Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-24052025-263363
EXTRAORDINARY
PART III-Section 4
PUBLISHED BY AUTHORITY
No. 384]
NEW DELHI, FRIDAY, MAY 23, 2025/JYAISTHA 2, 1947
BUREAU OF INDIAN STANDARDS
(Department of Consumer Affairs)
NOTIFICATION
New Delhi, the 20th May, 2025
Ref: HQ-PUB013/1/2020-PUB-BIS (1237).—In pursuance of Sub-rule (1) of Rule (15) of the Bureau of
Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of
which are given in the second column of the schedule hereto annexed have been established on the date indicated
against it in third column. The particulars of the standards, if any which are given in the fourth column shall also
remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column.
SCHEDULE
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| SI | No., Year & Title of the Indian | Date of | No., Year & Title of the | Date of |
| No. | Standards Established | Establishment | Indian Standards to be | Withdrawal |
| | (2) | (3) | Withdrawn, if any | (5) |
+=====+=================================================================================================================+====================+==================================================================================================================+=====================+
| (1) | | | (4) | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 1 | IS 397 (Part 6) : 2025 | 19 May 2025 | IS 397 (Part 6) : 2018 | 19 November 2025 |
| | ISO 7870-6: 2024 | | ISO 7870-6: 2016 | |
| | Methods for Statistical Quality | | Methods for Statistical Quality | |
| | Control During Production | | Control During Production | |
| | Part 6 EWMA Control Charts for | | Part 6 EWMA Control Charts | |
| | the Process Mean | | | |
| | (First Revision) | | | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 2 | IS 1885 (Part 89) : 2025 | 19 May 2025 | IS 1885 (Part XXXI) – 1971 | 19 November 2025 |
| | IEC 60050-221: 1990 | | Electrotechnical Vocabulary | |
| | Electrotechnical Vocabulary | | Part XXXI Magnetism | |
| | Part 89 Magnetic Materials and | | IS 1885 (Part XLI) – 1975 | |
| | Components | | Electrotechnical Vocabulary | |
| | | | Part XLI Non-Reciprocal | |
| | | | Electromagnetic Components | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 3 | IS 2069: 2025 | 19 May 2025 | IS 2069: 1991 | 19 November 2025 |
| | Drums for Covered Winding Wires | | Drums for Covered Winding | |
| | and Strips for Electrical Purposes | | Wires and Strips for Electrical | |
| | Specification | | Purposes - Specification | |
| | (Third Revision) | | (Second Revision) | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 4 | IS 10161: 2025 | 19 May 2025 | IS 10161 – 1982 | 19 November 2025 |
| | Moving Coil Voltage Regulators | | Specification for Moving Coil | |
| | -Specification | | Voltage Regulators | |
| | (First Revision) | | | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 5 | IS 16075: 2025 | 19 May 2025 | IS 16075: 2013 | 19 November 2025 |
| | IEC 62501: 2024 | | IEC 62501: 2009 | |
| | Voltage Sourced Converter (VSC) | | Voltage Sourced Converter | |
| | Valves for High Voltage Direct | | (VSC) Valves for High- | |
| | Current (HVDC) Power | | Voltage Direct Current | |
| | Transmission — Electrical Testing | | VDC) Power Transmission | |
| | (First Revision) | | — Electrical Testing | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 6 | IS 16242 (Part 1): 2025 | 19 May 2025 | IS 16242 (Part 1): 2014 | 19 November 2025 |
| | IEC 62040-1: 2017+AMD 1 : | | IEC 62040-1:2008 | |
| | 2021 + AMD 2: 2022 CSV | | Uninterruptible Power Systems | |
| | Uninterruptible Power Systems | | (UPS) | |
| | (UPS) | | Part 1 General and Safety | |
| | Part 1 Safety Requirements | | Requirements for UPS | |
| | (First Revision) | | | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 7 | IS 16539 (Part 1/Sec 1): 2025 | 19 May 2025 | IS 6619-1972 | 19 November 2025 |
| | IEC 60146-1-1: 2024 | | Safety Code for | |
| | Semiconductor Converters | | Semiconductor Rectifier | |
| | Part 1 General Requirements and | | Equipment | |
| | Line Commutated Converters | | IS 16539 (Part 1/Sec 1): 2017 | |
| | Section 1 Basic Requirements | | IEC 60146-1-1: 2009 | |
| | Specification | | Semiconductor Converters | |
| | (First Revision) | | Part 1 General Requirements | |
| | | | and Line Commutated | |
| | | | Converters | |
| | | | Section 1 Specification | |
| | | | of Basic Requirements | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 8 | IS 19222: 2025 | 19 May 2025 | NA | NA |
| | ISO 18667: 2018 | | | |
| | Space Systems - Capability Based | | | |
| | Safety Dependability and Quality | | | |
| | Assurance (SD and QA) | | | |
| | Programme Management | | | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 9 | IS 19307: 2025 | 19 May 2025 | NA | NA |
| | Bicycles Brakes - Specification | | | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 10 | IS/IEC TS 60034-25: 2022 | 19 May 2025 | IS 15880: 2009 | 19 November 2025 |
| | Rotating Electrical Machines | | Three Phase Cage Induction | |
| | Part 25 a.c. Electrical Machines | | Motors When Fed from IGBT | |
| | Used in Power Drive Systems — | | Converters — Application | |
| | Application Guide | | Guide | |
| | | | IS 15881: 2009 | |
| | | | Three Phase Cage Induction | |
| | | | Motors Specifically Designed | |
| | | | for IGBT Converter Supply — | |
| | | | Specification | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
| 11 | IS/IEC 62368-1: 2023 | 19 May 2025 | IS/IEC 62368-1: 2018 | 19 November 2025 |
| | Audio/Video, Information and | | Audio/Video, Information and | |
| | Communication Technology | | Communication Technology | |
| | Equipment | | Equipment | |
| | Part 1 Safety Requirements | | Part 1 Safety Requirements | |
| | (Second Revision) | | (First Revision) | |
+-----+-----------------------------------------------------------------------------------------------------------------+--------------------+------------------------------------------------------------------------------------------------------------------+---------------------+
CHITRA GUPTA, Scientist G & DDG (Hallmarking and Training)
[ADVT.-III/4/Exty./117/2025-26]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.