Full Text
2221 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 1470] NEW DELHI FRIDAY , MARCH 22, 2024 /CHAITRA 02, 194 6
CG-DL-E-26032024-253369
CG-DL-E-26032024-253369
(1) (2)
1017.350 पर
100%
1017.3 50 पर गजलया 0.561* 5.61 0.661** 6.61 ऊपर
2. 1028.305 1028.787 आर ओ बी (चार लेन ) 0.483
2. 1028.305 1028.787 आर ओ बी (चार लेन) 0.483
(1) (2) (3)
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 22nd March , 2024
S.O. 1539(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. No. 465 (E) dated 26th April 2002, issued under section 11 of the National Highways
Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from Km 963.00 to Km
1126.00 of Nalbari – Bijni - Guwahati of National Highway No. 31 (New NH -27) in the State of Assam to the
National Highways Authority of India (hereinafter referred to as the “Aut hority”);
And whereas, in exercise of the powers conferred by Section 7 of the National Highway Act, 1956 (48 of
1956) read with Rule (3) of the National Highway Fee (Determination of Rates and Collection) Rules 2008, the
Central Government b y notification of the Government of India authorized Authority for levying and collecting fee on
mechanical vehicles for the use of stretches as follows:
Vide S.O. No. 1252 (E) dated 17th March 2021 for the Nalbari – Bijni - Guwahati section from design km 1013.000 to
km 1040.3000 of National Highway Number -31 (new NH -27) in the State of Assam.
And whereas, pursuant to the provision of Section 14 of the National Highways Auth ority of India Act, 1988
(68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) with NHIT
Eastern Projects Private Limited, having its registered office at G -5 & 6, Sector -10, Dwarka, Delhi, South West Delhi,
Delhi, India, 110075 (hereinafter referred to as the “Concessionaire”), on 07.03.2024 for the Tolling, Operation,
Maintenance and Transfer (InvIT) of Kaljhar – Pattacharkuchi section from km 1013.00 to km 1040.300 (Total
Project length 27.300 km) of Nation al Highway No. 27, (old NH - 31) in the state of Assam (hereinafter referred to as
the said section) of the National Highway;
Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of
1956), re ad with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 [GSR 838
(E) dt. 05.12.2008] read along with National Highways Fee (Determination of Rates and Collection) Amendment
Rules, 2010 [GSR 950(E) 03.12.2010], Nation al Highways Fee (Determination of Rates and Collection) Amendment
Rules, 2011 [GSR 15(E) 12.01.2011], National Highways Fee (Determination of Rates and Collection) Second
Amendment Rules, 2011 [GSR 756 (E) 12.10.2011], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2013 [GSR 778(E) 16.12.2013], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2014 [GSR 26(E) 16.01.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rule s, 2014 [GSR 831(E) 21.11.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2014 [GSR 02(E) 29.12.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rules 2015 [GSR 220(E) 23.03.2015], Nationa l Highways Fee (Determination of Rates and Collection)
Amendment Rules 2016 [GSR 585(E) 08.06.2016], National Highways Fee (Determination of Rates and Collection)
Amendment Rules 2016 [GSR 1114(E) 02.12.2016], The National Highways Fee (Determination of Ra tes and
Collection) Amendment Rules, 2017 [GSR 248(E) 14.03.2017] , The National Highways Fee (Determination of Rates
and Collection) Amendment Rules, 2018 [GSR 427(E) 07.05.2018], The National Highways Fee (Determination of
Rates and Collection) Amendment Rules, 2018 [GSR 920(E) 25.09.2018], The National Highways Fee
(Determination of Rates and Collection) Amendment Rules, 2019 [GSR 942(E) 20.12.2019], The National Highways
Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 298(E) 15.05 .2020], The National
Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 523(E) 24.08.2020], The
National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 804(E) 30.12.2020],
and any other amendmen ts till date of agreement and in supersession of the Notification Number S.O. No. 1252 (E)
dated 17.03.2021 except as respect things done or omitted to be done before such supersession, the Central
Government, having regard to the expenditure involved in b uilding, maintenance, management and operation of the
said Section of said National Highway, interest on the capital invested, reasonable return, the volume of traffic and the
period of said agreement entered between the Authority and the Concessionaire, h ereby notifies that there shall be
levied and collected fees on mechanical vehicles at the rate specified in column (2) of the Table 1 for total road length
of 27.300 km [including 26.739 km road, and 0.561 km of 4 lane structures (having length more than 60m) with
equivalent length of 5.61 km] (Before construction of flyover) and for total road length of 27.300 km [including
26.639 km road, and 0.661 km of 4 lane structures (having length more than 60m) with equivalent length of 6.61 km]
(after constructio n of flyover) for use of four and more lane sections (hereinafter referred to as “base rate”) on the
Type of Vehicles specified in column (1) of the Table 1 below and authorizes the said Concessionaire to collect and
retain the fee on and from the Appointe d Date or publication of this Notification in the Official Gazette, whichever is
later, till the date of termination as specified in the agreement. This fee notification shall be effective from the
Appointed Date of the ToT project.
TABLE 1
Type of vehicl e Base rate of fee per km* for NH
section of four or more lanes for
the base year 2007 -08
(in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck ( Two Axles) 2.20
Thre e-axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or
Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee levied and collected hereunder shall be du e and payable at the following Fee Plazas for the distance
specified for such Fee Plazas:
TABLE -2
S. No. Location of Toll Plaza
(Existing km) Length (in km) for which fee is payable Rate at Which fee is
payable
Before construction of
Flyover at Existi ng chainage
km 1032.840 After construction of
Flyover at Existing
Chainage km 1032.840
1 Galia Toll plaza at
Design km 1017.350 26.739 km
(excluding 0.561 km length of
4 – Lane structures as
indicated in Para 2 (Length >
60m) 26.639 km
(excluding 0.661 km
length of 4 – Lane
structures as indicated in
Para 2 (Length > 60m) 100% of the base rates
mentioned in Table -1
above
2. In addition to above, the following fee shall also be due and payable for the use of the following structures
having len gth more than 60 m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10:
TABLE -3
Location of Toll
Plaza (Existing
KM) Befor e construction of Flyover at
Existing chainage km 1032.840 After construction of Flyover at
Existing Chainage km 1032.840 Rate at which fee
is payable
Length of
structures (in
km) to be
converted in to
equivalent road Equivalent road
length (in km) Lengt h of
structures (in km)
to be converted in
to equivalent road Equivalent road
length (in km)
Galia Toll plaza at
Design km
1017.350 0.561* 5.61 0.661** 6.61 100% of the base
rates mentioned in
Table -1 above
*The details of structures (> 60 m length) ar e as under:
Sl. No. Chainage (km) Type of Structure Total Length (km)
From To
1 1025.468 1025.546 Major Bridge (Four lane) 0.078
2 1028.305 1028.787 ROB (Four Lane) 0.483
Total length 0.561
**The details of structures (> 60 m length) are as under:
Sl. No. Chainage (km) Type of Structure Total Length (km)
From To
1 1025.468 1025.546 Major Bridge (Four lane) 0.078
2 1028.305 1028.787 ROB (Four Lane) 0.483
3 1032.790 1032.890 Flyover (Six Lane) 0.100
Total length 0.661
3. The rate of m onthly pass for a person who owns a mechanical vehicle registered for non -commercial purposes
and resides within a distance of twenty kilometers from the fee plaza is Rs. 330.00 (Rupees Three Hundred Thirty
only) for the year 2023 -24 which is subject to re vision every year as per the provisions of the National Highways Fee
(Determination of Rates and Collection) Rules, 2008.
4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely;
TABLE -4
Amount Payab le Maximum number of one way
journeys allowed Period of validity
One and half times of the fee for one way
journey Two Twenty four hours from the time of
payment
Two-third of amount of the fee payable for
fifty single journeys Fifty One month from date o f payment
5. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where
the fee plaza falls shall be 50% of the prescribed rate for that category of vehicle provided no service road or
alternative road is available for use of such commercial vehicles.
6. The driver or owner or person in charge of a mechanical vehicle shall be liable to pay fee, for entering the
overloaded vehicle on the national highway, to the user fee collecting agency, e qual to fees as follows.
TABLE -5
Percentage of excess load over
Maximum Permissible Gross
Vehicular Weight Multiplying Factor to the
base rate Fees
(1) (2) (3)
0% to 20% Two
[(Fees applicable for such category of
mechanical vehicle under sub -rule (2) o f rule
4) x (Multiplying factor)] >20% to 40% Four
>40% to 60% Six
>60% to 80% Eight
>80% and Above Ten
7. All definitions, category of mechanical vehicles, its permissible load, category of exempted vehicles, service
road, alternative roa d etc. shall be as per definitions specified in the Rules.
8. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules.
9. Based on the Base Rate of Fee per km for the base year 2007 -08 as mentioned in Table -1, the actual amount of
fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of
completed length of the Project Highway. The same shall be got published by the Authority throu gh the
Concessionaire in at least one newspaper, each in English and vernacular language and thereafter revised annually in
accordance with the rule 5 of the said rules and provision of Concession Agreement and got published, provided that
no revision shal l be effected within a period of 6 (six) months from the date of the preceding revision of Fee.
[F. No. NHAI/Finance/Invit/23 -24/FeeNotification/Kaljhar -Pattacharkuchisection/GaliaTollPlaza/B -3
(modified/E -236035) ]
SUMAN PRASAD SINGH , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text