MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 27th March, 2025
S.O. 1491(E).— Whereas by the notification of the Government of India in the Ministry of Road Transport
and Highways, number S.O. 386(E) dated 16th February 2010, issued under section 11 of the National Highway
Authority of India Act 1988 (68 of 1988), the Central Government has entrusted the Highway from km 166.65 to km
413.200 of NH-24 in the state of Uttar Pradesh to the National Highways Authority of India (hereinafter referred to as
the "Authority");
And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988
(68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) withNHIT
Southern Projects Private Limited ("NSPPL"), and having its registered office at 325, 3rd Floor, D21 Corporate Park,
Sector 21. Dwarka, Dhulsiras, New Delhi, South West Delhi-110077. (hereinafter referred to as “Concessionaire”) on
12.03.2025 for the Tolling, Operation, Maintenance and Transfer of Bareilly - Sitapur Section from Km 262.000 to
Km 419.590 ( existing km 262.000 to km 413.200) of NH-30 (Old NH-24) in the state of Uttar Pradesh, (hereinafter
referred to as the said section) of the National Highway.
Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, and any
other its amendments notified thereof till signing of the Agreement and in supersession of the Notification Number
S.O. No. 4876(E) dated 13th October, 2022, except as respect things done or omitted to be done before such
supersession, the Central Government, having regard to the expenditure involved in building, maintenance,
management and operation of the said section of the said national highway, interest on the capital invested, reasonable
return, the volume of traffic and the period of said agreement between the Authority and the Concessionaire, hereby
notifies that there shall be levied and collected fees on mechanical vehicles for the use of the Four lane highway
Bareilly - Sitapur Section from Km 262.000 to Km 419.590 ( existing km 262.000 to km 413.200) of NH-30
(Old NH-24) in the State of Uttar Pradesh (hereinafter referred to as the "said section"), for net road length of
127.502 km (Table 2) at 100% of the rates specified in Column (2) of Table 1 below and for equivalent structure
length (having length more than 60m) of 10.150 km. (having length 1.015 km, Table 4) and one and half times of the
base rate for use of bypasses, costing rupees ten crore or more, having length of 29.073 km (Table 3) for the four or
more lane section on the type of vehicles specified in Column (1) of Table 1, and authorises the said Concessionaire to
collect and retain the fee on and from the date of commercial operation or publication of this Notification in the
Official Gazette, whichever is later, till the termination date as specified in the agreement.
Table 1
+---------------------------------------------+------------------------------------------------------+
| Type of vehicle | Base rate of fee per Km for the |
| | Base Year 2007-08 (in Rupees) |
+=============================================+======================================================+
| (1) | (2) |
+---------------------------------------------+------------------------------------------------------+
| Car, Jeep, Van, or Light Motor Vehicle | 0.65 |
+---------------------------------------------+------------------------------------------------------+
| Light Commercial Vehicle, Light Goods | 1.05 |
| Vehicle or Minibus | |
+---------------------------------------------+------------------------------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+---------------------------------------------+------------------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+---------------------------------------------+------------------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth | 3.45 |
| Moving Equipment (EME) or Multi Axle | |
| Vehicle (MAV) (four to six axles) | |
+---------------------------------------------+------------------------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+---------------------------------------------+------------------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza, at the base rates
mentioned in Table 1 above, for the distance specified for such Fee Plaza(s), namely: -
Table - 2
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| Location of Fee Plaza | Length (in km) for which Fee is Payable | Rate at which Fee is |
| (Chainage) | | payable |
+=====================================================+=====================================================+=====================================================+
| At Design Km 266.900 of NH-30 | 66.913 | 100% for four or more lane |
| (Old NH-24) near Faridpur village | [excluding 0.615 Km of structures (having | of the base rates mentioned |
| in Bareilly district of Uttar Pradesh | length more than 60m) and excluding bypass | in Table-1 above |
| State. | length 11.272 Km] | |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| At Design Km 372.168 of NH-30 | 60.589 | 100% for four or more lane |
| (Old NH-24) near Maigalganj | [excluding 0.400 Km of structures (having | of the base rates mentioned |
| village in Kheri district of Uttar | length more than 60m) and excluding bypass | in Table-1 above |
| Pradesh State. | length 17.801 Km] | |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
2. In addition to the above, the following fee shall also be due and payable for the use of the following
bypass(es) at following Fee Plaza(s) at one and half times of the base rate mentioned in Table 1 above for the length of
bypass(es) specified for such Fee Plaza(s): -
Table - 3
+-----------------------------------------------------+----------------------------------+--------------+---------------------------------------------------+-----------------------------------------------------+
| Location of Toll | Name of the | Taking off | Length and Cost of bypass for | Rate at which |
| Plaza (Chainage) | Bypass | | which additional fee is payable | fee is payable |
| | | | | |
| | | | Length (in km) | Cost (in Rs. Crore) | |
+=====================================================+==================================+==============+=======================+=====================+=====================================================+
| At Design Km | Faridpur | Km | 5.250 | >10 Cr | 150% for four |
| 266.900 of NH- | Bypass | 267.800 | | | or more lane |
| 30 (Old NH-24) | | | | | of the base |
| near Faridpur | | | | | rates |
| village in Bareilly | | | | | mentioned in |
| district of Uttar | | | | | Table-1 above |
| Pradesh State. | Rauza Bypass | Km | 6.022 | >10 Cr | |
| | | 331.300 | | | |
+-----------------------------------------------------+----------------------------------+--------------+-----------------------+---------------------+-----------------------------------------------------+
| | Jang Bahadur | Km | 4.765 | >10 Cr | |
| | Ganj | 356.190 | | | |
+-----------------------------------------------------+----------------------------------+--------------+-----------------------+---------------------+-----------------------------------------------------+
| At Design Km | Bypass | Km | 6.450 | >10 Cr | 150% for four |
| 372.168 of NH- | | 373.950 | | | or more lane |
| 30 (Old NH-24) | Maigalganj | | | | of the base |
| near Maigalganj | Bypass | Km | 6.586 | | rates |
| village in Kheri | | 389.220 | (Excluding | | mentioned in |
| district of Uttar | | | length of | | Table-1 above |
| Pradesh State. | Maholi Bypass | Km | structure >60m) | | |
| | | 395.910 | | | |
+-----------------------------------------------------+----------------------------------+--------------+-----------------------+---------------------+-----------------------------------------------------+
| Total (Km) | | | 29.073 | | |
+-----------------------------------------------------+----------------------------------+--------------+-----------------------+---------------------+-----------------------------------------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60 m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10, at the rate mention in
Table 1 above:
Table-4
+-----------------------------------------------------+----------------------------------------------------------+----------------------------------------------------------+-----------------------------------------------------+
| Location of Toll Plaza | Length of structures (in km) | Equivalent | Rate at which |
| (Existing Kilometre [Km]) | to be converted into | road length | Fee is payable |
| | equivalent road length | (in km) | |
+=====================================================+==========================================================+==========================================================+=====================================================+
| At Design Km 266.900 of NH-30 | 0.615^ | 6.150 | 100% for four lane or |
| (Old NH-24) near Faridpur village in | | | more lane, of the base |
| Bareilly district of Uttar Pradesh | | | rates mentioned in |
| State. | | | Table-1 above |
+-----------------------------------------------------+----------------------------------------------------------+----------------------------------------------------------+-----------------------------------------------------+
| At Design Km 372.168 of NH-30 | 0.400^^ | 4.000 | 100% for four lane or |
| (Old NH- | | | more lane, of the base |
| 24) near Maigalganj village in Kheri | | | rates mentioned in |
| district of Uttar Pradesh State. | | | Table-1 above |
| | 1.015 | 10.150 | |
+-----------------------------------------------------+----------------------------------------------------------+----------------------------------------------------------+-----------------------------------------------------+
^ The details of 4 lane structures (> 60 m length) are as under:
+--------+---------------+---------------+-------------------+---------------------+
| Sl. No. | Start | End Chainage | Type of Structure | Total Length (km.) |
| | Chainage | (at Km) | | |
| | (at Km) | | | |
+========+===============+===============+===================+=====================+
| 1 | 289.193 | 289.328 | Major Bridge | 0.135 |
+--------+---------------+---------------+-------------------+---------------------+
| 2 | 290.379 | 290.511 | ROB | 0.132 |
+--------+---------------+---------------+-------------------+---------------------+
| 3 | 327.460 | 327.630 | Major Bridge | 0.170 |
+--------+---------------+---------------+-------------------+---------------------+
| 4 | 328.450 | 328.550 | Major Bridge | 0.100 |
+--------+---------------+---------------+-------------------+---------------------+
| 5 | 334.326 | 334.404 | ROB | 0.078 |
+--------+---------------+---------------+-------------------+---------------------+
| | Total Length | | | 0.615 |
+--------+---------------+---------------+-------------------+---------------------+
^^ The details of 4 lane structures (> 60 m length) are as under:
+--------+---------------+---------------+---------------------------+---------------------+
| Sl. No. | Start | End Chainage | Type of Structure | Total Length (km.) |
| | Chainage | (at Km) | | |
| | (at Km) | | | |
+========+===============+===============+===========================+=====================+
| 1 | 360.820 | 360.885 | Major Bridge | 0.065 |
+--------+---------------+---------------+---------------------------+---------------------+
| 2 | 368.973 | 369.108 | Major Bridge | 0.135 |
+--------+---------------+---------------+---------------------------+---------------------+
| 3 | 390.232 | 390.336 | Major Bridge (Maholi | 0.104 |
| | | | Bypass) | |
+--------+---------------+---------------+---------------------------+---------------------+
| 4 | 415.876 | 415.972 | Major Bridge | 0.096 |
+--------+---------------+---------------+---------------------------+---------------------+
| | Total Length | | | 0.400 |
+--------+---------------+---------------+---------------------------+---------------------+
4. The Authority shall ensure compliance with Rule 4(5) and Rule 4(6) of the NH Fee Rules while determining
the user fee rate to be levied on mechanical vehicles, as specified in Table-1.
5. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial
purposes and resides within a distance of twenty kilometers from the fee plaza is Rs. 340.00 (Rupees Three Hundred
Thirty only) for the year 2024-25 and is subject to revision every year as per the provisions of the said rules.
6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
+-----------------------------------+-----------------------------------------------+-----------------------+
| Amount Payable | Maximum number of one- way journeys allowed | Period of validity |
+===================================+===============================================+=======================+
| One and half times of the fee for | Two | Twenty-four hours from|
| one-way journey | | the time of payment |
+-----------------------------------+-----------------------------------------------+-----------------------+
| Two-third of amount of the | Fifty | One month from date of|
| fee payable for fifty single | | payment |
| journeys | | |
+-----------------------------------+-----------------------------------------------+-----------------------+
7. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where
the fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or
alternative road is available for use of such commercial vehicles.
8. A mechanical vehicle which is loaded in excess of permissible load specified for its category under the rules,
shall not be permitted to use the National Highway for crossing the plaza until the excess load has been removed from
such mechanical vehicle. The driver or owner or a person in-charge of a mechanical vehicle which is loaded in excess
of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the
National Highway to the fee collecting agency as per the applicable provision in the said rules, namely: -
Table -6
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| Percentage of excess load over | Multiplying Factor to | Fees |
| Maximum Permissible Gross | the base rate | |
| Vehicular Weight | | |
+=====================================================+=====================================================+=====================================================+
| (1) | (2) | (3) |
+=====================================================+=====================================================+=====================================================+
| 0% to 20% | Two | |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| >20% to 40% | Four | [(Fees applicable for such category of |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| >40% to 60% | Six | mechanical vehicle under sub-rule (2) |
| | | of rule 4) x (Multiplying factor)] |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| >60% to 80% | Eight | |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
| >80% and above | Ten | |
+-----------------------------------------------------+-----------------------------------------------------+-----------------------------------------------------+
9. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority.
The same shall be got published by the Authority in at least in at least one newspaper in English and vernacular
language through the Concessionaire and thereafter revised annually in accordance with the rule 5 of the said rules and
provisions of the Concession Agreement and will be published; provided, however, that such revision shall not be
effected until a period of 6 (six) months from the date of the preceding revision of fee.