Gazette Tracker
Gazette Tracker

Core Purpose

Notification prescribing toll fee rates for the Allahabad Bypass Section (Km 628.753 to 713.215) of NH-19 in Uttar Pradesh under a Toll-Operate-Transfer concession, superseding the prior 2014 fee notification.

Detailed Summary

In exercise of powers under section 8A of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 [GSR 838(E) dated 05.12.2008] and its subsequent amendment rules from 2010 through 2020, and in supersession of Notification No. S.O. 895(E) dated 26th March 2014, the Ministry of Road Transport and Highways issued S.O. 1568(E) dated 27th March 2024. It notes that the National Highways Authority of India, having been entrusted the Kanpur-Varanasi Section (Km 0.000 to 334.000) of National Highway No. 2 in Uttar Pradesh via S.O. 78(E) dated 4th February 1999 under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), entered into an agreement on 24th November 2023 with M/s Kokhraj Handia Expressway Private Limited (registered office B-376, Upper Ground Floor, Nirman Vihar, East Delhi-110092), pursuant to a bid submitted on 16.10.2023, for the Tolling, Operation, Maintenance and Transfer of the Allahabad Bypass Section (Km 628.753 to 713.215, project length 84.462 km) of National Highway No. 19 in Uttar Pradesh. The notification levies fees on mechanical vehicles at 2007-08 base rates of Rs. 0.65/km for cars, jeeps, vans and light motor vehicles, Rs. 1.05/km for light commercial or goods vehicles and mini buses, Rs. 2.20/km for two-axle buses and trucks, Rs. 2.40/km for three-axle commercial vehicles, Rs. 3.45/km for heavy construction machinery, earth moving equipment and multi-axle vehicles of four to six axles, and Rs. 4.20/km for oversized vehicles of seven or more axles, applied at 150 percent of base rates for the total equivalent tollable road length of 143.531 km, comprising 82.481 km of carriageway with an equivalent length of 123.721 km plus 1.981 km of qualifying structures exceeding 60 metres converted to an equivalent length of 19.810 km using a factor of 10. Fees are collected at six toll plazas: the Main Toll Plazas at Kokhraj (Km 632.603) and Handia (Km 710.703), and Ramp Plazas at Shringveerpur (645.375), Nawabganj (656.297), Soraon (667.358) and Sahson (687.568), with the notification also specifying a revised distance matrix and an additional Ramp Plaza at Ganga Expressway (Km 664.230) applicable after commissioning of the Ganga Expressway. The Concessionaire, M/s Kokhraj Handia Expressway Private Limited, is authorized to collect and retain the fee from the Appointed Date or the date of publication, whichever is later, until termination as specified in the concession agreement. The supplied text is truncated mid-table in the post-Ganga-Expressway distance matrix and does not include the remainder of the notification, including signatory details.

Full Text

2296 GI/202 4 (1) EXTRAORDINARY PART II —Section 3 —Sub-section ( ii) PUBLISHED BY AUTHORITY No. 1487] NEW DELH I, WEDNES DAY , MARCH 27, 2024 /CHAITRA 7, 194 6 CG-DL-E-28032024-253432 (1) (2) 150% से दकमी 632.603 645.375 656.297 667.358 687.568 710.703 (कोखराि) 632.603 0.000 15.544 26.466 37.393 57.174 82.481 रंप प्लािा (श्ृंगवेर पुर) 645.375 15.544 0.000 10.922 21.849 41.630 66.937 रंप प्लािा (नवाबगंि) 656.297 26.466 10.922 0.000 10.927 30.708 56.015 रंप प्लािा (सोरांव) 667.358 37.393 21.849 10.927 0.000 19.781 45.088 रंप प्लािा (सहसों) 687.568 57.174 41.630 30.708 19.781 0.000 25.307 मुख्य प्लािा (हंजडया) 710.703 82.481 66.937 56.015 45.088 25.307 0.000 से दकमी 632.603 645.375 656.297 667.358 687.568 710.703 (कोखराि) 632.603 0.000 1.078 1.078 1.212 1.641 1.981 (श्ृंगवेरपुर) 645.375 1.078 0.000 0.000 0.134 0.563 0.903 (नवाबगं ि) 656.297 1.078 0.000 0.000 0.134 0.563 0.903 (सोरांव) 667.358 1.212 0.134 0.134 0.000 0.429 0.769 (सहसों) 687.568 1.641 0.563 0.563 0.429 0.000 0.340 (हंजडया) 710.703 1.981 0.903 0.903 0.769 0.340 0.000 1 बड़ा पुल 634.019 635.031 1.012 10.120 2 बड़ा पुल 637.083 637.149 0.066 0.660 3 फ्लाईओवर 656.264 656.330 0.066 0.660 4 आरओबी 659.468 659.536 0.068 0.680 5 फ्लाईओवर 667.322 667.394 0.072 0.720 6 आरओबी 670.508 670.618 0.110 1.096 7 आरओबी 679.750 679.906 0.157 1.566 8 बड़ा पुल 680.176 680.266 0.090 0.904 9 फ्लाईओवर 687.492 687.644 0.152 1.524 10 बड़ा पुल 694.898 695.002 0.104 1.040 11 बड़ा पुल 705.658 705.742 0.084 0.840 क ु ल 1.981 19.810 से दकमी 632.603 645.375 656.297 667.358 687.568 710.703 (कोखराि) 632.603 0.000 34.096 50.479 68.209 102.167 143.531 (श्ृंगवेरपुर) 645.375 34.096 0.000 16.383 34.114 68.071 109.435 (नवाबगंि ) 656.297 50.479 16.383 0.000 17.731 51.688 93.052 (सोरांव ) 667.358 68.209 34.114 17.731 0.000 33.958 75.322 (सहसों ) 687.568 102.167 68.071 51.688 33.958 0.000 41.364 (हंजडया ) 710.703 143.531 109.435 93.052 75.322 41.364 0.000 से दकमी 632.603 645.375 656.297 664.230 667.358 687.568 710.703 (कोखराि) 632.603 0.000 15.544 26.466 34.265 37.393 57.174 82.481 (श्ृंगवेरपुर) 645.375 15.544 0.000 10.922 18.721 21.849 41.630 66.937 (नवाबगंि ) 656.297 26.466 10.922 0.000 7.799 10.927 30.708 56.015 (गंगा ईपी ) 664.23 0 34.265 18.721 7.799 0.000 3.128 22.909 48.216 (सोरांव ) 667.358 37.393 21.849 10.927 3.128 0.000 19.781 45.088 (सहसों ) 687.568 57.174 41.630 30.708 22.909 19.781 0.000 25.307 (हंजडया ) 710.703 82.481 66.937 56.015 48.216 45.088 25.307 0.000 से दकमी 632.603 645.375 656.297 664.230 667.358 687.568 710.703 (कोखराि) 632.603 0.000 1.078 1.078 1.212 1.212 1.641 1.981 (श्ृंगवेरपुर) 645.375 1.078 0.000 0.000 0.134 0.134 0.563 0.903 (नवाबगंि ) 656.297 1.078 0.000 0.000 0.134 0.134 0.563 0.903 (गंगा ईपी ) 664.230 1.212 0.134 0.134 0.000 0.000 0.429 0.769 (सोरांव ) 667.358 1.212 0.134 0.134 0.000 0.000 0.429 0.769 (सहसों ) 687.568 1.641 0.563 0.563 0.429 0.429 0.000 0.340 (हंजडया) 710.703 1.981 0.903 0.903 0.769 0.769 0.340 0.000 1 बड़े पुल 634.019 635.031 1.012 10.120 2 बड़े पुल 637.083 637.149 0.066 0.660 3 फ्लाईओवर 656.264 656.330 0.066 0.660 4 आरओबी 659.468 659.536 0.068 0.680 5 फ्लाईओवर 667.322 667.394 0.072 0.720 6 आरओबी 670.508 670.618 0.110 1.096 7 आरओबी 679.750 679.906 0.157 1.566 8 बड़े पुल 680.176 680.266 0.090 0.904 9 फ्लाईओवर 687.492 687.644 0.152 1.524 10 बड़े पुल 694.898 695.002 0.104 1.040 11 बड़े पुल 705.658 705.742 0.084 0.840 क ु ल 1.981 19.810 से दकमी 632.603 645.375 656.297 664.230 667.358 687.568 710.703 (कोखराि) 632.603 0.000 34.096 50.479 63.517 68.209 102.167 143.531 (श्ृंगवेरपुर) 645.375 34.096 0.000 16.383 29.422 34.114 68.071 109.435 (नवाबगंि ) 656.297 50.479 16.383 0.000 13.039 17.731 51.688 93.052 (गंगा ईपी ) 664.230 63.517 29.422 13.039 0.000 4.692 38.650 80.014 (सोरांव ) 667.358 68.209 34.114 17.731 4.692 0.000 33.958 75.322 (सहसों ) 687.568 102.167 68.071 51.688 38.650 33.958 0.000 41.364 (हंजडया ) 710.703 143.531 109.435 93.052 80.014 75.322 41.364 0.000 (1) (2) (3) >40% to 60% छह >60% to 80% आि MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi , the 27th March, 2024 S.O. 1568 (E).—Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 78(E), dated the 4th Februar y, 1999, issued under Section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from km 0.000 to km 334.000 (Kanpur – Varanasi Section) of National Highways number 2 in the State of Utt ar Pradesh to the National Highways Authority of India (hereinafter referred to as the “Authority”); And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988 (68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) with M/s Kokhraj Handia Expressway Private Limited, having its registered office at B -376, Upper Ground Floor, Nirman Vihar, East Delhi – 110092, Delhi, (hereinafter referred to as the “Concessionaire”), on 24th November, 2023 for the bid submitted on 16.10.2023 for the Tolling, Operation, Maintenance and Transfer (ToT mode) of Allahabad Bypass Section from km 628.753 to 713.215 (Project length 84.462 km) of National Highway number 19 in the state of Uttar Pradesh (hereinafter referred to as the said section) of the National Highway. Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 [GSR 838 (E) dt. 05.12.2008] read along with National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2010 [GSR 950(E ) 03.12.2010], National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2011 [GSR 15(E) 12.01.2011], National Highways Fee (Determination of Rates and Collection) Second Amendment Rules, 2011 [GSR 756 (E) 12.10.2011], National Highway s Fee (Determination of Rates and Collection) Amendment Rules, 2013 [GSR 778(E) 16.12.2013], National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2014 [GSR 26(E) 16.01.2014], National Highways Fee (Determination of Rates and Colle ction) Amendment Rules, 2014 [GSR 831(E) 21.11.2014], National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2014 [GSR 02(E) 29.12.2014], National Highways Fee (Determination of Rates and Collection) Amendment Rules 2015 [GSR 220(E) 23.03.2015], National Highways Fee (Determination of Rates and Collection) Amendment Rules 2016 [GSR 585(E) 08.06.2016], National Highways Fee (Determination of Rates and Collection) Amendment Rules 2016 [GSR 1114(E) 02.12.2016], The National Highways Fe e (Determination of Rates and Collection) Amendment Rules, 2017 [GSR 248(E) 14.03.2017] , The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2018 [GSR 427(E) 07.05.2018], The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2018 [GSR 920(E) 25.09.2018], The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2019 [GSR 942(E) 20.12.2019], The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 298(E) 15.05.2020], The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 523(E) 24.08.2020], The National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 804(E) 30.12.2020],a nd any other amendments till bid due date and in supersession of the Notification Number S.O. No. 895(E) dated 26th March, 2014 except as respect things done or omitted to be done before such supersession, the Central Government, having regard to the expen diture involved in building, maintenance, management and operation of the said Section of said National Highway, interest on the capital invested, reasonable return, the volume of traffic and the period of said agreement entered between the Authority and t he Concessionaire, hereby notifies that there shall be levied and collected fees on mechanical vehicles at the rate specified in column (2) of the Table 1 for total equivalent road length of 143.531 km [including 82.481 km bypass with equivalent length of 123.721 km and 1.981 km of structures (having length more than 60m) with equivalent length of 19.810 km] for use of four or more lane sections (hereinafter referred to as “base rate”) on the type of vehicles specified in column (1) of the Table 1 below and authorizes the said Concessionaire to collect and retain the fee on and from the Appointed Date or publication of this Notification in the Official Gazette, whichever is later, till the date of termination as specified in the agreement. This fee notificat ion shall be effective from the Appointed Date of the ToT project. TABLE 1 Type of vehicle Base rate of fee per km* for NH section of four or more lanes for the base year 2007 -08 (in Rupees) (1) (2) Car, Jeep, Van or Light Motor Vehicle 0.65 Light Comm ercial Vehicle, Light Goods Vehicle or Mini Bus 1.05 Bus or Truck ( Two Axles) 2.20 Three -axle commercial vehicles 2.40 Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45 Oversized Vehicles (seven or more axles) 4.20 1. The fee levied and collected hereunder shall be due and payable at the following Fee Plaza(s) for the distance specified for such Fee Plaza(s): Before Operation of Ganga Expressway (i) Journey from Km 628.753 to km 713.215 – Length (in km) Sl. No. Location of Toll Plaza [Existing Kilometre (Km)] Length (in km) for which Fee is Payable Rate at which Fee is payable 1 Km 632.603 Main Toll Plaza (Kokhraj) As per the distance matrix at Table below 150% of the base rates as per Table -I below 2 Km 645.375 Ramp Plaza (Shringveerpur)* 3 Km 656.297 Ramp Plaza (Nawabganj)* 4 Km 667.358 Ramp Plaza (Soraon)* 5 Km 687.568 Ramp Plaza (Sahson)* 6 Km 710.703 Main Toll Plaza (Handia) *- Toll collect ion shall be done only for exit from Allahabad Bypass Distance matrix for road length (Carriageway portion only, excluding structures >60m length) between Toll Plazas To Main Plaza (Kokhraj) Ramp Plaza (Shringveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 15.544 26.466 37.393 57.174 82.481 Ramp Plaza (Shringveerpur) 645.375 15.544 0.000 10.922 21.849 41.630 66.937 Ramp Plaza (Nawabganj) 656.297 26.466 10.922 0.000 10.927 30.708 56.015 Ramp Plaza (Soraon) 667.358 37.393 21.849 10.927 0.000 19.781 45.088 Ramp Plaza (Sahson) 687.568 57.174 41.630 30.708 19.781 0.000 25.307 Main Plaza (Handia) 710.703 82.481 66.937 56.015 45.088 25.307 0.000 (ii) In addition to above, the following fee shall also be due and payable at 100% of the base rate mentioned in Table -1 above for the use of the following structures having length more than 60 m at the following toll pl aza, by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10: To Main Plaza (Kokhraj) Ramp Plaza (Shrinveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 1.078 1.078 1.212 1.641 1.981 Ramp Plaza (Shrinveerpur) 645.375 1.078 0.000 0.000 0.134 0.563 0.903 Ramp Plaza (Nawabgan j) 656.297 1.078 0.000 0.000 0.134 0.563 0.903 Ramp Plaza (Soraon) 667.358 1.212 0.134 0.134 0.000 0.429 0.769 Ramp Plaza (Sahson) 687.568 1.641 0.563 0.563 0.429 0.000 0.340 Main Plaza (Handia) 710.703 1.981 0.903 0.903 0.769 0.340 0.000 The de tails of 4 lane structures (> 60 m length) are as under: Sl. No. Type of Structure (Existing Kilometre [Km]) Total Length (km) Equivalent Road Length (km) From To 1 Major Bridge 634.019 635.031 1.012 10.120 2 Major Bridge 637.083 637.149 0.066 0.660 3 Flyover 656.264 656.330 0.066 0.660 4 ROB 659.468 659.536 0.068 0.680 5 Flyover 667.322 667.394 0.072 0.720 6 ROB 670.508 670.618 0.110 1.096 7 ROB 679.750 679.906 0.157 1.566 8 Major Bridge 680.176 680.266 0.090 0.904 9 Flyover 687.492 687.644 0.152 1.524 10 Major Bridge 694.898 695.002 0.104 1.040 11 Major Bridge 705.658 705.742 0.084 0.840 Total 1.981 19.810 (iii) The net effective length for which fee shall be due and payable is as under: Distance matrix for total tollable ro ad length (including equivalent length of structures >60 m length) To Main Plaza (Kokhraj) Ramp Plaza (Shringveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 34.096 50.479 68.209 102.167 143.531 Ramp Plaza (Shringveerpur) 645.375 34.096 0.000 16.383 34.114 68.071 109.435 Ramp Plaza (Nawabganj) 656.297 50.479 16.383 0.000 17.731 51.688 93.052 Ramp Plaza (Soraon) 667.35 8 68.209 34.114 17.731 0.000 33.958 75.322 Ramp Plaza (Sahson) 687.568 102.167 68.071 51.688 33.958 0.000 41.364 Main Plaza (Handia) 710.703 143.531 109.435 93.052 75.322 41.364 0.000 2. The fee levied and collected hereunder shall be due and payab le at the following Fee Plaza(s) for the distance specified for such Fee Plaza(s): After Operation of Ganga Expressway (i) Journey from Km 628.753 to km 713.215 – Length (in km) Sl. No. Location of Toll Plaza [Existing Kilometre (Km)] Length (in km) for which Fee is Payable Rate at which Fee is payable 1 Km 632.603 Main Toll Plaza (Kokhraj) As per the distance matrix at Table below 150% of the base rates as per Table -I below 2 Km 645.375 Ramp Plaza (Shringveerpur)* 3 Km 656.297 Ramp Plaza (Nawab ganj)* 4 Km 664.230 Ramp Plaza (Ganga Expressway) 5 Km 667.358 Ramp Plaza (Soraon)* 6 Km 687.568 Ramp Plaza (Sahson)* 7 Km 710.703 Main Toll Plaza (Handia) *- Toll collection shall be done only for exit from Allahabad Bypass Distance matrix for road length (Carriageway portion only, excluding structures >60m length) between Toll Plazas To Main Plaza (Kokhraj) Ramp Plaza (Shringveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Ganga EP) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 664.230 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 15.544 26.466 34.265 37.393 57.174 82.481 Ramp Plaza (Shringveerpur) 645.375 15.544 0.000 10.922 18.721 21.849 41.630 66.937 Ramp Plaza (Nawabganj) 656.2 97 26.466 10.922 0.000 7.799 10.927 30.708 56.015 Ramp Plaza (Ganga EP) 664.230 34.265 18.721 7.799 0.000 3.128 22.909 48.216 Ramp Plaza (Soraon) 667.358 37.393 21.849 10.927 3.128 0.000 19.781 45.088 Ramp Plaza (Sahson) 687.568 57.174 41.630 30.708 22.909 19.781 0.000 25.307 Main Plaza (Handia) 710.703 82.481 66.937 56.015 48.216 45.088 25.307 0.000 (ii) In addition to above, the following fee shall also be due and payable at 100% of the base rate mentioned in Table -1 above for the use of t he following structures having length more than 60 m at the following toll plaza, by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalization factor of 10: - To Main Plaza (Kokhraj) Ramp Plaza (Shringveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Ganga EP) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 664.230 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 1.078 1.078 1.212 1.212 1.641 1.981 Ramp Plaza (Shringveerpur) 645.375 1.078 0.000 0.000 0.134 0.134 0.563 0.903 Ramp Plaza (Nawabganj) 656.297 1.078 0.000 0.000 0.134 0.134 0.563 0.903 Ramp Plaza (Ganga EP) 664.230 1.212 0.134 0.134 0.000 0.000 0.429 0.769 Ramp Plaz a (Soraon) 667.358 1.212 0.134 0.134 0.000 0.000 0.429 0.769 Ramp Plaza (Sahson) 687.568 1.641 0.563 0.563 0.429 0.429 0.000 0.340 Main Plaza (Handia) 710.703 1.981 0.903 0.903 0.769 0.769 0.340 0.000 The details of 4 lane structures (> 60 m length) are as under: Sl. No. Type of Structure (Existing Kilometre [Km]) Total Length (km) Equivalent Road Length (km) From To 1 Major Bridge 634.019 635.031 1.012 10.120 2 Major Bridge 637.083 637.149 0.066 0.660 3 Flyover 656.264 656.330 0.066 0.660 4 ROB 659.468 659.536 0.068 0.680 5 Flyover 667.322 667.394 0.072 0.720 6 ROB 670.508 670.618 0.110 1.096 7 ROB 679.750 679.906 0.157 1.566 8 Major Bridge 680.176 680.266 0.090 0.904 9 Flyover 687.492 687.644 0.152 1.524 10 Major Bridge 694.898 695.002 0.104 1.040 11 Major Bridge 705.658 705.742 0.084 0.840 Total 1.981 19.810 (iii) The net effective length for which fee shall be due and payable is as under: Distance matrix for total tollable road length (including equivalent length of structures >60 m length) To Main Plaza (Kokhraj) Ramp Plaza (Shringveerpur) Ramp Plaza (Nawabganj) Ramp Plaza (Ganga EP) Ramp Plaza (Soraon) Ramp Plaza (Sahson) Main Plaza (Handia) From Km 632.603 645.375 656.297 664.230 667.358 687.568 710.703 Main Plaza (Kokhraj) 632.603 0.000 34.096 50.479 63.517 68.209 102.167 143.531 Ramp Plaza (Shringveerpur) 645.375 34.096 0.000 16.383 29.422 34.114 68.071 109.435 Ramp Plaza (Nawabganj) 656.297 50.479 16.383 0.000 13.039 17.731 51.688 93.052 Ramp Plaza (Gang a EP) 664.230 63.517 29.422 13.039 0.000 4.692 38.650 80.014 Ramp Plaza (Soraon) 667.358 68.209 34.114 17.731 4.692 0.000 33.958 75.322 Ramp Plaza (Sahson) 687.568 102.167 68.071 51.688 38.650 33.958 0.000 41.364 Main Plaza (Handia) 710.703 143.531 109.435 93.052 80.014 75.322 41.364 0.000 3. The vehicle using only a part of the section by crossing a fee plaza shall pay the specified fee for that category of the vehicle for that plaza only and the vehicle using the whole section shall have a n option to pay the whole fee at the first fee plaza and cross another fee plaza by showing the fee receipt. 4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely; Amount Payable Maximum numbe r of one way journeys allowed Period of validity One and half times of the fee for one way journey Two Twenty four hours from the time of payment Two-third of amount of the fee payable for fifty or more single journeys Fifty One month from date of p ayment 5. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where the fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or alternati ve road is available for use of such commercial vehicles. 6. The driver or owner or a person in charge of a mechanical vehicle shall be liable to pay fee, for entering the overload vehicle on the national highway, to the user fee collecting ag ency, equal to fee as follows: - Percentage of excess load over Maximum Permissible Gross Vehicular Weight Multiplying Factor to the base rate Fees (1) (2) (3) 0% to 20% Two [(Fees applicable for such category of mechanical vehicle under sub -rule (2) of rule 4) x (Multiplying factor)] >20% to 40% Four >40% to 60% Six >60% to 80% Eight >80% and above Ten 7. All definitions, category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternati ve road etc. shall be as per definitions specified in the Rules. 8. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules. 9. Based on the Base Ra te of Fee per km for the base year 2007 -08 as mentioned in Table -1, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of completed portion of the length of the Project Hig hway. The same shall be got published by the Authority through the Concessionaire in at least one newspaper, each in English and vernacular language and thereafter revised annually in accordance with the rule 5 of the said rules and provision of Concession Agreement and got published, provided that no revision shall be effected within a period of 6 (six) months from the date of the preceding revision of Fee. [F. No. NHAI/Finance/TOT/2023 -24/TOT11/FeeNotification/E -233710] SUMAN PRASAD SINGH , Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064 and Published by the Controller of Publications, Delhi -110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free