The Gazette of India
CG-DL-E-28032026-271364
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 1532]
NEW DELHI, WEDNESDAY, MARCH 25, 2026/
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 25th March, 2026
S.O. 1597(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 2427 (E), dated 22nd September 2009 and S. O. 863 (E), dated 1st April 2013, issued under
section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted
the stretch from Kilometer 166.000 to Kilometer 649.000 (Talegaon -Amravati - Gujrat/ Mahrashtra Border Section)
of National Highway No. 6 (New NH-53) in the State of Maharashtra to the National Highways Authority of India
(hereinafter referred to as the “Authority");
And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988
(68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) with NHIT Western
Projects Private Limited (“NHWPPL”), having its Registered Office at 325, 3rd Floor, D-21 Corporate Park, Sector-21,
Dwarka, New Delhi-110077 (hereinafter referred to as "Concessionaire") the successful bidder for bid submitted on
17th March 2026 for the Tolling, Operation, Maintenance and Transfer of Amravati to Tarsod Section from Km 166.725
to Km 422.700 of NH-53 (Old NH-6) in the state of Maharashtra (hereinafter referred to as the said section) of the
National Highway.
Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 and any
other its amendments notified thereof till signing of the Agreement and in supersession of the Notification Number S.
O. No 1711 (E) dated 29th April 2021 & S.O. No. 5949(E) dated 20th December 2022 except as respect things done or
omitted to be done before such supersession, the Central Government, having regard to the expenditure involved in
building, maintenance, management and operation of the said section of the said national highway, interest on the capital
invested, reasonable return, the volume of traffic and the period of said agreement between the Authority and the
Concessionaire, hereby notifies that there shall be levied and collected fees on mechanical vehicles for the use of the
Four lane highway Amravati - Tarsod Section from Km 166.725 to Km 422.700 of NH 53 in the State of Maharashtra
(hereinafter referred to as the "said section'), for
Before Completion of construction of Flyover at Km 240+660
Net road length of 225.258 km (Table 2) at 100% of the rates specified in Column (2) of Table 1 below and
for equivalent structure length (having length more than 60m) of 28.720 km. (having length 2.872 km, Table 4) and
one and half times of the base rate for use of bypasses, costing rupees ten crore or more, having length of 27.845 km
(Table 3) for the four or more lane section on the type of vehicles specified in Column (1) of Table-1, and authorises
the said Concessionaire to collect and retain the fee on and from the Appointed Date or publication of this Notification
in the Official Gazette, whichever is later, till the termination date as specified in the agreement.
After Completion of construction of Flyover at Km 240+660
Net road length of 225.158 km (Table-2) at 100% of the rates specified in Column (2) of Table 1 below and
for equivalent structure length (having length more than 60m) of 29.720 km. (having length 2.972 km, Table 4) and
one and half times of the base rate for use of bypasses, costing rupees ten crore or more, having length of 27.845 km
(Table 3) for the four or more lane section on the type of vehicles specified in Column (1) of Table 1, and authorises the
said Concessionaire to collect and retain the fee on and from the Appointed Date or publication of this Notification in
the Official Gazette, whichever is later, till the termination date as specified in the agreement, namely:-
Table - 1
+-------------------------------------------------------------+---------------------------------------+
| Type of vehicle | Base rate of fee per Km for the |
| | Base Year 2007-08 (in Rupees) |
+=============================================================+=======================================+
| (1) | (2) |
+-------------------------------------------------------------+---------------------------------------+
| Car, Jeep, Van, or Light Motor Vehicle | 0.65 |
+-------------------------------------------------------------+---------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Minibus | 1.05 |
+-------------------------------------------------------------+---------------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+-------------------------------------------------------------+---------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-------------------------------------------------------------+---------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment| 3.45 |
| (EME) or Multi Axle Vehicle (MAV) (four to six axles) | |
+-------------------------------------------------------------+---------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+-------------------------------------------------------------+---------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the following Fee Plaza, at the base
rate mentioned in Table 1 above, for the distance specified for such Fee Plazas, namely: -
Before Completion of construction of Flyover at Km 240+660
Table - 2
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| Location of Fee Plaza | Length (in km) for which Fee is | Rate at which Fee is |
| (Chainage) | Payable | payable |
+=====================================================================================================+================================================================================================================================+==================================================================+
| At Km 218.750 of NH-53 (Old NH-6) near Kurankhed Village in Akola District of Maharashtra | 70.038 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.552 Km of structures (having length more than 60m) and excluding bypass length 4.700 Km] | |
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| At Km 280.642 of NH-53 (Old NH-6) near Taroda Kasaba Village in Buldhana District of Maharashtra | 58.470 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.795 Km of structures (having length more than 60m) and excluding bypass length 13.720 Km] | |
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| At Km 356.542 of NH-53 (Old NH-6) near Dasarkhed Village in Buldhana District of Maharashtra | 38.562 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.513 Km of structures (having length more than 60m) and excluding bypass length 5.925 Km] | |
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| At Km 415.980 of NH-53 (Old NH-6) near Nashirabad Village | 58.188 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| and | [excluding 1.012 Km of structures (having length more than 60m) and excluding bypass length 3.500 Km] | |
| New toll plaza at km 412.050 of NH-53, in Jalgaon District of Maharashtra (Upon commencement of fee | | |
| collection at this fee plaza, operation of the fee plaza at km 415+980 shall be deemed discontinued.)| | |
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| Total Length | 225.258 | |
+-----------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
After Completion of construction of Flyover at Km 240+660
Table - 2
+---------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| Location of Fee Plaza | Length (in km) for which Fee is | Rate at which Fee is |
| (Chainage) | Payable | payable |
+===================================================================================================+================================================================================================================================+==================================================================+
| At Km 218.750 of NH-53 (Old NH-6) near Kurankhed Village in Akola District of Maharashtra | 69.938 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.652 Km of structures (having length more than 60m) and excluding bypass length 4.700 Km] | |
+---------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| At Km 280.642 of NH-53 (Old NH-6) near Taroda Kasaba Village in Buldhana District of Maharashtra | 58.470 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.795 Km of structures (having length more than 60m) and excluding bypass length 13.720 Km] | |
+---------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
| At Km 356.542 of NH-53 (Old NH-6) near Dasarkhed Village in Buldhana District of Maharashtra | 38.562 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| | [excluding 0.513 Km of structures (having length more than 60m) and excluding bypass length 5.925 Km] | |
+---------------------------------------------------------------------------------------------------+--------------------------------------------------------------------------------------------------------------------------------+------------------------------------------------------------------+
At Km 415.980 of NH-53 (Old NH-6) near
Nashirabad Village
and
New toll plaza at km 412.050 of NH-53, in
Jalgaon District of Maharashtra (Upon
commencement of fee collection at this fee
plaza, operation of the fee plaza at km
415+980 shall be deemed discontinued.)
Total Length
58.188
[excluding 1.012 Km of structures
(having length more than 60m) and
excluding bypass length 3.500 Km]
225.158
100% for four or more lane of
the base rates mentioned in
Table-1 above
2. In addition to the above, the following fee shall also be due and payable for the use of the following bypass(es)
at following Fee Plaza(s) at one and half times of the base rate mentioned in Table 1 above for the length of bypass(es)
specified for such Fee Plaza(s):
Table - 3
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
| Location of Toll Plaza (Chainage) | Name of the Bypass | Taking | Merging | Length and cost of | Cost (in | Rate at which fee is payable |
| | | Off | at | bypass for which | Rs. Crore) | |
| | | | | additional fee is | | |
| | | | | payable | | |
| | | | | Length (in km) | | |
+=====================================================================================================+====================+=========+==========+====================+====================+=====================================================+
| At Km 218.750 of NH-53 (Old NH-6) near Kurankhed Village in Akola District of Maharashtra | Boregaon Bypass | Km | Km | 4.70 | 63.638 | 150% for four or more lane of the base rates mentioned in Table-1 above |
| | | 229.100 | 233.800 | | | |
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
| At Km 280.642 of NH-53 (Old NH-6) near Taroda Kasaba Village in Buldhana District of Maharashtra | Khamgaon Bypass | Km | Km | 13.720 | 207.934 | 150% for four or more lane of the base rates mentioned in Table-1 above |
| | | 292.842 | 306.712 | | | |
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
| At Km 356.542 of NH-53 (Old NH-6) near Dasarkhed Village in Buldhana District of Maharashtra | Nandura Bypass | Km | Km | 5.925 | 84.477 | 150% for four or more lane of the base rates mentioned in Table-1 above |
| | | 315.742 | 321.742 | | | |
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
| At Km 415.980 of NH-53 (Old NH-6) near Nashirabad Village | Varangaon Bypss | Km | Km | 3.500 | 55.676 | 150% for four or more lane of the base rates mentioned in Table-1 above |
| and | | 387.242 | 390.842 | | | |
| New toll plaza at km 412.050 of NH-53, in Jalgaon District of Maharashtra (Upon commencement of fee | | |
| collection at this fee plaza, operation of the fee plaza at km 415+980 shall be deemed discontinued.)| | |
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
| Total (km) | | | | 27.845 | 411.725 | |
+-----------------------------------------------------------------------------------------------------+--------------------+---------+----------+--------------------+--------------------+-----------------------------------------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60 m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10, at the rate mention in
Table 1 above:
Before Completion of construction of Flyover at Km 240+660
Table-4
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| Location of Toll Plaza | Length of structures (in km) to be converted into equivalent road length | Equivalent Road Length (in km) | Rate at which Fee is Payable |
| (Existing Kilometre [Km]) | | | |
+=====================================================================================================+======================================================================+==============================+==================================================================+
| At Km 218.750 of NH-53 (Old NH-6) near Kurankhed Village in Akola District of Maharashtra | 0.552^ | 5.520 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| At Km 280.642 of NH-53 (Old NH-6) near Taroda Kasaba Village in Buldhana District of Maharashtra | 0.795^^ | 7.950 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| At Km 356.542 of NH-53 (Old NH-6) near Dasarkhed Village in Buldhana District of Maharashtra | 0.513^^^ | 5.130 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| At Km 415.980 of NH-53 (Old NH-6) near Nashirabad Village | 1.012^^^^ | 10.120 | 100% for four or more lane of the base rates mentioned in Table-1 above |
| and | | | |
| New toll plaza at km 412.050 of NH-53, in Jalgaon District of Maharashtra(Upon commencement of fee | | | |
| collection at this fee plaza, operation of the fee plaza at km 415+980 shall be deemed discontinued.)| | | |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| Total | 2.872 | 28.720 | |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-----------------+-------------------+-------------------+
| Sl. No | From Chainage | To Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+=================+===================+===================+
| 1 | 194.633 | 194.767 | Major Bridge | 0.134 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 2 | 200.519 | 200.611 | Major Bridge | 0.092 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 3 | 220.994 | 221.145 | Major Bridge | 0.151 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 4 | 206.396 | 206.571 | ROB | 0.175 |
+--------+-------------------+-----------------+-------------------+-------------------+
| Total Length | 0.552 |
+-----------------------------------------------------------------+-------------------+
^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-----------------+-------------------+-------------------+
| Sl. No | From Chainage | To Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+=================+===================+===================+
| 1 | 246.436 | 246.526 | Major Bridge | 0.090 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 2 | 247.627 | 247.707 | Major Bridge | 0.080 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 3 | 254.272 | 254.392 | Major Bridge | 0.120 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 4 | 273.022 | 273.116 | Major Bridge | 0.094 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 5 | 274.589 | 274.716 | Major Bridge | 0.127 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 6 | 283.664 | 283.732 | Major Bridge | 0.068 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 7 | 302.976 | 303.051 | Major Bridge | 0.075 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 8 | 243.511 | 243.586 | ROB LHS | 0.066* |
+--------+-------------------+-----------------+-------------------+-------------------+
| 9 | 243.520 | 243.576 | ROB RHS | |
+--------+-------------------+-----------------+-------------------+-------------------+
| 10 | 302.022 | 302.097 | ROB | 0.075 |
+--------+-------------------+-----------------+-------------------+-------------------+
| Total Length | 0.795 |
+-----------------------------------------------------------------+-------------------+
* Average Length of structure on LHS and RHS on Existing and New MCW has been considered.
^^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-----------------+-------------------+-------------------+
| Sl. No.| From Chainage | To Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+=================+===================+===================+
| 1 | 318.241 | 318.316 | Major Bridge | 0.075 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 2 | 324.607 | 324.695 | Major Bridge | 0.088 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 3 | 333.051 | 333.189 | Major Bridge | 0.138 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 4 | 352.602 | 352.704 | Major Bridge | 0.102 |
+--------+-------------------+-----------------+-------------------+-------------------+
| 5 | 345.285 | 345.395 | ROB | 0.110 |
+--------+-------------------+-----------------+-------------------+-------------------+
| Total Length | 0.513 |
+-----------------------------------------------------------------+-------------------+
^^^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-------------------+-------------------+-------------------+
| Sl. No.| Start Chainage | Start Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+===================+===================+===================+
| 1 | 360.618 | 360.681 | Major Bridge | 0.063 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 2 | 390.316 | 390.416 | Major Bridge | 0.100 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 3 | 390.954 | 391.453 | ROB | 0.499 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 4 | 405.505 | 405.580 | ROB | 0.075 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 5 | 409.666 | 409.859 | Major Bridge | 0.193 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 6 | 414.801 | 414.883 | ROB | 0.082 |
+--------+-------------------+-------------------+-------------------+-------------------+
| Total Length | 1.012 |
+-----------------------------------------------------------------+-------------------+
After Completion of construction of Flyover at Km 240+660
Table-4
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| Location of Toll Plaza | Length of structures (in km) to be converted into equivalent road length | Equivalent Road Length (in km) | Rate at which Fee is Payable |
| (Existing Kilometre [Km]) | | | |
+=====================================================================================================+======================================================================+==============================+==================================================================+
| At Km 218.750 of NH-53 (Old NH-6) near Kurankhed Village in Akola District of Maharashtra | 0.652^ | 6.520 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| At Km 280.642 of NH-53 (Old NH-6) near Taroda Kasaba Village in Buldhana District of Maharashtra | 0.795^^ | 7.950 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
| At Km 356.542 of NH-53 (Old NH-6) near Dasarkhed Village in Buldhana District of Maharashtra | 0.513^^^ | 5.130 | 100% for four or more lane of the base rates mentioned in Table-1 above |
+-----------------------------------------------------------------------------------------------------+----------------------------------------------------------------------+------------------------------+------------------------------------------------------------------+
At Km 415.980 of NH-53 (Old NH-6) near Nashirabad
Village
and
New toll plaza at km 412.050 of NH-53, in Jalgaon
District of Maharashtra (Upon commencement of fee
collection at this fee plaza, operation of the fee plaza at
km 415+980 shall be deemed discontinued.)
Total
1.012^^^^
10.120
2.972
29.720
100% for four or more lane
of the base rates mentioned
in Table-1 above
^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-------------------+-------------------+-------------------+
| Sl. No.| Start Chainage | Start Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+===================+===================+===================+
| 1 | 194.633 | 194.767 | Major Bridge | 0.134 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 2 | 200.519 | 200.611 | Major Bridge | 0.092 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 3 | 220.994 | 221.145 | Major Bridge | 0.151 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 4 | 206.396 | 206.571 | ROB | 0.175 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 5 | 240.610 | 240.710 | Flyover | 0.100 |
+--------+-------------------+-------------------+-------------------+-------------------+
| Total Length | 0.652 |
+-----------------------------------------------------------------+-------------------+
^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-------------------+-------------------+-------------------+
| Sl. No.| Start Chainage | Start Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+===================+===================+===================+
| 1 | 246.436 | 246.526 | Major Bridge | 0.090 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 2 | 247.627 | 247.707 | Major Bridge | 0.080 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 3 | 254.272 | 254.392 | Major Bridge | 0.120 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 4 | 273.022 | 273.116 | Major Bridge | 0.094 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 5 | 274.589 | 274.716 | Major Bridge | 0.127 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 6 | 283.664 | 283.732 | Major Bridge | 0.068 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 7 | 302.976 | 303.051 | Major Bridge | 0.075 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 8 | 243.511 | 243.586 | ROB LHS | 0.066* |
+--------+-------------------+-------------------+-------------------+-------------------+
| 9 | 243.520 | 243.576 | ROB RHS | |
+--------+-------------------+-------------------+-------------------+-------------------+
| 10 | 302.022 | 302.097 | ROB | 0.075 |
+--------+-------------------+-------------------+-------------------+-------------------+
| Total Length | 0.795 |
+-----------------------------------------------------------------+-------------------+
* Average Length of structure on LHS and RHS on Existing and New MCW has been considered.
^^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-------------------+-------------------+-------------------+
| Sl. No.| Start Chainage | Start Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+===================+===================+===================+
| 1 | 318.241 | 318.316 | Major Bridge | 0.075 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 2 | 324.607 | 324.695 | Major Bridge | 0.088 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 3 | 333.051 | 333.189 | Major Bridge | 0.138 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 4 | 352.602 | 352.704 | Major Bridge | 0.102 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 5 | 345.285 | 345.395 | ROB | 0.110 |
+--------+-------------------+-------------------+-------------------+-------------------+
| Total Length | 0.513 |
+-----------------------------------------------------------------+-------------------+
^^^^ The details of 4 or more lane structures (> 60 m length) are as under:
+--------+-------------------+-------------------+-------------------+-------------------+
| Sl. No.| Start Chainage | Start Chainage | Type of Structure | Total Length (km.)|
| | (at Km) | (at Km) | | |
+========+===================+===================+===================+===================+
| 1 | 360.618 | 360.681 | Major Bridge | 0.063 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 2 | 390.316 | 390.416 | Major Bridge | 0.100 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 3 | 390.954 | 391.453 | ROB | 0.499 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 4 | 405.505 | 405.580 | ROB | 0.075 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 5 | 409.666 | 409.859 | Major Bridge | 0.193 |
+--------+-------------------+-------------------+-------------------+-------------------+
| 6 | 414.801 | 414.883 | ROB | 0.082 |
+--------+-------------------+-------------------+-------------------+-------------------+
| Total Length | 1.012 |
+-----------------------------------------------------------------+-------------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes
and resides within a distance of twenty kilometers from the fee plaza is Rs. 340.00 (Rupees Three Hundred Forty only)
for the year 2025-26 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
+---------------------------------------------------------------------------------+------------------------------------------+----------------------------------------------+
| Amount Payable | Maximum number of one-way journeys allowed | Period of validity |
+=================================================================================+==========================================+==============================================+
| One and half times of the fee for one-way journey | Two | Twenty-four hours from the time of payment |
+---------------------------------------------------------------------------------+------------------------------------------+----------------------------------------------+
| Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment |
+---------------------------------------------------------------------------------+------------------------------------------+----------------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where the
fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
7. A mechanical vehicle which is loaded in excess of permissible load specified for its category under the rules,
shall not be permitted to use the National Highway for crossing the plaza until the excess load has been removed from
such mechanical vehicle. The driver or owner or a person in-charge of a mechanical vehicle which is loaded in excess
of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National
Highway to the fee collecting agency as per the applicable provision in the said rules, namely: -
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| Percentage of excess load over | Multiplying | Fees |
| Maximum Permissible Gross Vehicular Weight | Factor to the base rate | |
+=====================================================+=========================================================+=================================================================================================+
| (1) | (2) | (3) |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| 0% to 20% | Two | [(Fees applicable for such category of mechanical vehicle under sub-rule (2) of rule 4) x (Multiplying factor)] |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| >20% to 40% | Four | |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| >40% to 60% | Six | |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| >60% to 80% | Eight | |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
| >80% and above | Ten | |
+-----------------------------------------------------+---------------------------------------------------------+-------------------------------------------------------------------------------------------------+
8. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules.
9. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority. The
same shall be got published by the Authority in at least in at least one newspaper in English and vernacular language
through the Concessionaire and thereafter revised annually in accordance with the rule 5 of the said rules and provisions
of the Concession Agreement and will be published; provided, however, that such revision shall not be effected until a
period of 6 (six) months from the date of the preceding revision of fee.
[F. No. FINDIV-16016(13)/4/2026-TOT/ INVIT Division/ E-264073]
CHETNA NAND SINGH, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. GORAKHA NATH YADAVA Digitally signed by GORAKHA NATH YADAVA
Date: 2026.03.28 10:54:09 +05'30'