | Rate at which fee is | | | Plaza (chainage) | Bypass | | | bypass for which | payable | | | | | | | additional fee is | | | | | | | | payable | | | | | | | | | Cost | | | | | | | Length | (in Rs. | | | | | | | (in Km.) | Crore) | | +===========================================+================================+============+============+=======================+=======================+=======================+ | At Design | Achalganj and | Design km | Design | 8.328 | 143.10 | 150% for four and | | km 33.350 at | Bethar | 8.200 | km | | | more lane, of the base| | Akwabad Village | Bypass | (existing | 16.600 | | | rates mentioned in | | of Unnao District in | | km | (existing | | | Table-1 above | | Uttar Pradesh State. | | 7.650) | km | | | | | | | | 14.630) | | | | +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ | | Railway Line | Design km | Design | 2.450 | 31.32 | 150% for four and | | | Bypass | 39.000 | km | | | more lane, of the base| | | | (existing | 41.450 | | | rates mentioned in | | | | km | (existing | | | Table-1 above | | | | 36.800) | km | | | | | | | | 39.050) | | | | +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ | | Bihar | Design km | Design | 2.500 | 41.80 | 150% for four and | | | Bypass | 47.250 | km | | | more lane, of the base| | | | (existing | 49.750 | | | rates mentioned in | | | | km | (existing | | | Table-1 above | | | | 44.850) | km | | | | | | | | 47.105) | | | | +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ | | Nihastha | Design km | Design | 1.000 | 21.77 | 150% for four and | | | Bypass | 58.700 | km | | | more lane, of the base| | | | (existing | 59.700 | | | rates mentioned in | | | | km | (existing | | | Table-1 above | | | | 56.050) | km | | | | | | | | 56.990) | | | | +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ | | Lalganj | Design km | Design | 7.634 | 151.09 | 150% for four and | | | Bypass | 62.150 | km | | | more lane, of the base| | | | (existing | 70.000 | | | rates mentioned in | | | | km | (existing | | | Table-1 above | | | | 59.570) | km | | | | | | | | Meet at NH- | | | | | | | | 232) | | | | +-------------------------------------------+--------------------------------+------------+------------+-----------------------+-----------------------+-----------------------+ 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table-4 +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ | Location of Fee Plaza (chainage) | Length of structures^ (in km) | Equivalent | | | to be converted into | road length (in | | | equivalent road length | km) | +=====================================================+=====================================================+=====================================================+ | At Design | 0.432^ | 4.320 | | km 33.350 at | | | | Akwabad Village | | | | of Unnao District in | | | | Uttar Pradesh State. | | | +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ ^The detail is as under: +-----+-----------+-----------+-------------------+-----------------+ | | From Km | To Km | Type of Structure | Length (in km) | +=====+===========+===========+===================+=================+ | 1 | 69.074 | 69.218 | Interchange | 0.144 | +-----+-----------+-----------+-------------------+-----------------+ | 2 | 9.668 | 9.740 | VUP | 0.072 | +-----+-----------+-----------+-------------------+-----------------+ | 3 | 26.016 | 26.088 | VUP | 0.072 | +-----+-----------+-----------+-------------------+-----------------+ | 4 | 54.012 | 54.084 | VUP | 0.072 | +-----+-----------+-----------+-------------------+-----------------+ | 5 | 62.464 | 62.536 | VUP | 0.072 | +-----+-----------+-----------+-------------------+-----------------+ | | Total | | | 0.432 | +-----+-----------+-----------+-------------------+-----------------+ 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs 330.000 (Three Hundred and Thirty Only) for the year 2023-24 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table-5 +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ | Amount Payable | Maximum number of | Period of validity | | | one way journeys | | | | allowed | | +=====================================================+=====================================================+=====================================================+ | One and one-half times of the fee for one | Two | Twenty four hours from the time of payment | | way journey | | | +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ | Two-third of amount of the fee payable | Fifty | One month from date of payment | | for fifty single journeys | | | +-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 2106.55 crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [File No. NHAI/13013/CO/23-24/FeeNotification/Unnao-Lalganj Section (km 0.998-km. 70.000)/E-228484] SUMAN PRASAD SINGH Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054. AMIT KUMAR Digitally signed by AMIT JAISWAL KUMAR JAISWAL Date: 2024.01.30 17:12:58 +05'30'

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free