Gazette Tracker
Gazette Tracker

Core Purpose

Notifies toll fee rates for use of a section of National Highway 16 in Andhra Pradesh, including bypasses and structures, effective from the date of notification or commercial operation, whichever is later.

Detailed Summary

This notification issued by the Ministry of Road Transport and Highways, Government of India, revises the toll fee structure for the Anakapalli-Pendurthi-Anandapuram section of National Highway 16 (NH-16) in Andhra Pradesh. It supersedes a previous notification (S.O. No. 5127 (E) dated 09.12.2021). The notification authorizes NHIT Southern Projects Private Limited to collect toll fees. Key provisions include: - Specifies base toll rates for various vehicle categories based on 2007-08 levels, applicable to net road length and equivalent structure length. - Sets different toll rates for bypasses and structures exceeding 60 meters in length. - Identifies two toll plaza locations on NH-16 in Visakhapatnam district. - Provides detailed tables outlining vehicle classifications, base rates, applicable lengths for tolling, bypass fees, structure fees, and rates for monthly passes and overloaded vehicles. - Monthly pass rate for non-commercial vehicles within 20km of the plaza is fixed at ₹340 for 2024-25. - Overload charges are defined as multiples of the base rate, increasing with the percentage of excess weight.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-28032025-262038 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 1480] NEW DELHI, THURSDAY, MARCH 27, 2025/CHAITRA 6, 1947 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 27th March, 2025 S.O. 1498(E). - Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number SO No. 3492 (E) 31.10.2017 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from Anakapalli-Pendurthi- Anandapuram section (48.18 km) of NH-16 in the State of Andhra Pradesh to the National Highways Authority of India (hereinafter referred to as the "Authority"); And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988 (68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) with NHIT Southern Projects Private Limited ("NSPPL"), and having its registered office at 325, 3rd Floor, D21 Corporate Park, Sector 21. Dwarka, Dhulsiras, New Delhi, South West Delhi-110077. (hereinafter referred to as “Concessionaire") on 12.03.2025 for the Tolling, Operation, Maintenance and Transfer of Six lane Anandapuram- Pendurthi- Ankapalli from Design Km 682.980 to Design Km 731.585 of NH-16 in the state of Andhra Pradesh), (hereinafter referred to as the said section). Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules") and in supersession of the Notification Number S.O. No.5127 (E) dated 09.12.2021, except as respect things done or omitted to be done before such supersession, the Central Government, having regard to the expenditure involved in building, maintenance, management and operation of the said section interest on the capital invested, reasonable return, the volume of traffic and the period of the agreement entered into the Authority and the Concessionaire, hereby notifies that there shall be levied and collected fees on mechanical vehicles for the use of the said section at the rates specified in columm (2) of Table -1 below for net road section length 35.945 km and for equivalent structure length (having length more than 60m) of 8.500 km (having length of 0.850 km) and one and one half times of the base rate for use of bypasses, costing rupees 10 crore or more, having length of 11.81 km for four lane section on the type of vehicles specified in Column (1) of Table 1 and authorises the said Concessionaire to collect and retain the fee on and from the Date of commercial operation or publication or publication of this Notification in the Official Gazette, whichever is later, till the date of termination as specified in the agreement Table1 +-----------------------------------+-------------------------------------------------+ | Type of vehicle | Base rate of fee per Km for the | | | Base Year 2007-08 (in Rupees) | +===================================+=================================================+ | (1) | (2) | +===================================+=================================================+ | Car, Jeep, Van, or Light Motor Vehicle | 0.65 | +-----------------------------------+-------------------------------------------------+ | Light Commercial Vehicle, Light Goods | 1.05 | | Vehicle or Minibus | | +-----------------------------------+-------------------------------------------------+ | Bus or Truck (Two Axles) | 2.20 | +-----------------------------------+-------------------------------------------------+ | Three-axle commercial vehicles | 2.40 | +-----------------------------------+-------------------------------------------------+ | Heavy Construction Machinery (HCM) or | 3.45 | | Earth Moving Equipment (EME) or Multi Axle (four to | | | six axles) | | | Vehicle (MAV) (four to six axles) | | +-----------------------------------+-------------------------------------------------+ | Oversized Vehicles (seven or more axles) | 4.20 | +-----------------------------------+-------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Toll Plaza, at the base rates mentioned in Table labove, for the distance specified for such Toll Plaza(s) namely:- Table-2 +-----------------------------------------------+-------------------------------------------------------------------------------------------------------+------------------------------------------------------------------------------+ | Location of Toll Plaza | Length (in km) for which Fee is | Rate at which Fee is payable | | (Design km) | Payable | | +===============================================+=======================================================================================================+==============================================================================+ | At Km 686.540 of NH-16 near | 16.776 | 100% for four or more lane of the | | Dukkavanipalem village in | [excluding 0.433 km of structures | base rates mentioned in Table-1 | | Visakhapatnam district of Andhra | (having length more than 60m) and | above | | Pradesh State. | excluding bypass length 6.311 km] | | +-----------------------------------------------+-------------------------------------------------------------------------------------------------------+------------------------------------------------------------------------------+ | At Km 722.170 of NH-16 near | 19.169 | 100% for four or more lane of the | | Marripalem village in | [excluding 0.417 km of structures | base rates mentioned in Table-1 | | Visakhapatnam district of Andhra | (having length more than 60m) and | above | | Pradesh State | excluding bypass length 5.499 km] | | +-----------------------------------------------+-------------------------------------------------------------------------------------------------------+------------------------------------------------------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the following bypass(es) at the following Fee Plaza(s) at one and half times of the base rate mentioned in Table 1 above for the length of Bypass(es) specified for such Fee Plaza(s):- Table -3 +--------------------------+-------------------+-----------+-----------+------------------------------------------------------------------------------------+------------------------------------------------+ | Location of Fee | Name of the bypass| Taking | Merging | Length (excluding | Rate at which | | Plaza | | Off | at | structure >60m) & | fee is | | | | | | cost of Bypass for | payable | | | | | | which additional FEE | | | | | | | is payable | | | | | | | Length | Cost | | | | | | | (in Km) | (in Rs. | | | | | | | | Crores) | | +==========================+===================+===========+===========+===========+====================================================================================+================================================+ | At Km 686+540 of | Pendurthi | 699.900 | 706.500 | 6.311 | 165.22 | 150% for four | | NH-16 near | Bypass | | | | Cr. | or | | Dukkavanipalem | | | | | | more lane, of | | village in | | | | | | the | | Visakhapatnam | | | | | | base rates | | district of Andhra | | | | | | mentioned in | | Pradesh State. | | | | | | Table-1 | | | | | | | | above | +--------------------------+-------------------+-----------+-----------+-----------+------------------------------------------------------------------------------------+------------------------------------------------+ | At Km 722+170 of | Sabbavaram | 711.500 | 717.150 | 5.499 | 140.59 | 150% for four | | NH-16 near | Bypass | | | | Cr. | or | | Marripalem village | | | | | | more lane, of | | in Visakhapatnam | | | | | | the | +--------------------------+-------------------+-----------+-----------+-----------+------------------------------------------------------------------------------------+------------------------------------------------+ district of Andhra Pradesh State Total Length in km 11.81 base rates mentioned in Table-1 above 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60 m at the following Fee plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10, at the base rate mentioned in Table 1 above: - Table -4 +-----------------------------------------------+-----------------------------------------------------------------+-----------------------------+------------------------------------------------------------------------------+ | Location of Toll Plaza | Length of structures | Equivalent road length | Rate at which fee is | | (Design Kilometer) | (in km) to be converted | (in km) | payable | | | into equivalent road | | | | | length | | | +===============================================+=================================================================+=============================+==============================================================================+ | At Km 686+540 of NH-16 near | 0.433^ | 4.33 | 100% for four or more | | Dukkavanipalem village in | | | lanes, of the base rates | | Visakhapatnam district of Andhra | | | mentioned in Table-1 | | Pradesh State. | | | above | +-----------------------------------------------+-----------------------------------------------------------------+-----------------------------+------------------------------------------------------------------------------+ | At Km 722+170 of NH-16 near | 0.417^ | 4.17 | 100% for four or more | | Marripalem village in | | | lanes, of the base rates | | Visakhapatnam district of Andhra | | | mentioned in Table-1 | | Pradesh State | | | above | +-----------------------------------------------+-----------------------------------------------------------------+-----------------------------+------------------------------------------------------------------------------+ ^The details of structures (>60m length) are as under:- +--------+-------------------------+-----------------------+---------------------+--------------+ | Sl. No | Start Chainage | End Chainage | Type of | Length (km) | | | (at Km) | (at Km) | Structure | | +========+=========================+=======================+=====================+==============+ | 1 | 682.995 | 683.139 | Flyover | 0.144 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 2 | 701.759 | 701.826 | Major Bridge | 0.067 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 3 | 704.730 | 704.832 | ROB | 0.102 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 4 | 705.230 | 705.350 | Major Bridge | 0.120 | +--------+-------------------------+-----------------------+---------------------+--------------+ | | Total length (km) | | | 0.433 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 5 | 709.657 | 709.726 | Major Bridge | 0.069 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 6 | 712.455 | 712.606 | Major Bridge | 0.151 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 7 | 730.121 | 730.318 | ROB | 0.197 | +--------+-------------------------+-----------------------+---------------------+--------------+ | 10 | Total length (km) | | | 0.417 | +--------+-------------------------+-----------------------+---------------------+--------------+ 4. The Authority shall ensure compliance with Rule 4(5) and Rule 4(6) of the NH Fee Rules while determining the user fee rate to be levied on mechanical vehicles, as specified in Table-1. 5. The rate of monthly pass for a person who owns a mechanical vehicle registered for non- commercial purposes and resides within a distance of twenty kilometers from the fee plaza is Rs. 340.00 (Rupees Three Hundred Forty only) for the year 2024-25 which is subject to revision every year as per the provisions of National Highways Fee (Determination of Rates and Collection) Rules, 2008. 6. For multiple journey on the highway section, passes shall be issued at the following rates, namely: Table-5 +-------------------------------------------+----------------------------------------------+-------------------------------------------+ | Amount Payable | Maximum number of one- | Period of validity | | | way journeys allowed | | +===========================================+==============================================+===========================================+ | One and half times of the fee for one way | Two | Twenty four hours from the time | | journey | | of payment | +-------------------------------------------+----------------------------------------------+-------------------------------------------+ | Two-third of amount of the fee payable | Fifty | One month from date of payment | | for fifty single journeys | | | +-------------------------------------------+----------------------------------------------+-------------------------------------------+ 7. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where the fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 8. A mechanical vehicle which is loaded in excess of permissible load specified for its category under the rules, shall not be permitted to use the National Highway for crossing the plaza until the excess load has been removed from such mechanical vehicle. The driver or owner or a person in-charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency as per the applicable provision in the said rules, namely: - Table -6 +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ | Percentage of excess load | Multiplying Factor to | Fees | | over Maximum Permissible Gross | the base rate | | | Vehicular Weight | | | +===========================================================+==========================================+=================================================================================================+ | (1) | (2) | (3) | +===========================================================+==========================================+=================================================================================================+ | 0% to 20% | Two | [(Fees applicable for such category of | +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ | >20% to 40% | Four | mechanical vehicle under sub-rule (2) of | +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ | >40% to 60% | Six | rule 4) x (Multiplying factor)] | +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ | >60% to 80% | Eight | | +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ | >80% and Above | Ten | | +-----------------------------------------------------------+------------------------------------------+-------------------------------------------------------------------------------------------------+ 9. All definitions, category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road etc. shall be as per definitions specified in the Rules. 10. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules. 11. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority. The same shall be got published by the authority in at least one newspaper in English and vernacular language through the concessionaire and thereafter revised annually in accordance with the rule 5 of the said rule and provisions of the concession agreement and will be published; provided, however, that such revision shall not be effected until a period of 6 (six) months from the date of preceding revision of fee. [F. No. FINDIV-16012(12)/1/2024-O/oGM (Finance-II)-Part(3)/E-249666] KAMLESH CHATURVEDI, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free