Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-23122025-268752
EXTRAORDINARY
PART III—Section 4
PUBLISHED BY AUTHORITY
NEW DELHI, FRIDAY, DECEMBER 19, 2025/AGRAHAYANA 28, 1947
CENTRAL ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
New Delhi, the 9th December, 2025
F. No. 13/2/7/2015-PM/CERC.- In exercise of the powers conferred by Section 178 of the Electricity Act
2003 (36 of 2003) read with Section 66 thereof and the Guidelines on Import/ Export (Cross Border) of Electricity,
2018 issued by the Ministry of Power, Government of India, and all other powers enabling it in this behalf, the
Central Electricity Regulatory Commission hereby makes the following regulations to amend the Central Electricity
Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019 (hereinafter referred to as "the
Principal Regulations"), namely:-
1. Short Title and Commencement
(1) These regulations may be called the Central Electricity Regulatory Commission (Cross Border Trade of
Electricity) (Second Amendment) Regulations, 2025.
(2) These regulations shall come into force with effect from the date of their publication in the Official Gazette.
2. Amendment to Clause (1) of Regulation 2 of the Principal Regulations:
(1) The words "long-term access," appearing multiple times, shall be replaced with the words "GNA" in sub-
clause (d) of Clause (1) of Regulation 2 of the Principal Regulations.
(2) The words "or an electricity trading licensee of India or a generating station located within India and
electrically connected to the neighbouring country through its dedicated transmission line(s)" shall be
inserted at the end of sub-clause (e) of Clause (1) of Regulation 2 of the Principal Regulations.
(3) The words "through long-term access, medium-term open access, and short-term open access" shall be
replaced with the words "under GNA and T-GNA" in sub-clause (f) of Clause (1) of Regulation 2 of the
Principal Regulations.
(4) The words "which has been granted long-term access or medium-term open access or short-term open
access" shall be replaced with the words "that has been granted GNA or T-GNA" in sub-clause (g) of
Clause (1) of Regulation 2 of the Principal Regulations.
(5) A new sub-clause, namely, sub-clause (k-i), shall be added after sub-clause (k) in Clause (1) of Regulation 2
of the Principal Regulations, as under:
"(k-i) 'Communication Regulations' means Central Electricity Regulatory Commission
(Communication System for inter-State transmission of electricity) Regulations, 2017;"
(6) The words "the purpose of cross border trade of electricity" shall be replaced with the words "entities
covered under Regulation 10 of these regulations" in sub-clause (m) of Clause (1) of Regulation 2 of the
Principal Regulations.
(7) Sub-clause (n) of Clause (1) of Regulation 2 of the Principal Regulations shall be deleted.
(8) The words "or CTU, as the case may be," shall be added after the words "Long Term Transmission
Customers" in sub-clause (o) of Clause (1) of Regulation 2 of the Principal Regulations.
(9) Sub-clause (r), of Clause (1) of Regulation 2 of the Principal Regulations shall be substituted as under:
"(r) 'Cross Border Customer' means an entity that has been granted GNA or T-GNA, as the case may
be, for carrying out cross border trade of electricity in accordance with these regulations;"
(10) The words "or transmission system to connect with Indian Grid under Regulation 10(7) of these regulations,
for a generating station located in India and electrically directly connected to a neighbouring country" shall
be inserted at the end of sub-clause (u) of Clause (1) of Regulation 2 of the Principal Regulations.
(11) The word "2014" shall be replaced with the word "2024" in sub-clause (x) of Clause (1) of Regulation 2 of
the Principal Regulations.
(12) New sub-clause (x-i) shall be inserted after sub-clause (x) of Clause (1) of Regulation 2 of the Principal
Regulations, as under:
"(x-i) 'Due Date' means the forty fifth (45th) day from the date of presentation of the bill raised by the
Central Transmission Utility under these regulations;"
(13) Two new sub-clauses, namely, sub-clause (y-i) and sub-clause (y-ii), shall be added after sub-clause (y) in
Clause (1) of Regulation 2 of the Principal Regulations, as under:
"(y-i) 'General Network Access (GNA)' shall have the same meaning as defined under the GNA
Regulations;
(y-ii) 'GNA Regulations' means the Central Electricity Regulatory Commission (Connectivity and
General Network Access to the inter-State Transmission System) Regulations, 2022;"
(14) The word "2010" shall be replaced with the word "2023" in sub-clause (z) of Clause (1) of Regulation 2 of
the Principal Regulations;
(15) Sub-clause (ff), sub-clause (hh), sub-clause (mm) and sub-clause (oo) of Clause (1) of Regulation 2 of the
Principal Regulations shall be deleted.
(16) The words "which has been granted long-term access or medium-term open access or short-term open
access" shall be replaced with the words "that has been granted GNA or T-GNA”, in sub-clause (ss) of
Clause (1) of Regulation 2 of the Principal Regulations.
(17) The word "2010" shall be replaced with the word “2020” in sub-clause (uu) of Clause (1) of Regulation 2 of
the Principal Regulations;
(18) Sub-clause (vv) and sub-clause (ww) of Clause (1) of Regulation 2 of the Principal Regulations shall be
deleted.
(19) A new sub-clause, namely, sub-clause (yy-i), shall be added after sub-clause (yy) in Clause (1) of Regulation
2 of the Principal Regulations, as under:
"(yy-i) Temporary General Network Access (T-GNA)' shall have the same meaning as defined
under the GNA Regulations;"
(20) The words "Connectivity Regulations or STOA Regulations", occurring multiple times, shall be replaced
with the word "GNA Regulations”, in Clause (2) of Regulation 2 of the Principal Regulations.
(21) A new Clause, namely, Clause (3), shall be added after Clause (2) of Regulation 2 of the Principal
Regulations, as under:
"(3) Reference to any Acts, Rules and Regulations shall include amendments or consolidations or re-
enactments thereof."
3. Amendment to Regulation 3 of the Principal Regulations:
(1) The words "and the SNAs" shall be added at the end of the main paragraph of Clause (1) of Regulation 3 of
the Principal Regulations.
(2) The words "long-term access or medium-term open access or short-term open access" shall be replaced with
the words "GNA or T-GNA" in the proviso, and the words "Connectivity Regulations or STOA
Regulations" shall be replaced with the words “GNA Regulations" in the proviso of Clause (1) of
Regulation 3 of the Principal Regulations.
(3) A new sub-clause (iv) shall be added after sub-clause (iii) in Clause (2) of Regulation 3 of the Principal
Regulations, as under:
"(iv) through Indian Power Exchange in terms of Regulation 6 of these regulations:"
4. Amendment to Regulation 4 of the Principal Regulations:
(1) The words "short-term open access", occurring multiple times, shall be replaced with the word "T-GNA" in
Clause (4) of Regulation 4 of the Principal Regulations.
(2) The words "long-term access and medium-term open access" shall be replaced with the words “GNA” in
Clause (5) of Regulation 4 of the Principal Regulations.
5. Amendment to Regulation 5 of the Principal Regulations:
(1) The words "or by the Commission if agreed by both parties" shall be added at the end of the second proviso
to Clause (3) of Regulation 5 of the Principal Regulations.
6. Amendment to Regulation 7 of the Principal Regulations:
(1) Two new Clauses (2-i) and (2-ii) shall be added after Clause (2) of Regulation 7 of the Principal Regulations
as under:
"(2-i) Spare capacity in the Indian portion of the dedicated transmission system, developed, operated,
and maintained by the generating station located in a neighbouring country, can be utilised by other
entities under open access, subject to payment of transmission charges as per Regulation 30 (1) of these
regulations.
(2-ii) A transmission licensee may develop, operate, and maintain the Indian portion of the Cross
Border Transmission Link after obtaining the necessary approvals from the Government of India, for
the purpose of facilitating the transaction of power between the neighbouring countries under open
access, subject to payment of transmission charges by the participating entities as per Regulation 30 (1) of
these Regulations."
(2) The words "covered under Clauses (1), (2), (2-i) and (2-ii) of this Regulation" shall be added after the words
"Cross Border Transmission Link" in Clause (3) of Regulation 7 of the Principal Regulations.
(3) The word "PoC charges" shall be replaced with the words "Yearly Transmission charges" in Clause (4) of
Regulation 7 of the Principal Regulations.
(4) Clause (5) of Regulation 7 of the Principal Regulations shall be deleted.
7. Amendment to Regulation 8 of the Principal Regulations:
(1) The words "Long Term Access, Medium Term Open Access and Short Term Open Access" shall be
replaced with the words "General Network Access (GNA) and Temporary General Network Access (T-
GNA)" in the title of Regulation 8 of the Principal Regulations.
(2) Clause (1) of Regulation 8 of the Principal Regulations shall be substituted as under:
"(1) A Participating Entity located in a neighbouring country, for the purpose of injection into or
drawal from the Indian grid, shall be required to seek connectivity or GNA or T-GNA, as the case
may be, through separate applications:
Provided that an electricity trading licensee of India engaged in cross border trade of electricity may
seek GNA or T-GNA, in accordance with these Regulations read with the GNA Regulations."
(3) Clause (2) of Regulation 8 of the Principal Regulations shall be substituted as under:
"(2) Applications for grant of connectivity or GNA shall be made to CTU and Applications for grant of
T-GNA shall be made to NLDC under these Regulations, with the conditions as under:
a) Connectivity granted under these regulations shall allow connection to the Indian grid but
shall not confer any rights towards transmission access (GNA or T-GNA) for the Indian Grid
which shall be required to be obtained separately.
b) Applicant seeking grant of Connectivity or GNA or T-GNA under these regulations shall
furnish the Application fee and Bank Guarantee(s) in accordance with these regulations."
(4) The words "STOA Regulations and Connectivity" shall be replaced with the word “GNA" in Clause (3) of
Regulation 8 of the Principal Regulations.
8. Amendment to Regulation 9 of the Principal Regulations:
(1) Clause (1) of Regulation 9 of the Principal Regulations shall be substituted as under:
“(1) The applications for connectivity or GNA shall be accompanied by a non-refundable application
fee of Rs 5 lakh along with applicable taxes in Indian Rupees, payable in the name of the CTU.”
(2) The words "Participating Entities along with the application for long-term access" shall be replaced with the
words "Applicant along with the application for grant of GNA" in Clause (2) of Regulation 9 of the
Principal Regulations.
(3) Clause (3) of Regulation 9 of the Principal Regulations shall be substituted as under:
"(3) The fee for T-GNA applications shall be Rs 5,000 in Indian Rupees along with applicable taxes,
per application."
9. Amendment to Regulation 10 of the Principal Regulations:
(1) The words "Connectivity Regulations," shall be replaced with the words "GNA Regulations" in the main
paragraph of Clause (2) of Regulation 10 of the Principal Regulations.
(2) A new sub-clause (c) shall be added after Clause (2) of Regulation 10 of the Principal Regulations, as under:
"(c) Application Bank Guarantee (Conn-BG1) for Rs 50 lakh in Indian Rupees per application."
(3) The words "as per the Detailed Procedure made under Connectivity Regulations" shall be replaced with the
word "in terms of these regulations read with the GNA Regulations" in Clause (3) of Regulation 10 of the
Principal Regulations.
(4) Clause (4) of Regulation 10 of the Principal Regulations shall be substituted as under:
"(4) Upon grant of Connectivity, an agreement as provided in the Central Electricity Authority
(Technical Standards for Connectivity to the Grid), Regulations, 2007 shall be signed between the
entity which has been granted Connectivity, CTU, and such inter-State transmission licensee to
whose inter-State transmission system, the Connectivity has been granted."
(5) The words "long-term access or medium-term open access or short-term open access" shall be replaced with
the words "GNA or T-GNA” in Clause (5) of Regulation 10 of the Principal Regulations.
(6) The words "(other than a dedicated transmission system)" shall be inserted after the words "Cross Border
Transmission Link" in Clause (6) of Regulation 10 of the Principal Regulations.
(7) New Clauses (7) to (10) shall be added after Clause (6) of Regulation 10 of the Principal Regulations, as
under:
“(7) A generating station supplying power exclusively to a neighbouring country through a
dedicated transmission system may seek connectivity and access to the Indian Grid as per
Annexure-I to these regulations. Such entity shall comply with the requirements of the Grid Code
and the Technical Standards of CEA, and shall be liable for payment of applicable charges under
Regulations issued by the Commission, including reactive energy charges, transmission charges,
and deviation charges directly and not through SNA.
(8) Participating Entity located in a neighbouring country and getting connected to the Indian grid
through a dedicated transmission system, shall submit one time connectivity charges for Rs. One
lakh per MW for the quantum of connectivity granted, one month prior to a physical connection to
the Indian Grid. The one time charges paid by such entity shall be used for reducing the Monthly
Transmission Charges under the Sharing Regulations.
(9) In case the application for Connectivity under these regulations is withdrawn, the Application
Bank Guarantee submitted under this regulation shall be encashed.
(10) The Application Bank Guarantee submitted under this regulation shall be returned within
thirty (30) days of physical connection to the Indian Grid through the dedicated transmission
system."
10. Amendment to Regulation 11 of the Principal Regulations:
(1) The words "Short Term Open Access" shall be replaced with the word "T-GNA" in the title of Regulation
11 of the Principal Regulations.
(2) Clause (1) of Regulation 11 of the Principal Regulations shall be substituted as under:
"(1) The Application for grant of T-GNA to the Indian grid by a Participating entity located in the
neighbouring Country or by an electricity trading licensee of India, for the purpose of injection into the
Indian grid or drawal from the Indian grid, for cross border trade of electricity shall be made to NLDC
under these Regulations, subject to Regulation 6 of these regulations."
(3) The words "STOA Regulations for grant short-term open access" shall be replaced with the words "the GNA
Regulations for grant of T-GNA" in the main paragraph of Clause (2) of Regulation 11 of the Principal
Regulations.
(4) Clause (3) of Regulation 11 of the Principal Regulations shall be substituted as under:
"(3) NLDC shall process the Application and grant T-GNA in accordance with the GNA
Regulations."
11. Amendment to Regulation 12 of the Principal Regulations:
(1) The words "Long Term Access and Medium Term Open Access" shall be replaced with the words "General
Network Access (GNA)" in the title of Regulation 12 of the Principal Regulations.
(2) Clause (1) of Regulation 12 of the Principal Regulations shall be substituted with Clauses (1), (1-i) and (1-ii)
as under:
"(1) The following entities shall be eligible as Applicants to apply for a grant of GNA or for enhancement
of the quantum of GNA for injection into the Indian grid or drawal from the Indian grid:
a) A Participating Entity located in the neighbouring country;
b) An Electricity Trading licensee of India.
(1-i) Separate applications for grant of GNA for injection into the Indian grid or drawal from the Indian
grid shall be made to CTU.
(1-ii) GNA under these regulations may be applied for a period of more than eleven months:
Provided that where augmentation of ISTS of India is required for the grant of GNA, GNA shall be
applied for a period of sixty months or more. “
(3) The words "Connectivity Regulations for grant of long-term access or medium-term open access" shall be
replaced with the words "the GNA Regulations for grant of GNA” in the main paragraph of Clause (2) of
Regulation 12 of the Principal Regulations.
(4) Sub-clause (c) shall be substituted with sub-clauses (c) and (d) in Clause (2) of Regulation 12 of the
Principal Regulations as under:
"(c) Application Bank Guarantee (GNA-BG1) for Rs. 50 lakh in Indian Rupees per application;
(d) Access Bank Guarantee (GNA-BG2) as specified under Regulation 15 for GNA."
(5) Clause (3), Clause (4) and Clause (5) of Regulation 12 of the Principal Regulations shall be substituted as
under:
"(3) CTU shall process the application and grant GNA to the Indian grid in accordance with the GNA
Regulations except for the provisions specified herein.
(4) Upon grant of GNA for cross border trade of electricity, the entity that has been granted GNA shall
sign the GNA Agreement with CTU, which shall contain the date of commencement of GNA, the point
of injection or drawal of power into/from the Indian grid.
(5) Implementation of the transmission system augmentation in the Indian Grid, if any, for grant of
GNA shall be undertaken only after the applicant has submitted the Access Bank Guarantee specified
under Clause (2) of Regulation 15 of these regulations."
12. Amendment to Regulation 13 of the Principal Regulations:
(1) The words "Long Term Access and Medium Term Open Access" shall be replaced with the words "GNA”
in the title of Regulation 13 of the Principal Regulations.
(2) The words "long-term access" shall be replaced with the word “GNA” in Clause (1) and Clause (2) of
Regulation 13 of the Principal Regulations.
(3) Clause (3) of Regulation 13 of the Principal Regulations shall be deleted.
13. Amendment to Regulation 14 of the Principal Regulations:
(1) Clause (3), Clause (4), and Clause (5) of Regulation 14 of the Principal Regulations shall be substituted as
under:
"(3) In case of delay in achieving commercial operation date of generating station or unit(s) thereof and
associated dedicated transmission system in the neighbouring country beyond the scheduled date agreed in
the GNA Agreement, the generator or the trading licensee which has obtained GNA for the purpose of
injection into the Indian Grid shall be liable to pay transmission charges as under:
(a) In case where augmentation has been taken up under ISTS for grant of such GNA, the Yearly
transmission charges for such augmentation which has achieved COD shall be payable, from the
date of effectiveness of GNA till the generating station or unit thereof achieves COD, proportionate
to the quantum of GNA which has been made effective but the corresponding capacity of the
generating station or unit thereof has not achieved the COD;
(b) In the case where GNA for the purpose of injection into the Indian Grid has been granted on
existing ISTS with no identified augmentation to ISTS for such GNA and the GNA has been made
effective but the generating station or unit thereof has not achieved the COD, the transmission
charges shall be payable till the generating station or unit thereof achieves COD at 2% of T-GNA
rate for the State where injection point is located in Indian Grid (where T-GNA rate shall be as per
the Sharing Regulations);
(c) The amount received under this Clause, shall be used for reducing Monthly Transmission charges
under the Sharing Regulations.
(4) In case of delay in the commissioning of a Cross Border Transmission Link (except covered under
Regulation 7(2-i) and 7(2-ii)), compensation, if any, to the generating company or transmission licensee or
both, as the case may be, shall be as decided by the respective Governments.
(5) In the event of delay by the transmission licensee in commissioning of the transmission system within
India beyond its scheduled date and the generating company is ready with its generating station or unit(s),
the transmission licensee shall pay transmission charges (which such transmission licensee would have
received after achieving its COD) to the generating company or the trading licensee on behalf of such
generating company, proportionate to the quantum of GNA for which corresponding generation capacity
has achieved commercial operation, in case no alternative arrangement is made by the transmission
licensee in consultation with CTU to evacuate the power of such generating station:
Provided that where YTC of the delayed transmission system is not available, CTU shall work out the YTC for
such transmission system, for the purpose of this Clause, based on the indicative capital cost of a similar
configuration of the inter-State transmission system:
Provided further that in case of non-payment of transmission charges for more than three months from the due
date, by the transmission licensee to the generating company or the trading licensee, as the case may be, such
charges shall be recovered by the CTU from the Contract Performance Guarantee furnished by the
transmission licensee and paid to the generating company or the trading licensee, as the case may be."
14. Amendment to Regulation 15 of the Principal Regulations:
(1) Clause (1) to Clause (7) of Regulation 15 of the Principal Regulations shall be substituted as Clause (1) to
Clause (9) as under:
"(1) An entity seeking GNA for cross border trade of electricity shall be required to furnish to the CTU,
along with the application, an Access Bank Guarantee, for an amount of Rs. Five (5) Lakh/MW
corresponding to the quantum of GNA sought.
(2) In case the grant of GNA requires augmentation of transmission system in India, the CTU shall
intimate the cost of augmentation within ninety (90) days from the date of the month in which the
application is made and the entity shall furnish a fresh Access Bank Guarantee for an amount equivalent to
the cost of such augmentation within one (1) month of intimation of the cost of augmentation by CTU:
Provided that on receipt of the Access Bank Guarantee in pursuance of the above, CTU shall return the Access
Bank Guarantee submitted in terms of Clause (1).
(3) The validity Period of the Access Bank Guarantee shall be included by CTU in the format of the
Access Bank Guarantee.
(4) The Cross Border Customer who has been granted GNA may approach CTU and seek permission to
relinquish part or full quantum of GNA granted under these regulations, with a notice period of one
month. CTU shall consider such requests and communicate the decision to the applicant not later than
thirty (30) days from the date of the request. The request for the relinquishment of GNA shall be treated
as follows:
(a) If the full quantum GNA is sought to be relinquished prior to the award of the contract for
execution of the transmission system (identified under grant of GNA) by the transmission
licensee and relinquishment is permitted by CTU, the Application Bank Guarantee shall be
encashed and the Access Bank Guarantee shall be returned;
(b) If the part quantum of GNA is sought to be relinquished prior to the award of the contract for
execution of the transmission system (identified under grant of GNA) by the transmission
licensee and relinquishment is permitted by CTU, the Application Bank Guarantee shall be
considered for the balance quantum of the GNA and proportionate Access Bank Guarantee for
the quantum of GNA relinquished shall be returned;
(c) If the full quantum of GNA is sought to be relinquished after the award of the contract for
execution of the transmission system (identified under the grant of GNA) and before the
effectiveness of GNA, and relinquishment is permitted by CTU, the Application Bank
Guarantee and the Access Bank Guarantee shall be encashed by the CTU;
(d) If part quantum of GNA is sought to be relinquished after the award of the contract for
execution of the transmission system (identified under grant of GNA) and before the
effectiveness of GNA, and relinquishment is permitted by CTU, the Application Bank
Guarantee shall be considered for the balance quantum of the GNA and the Access Bank
Guarantee shall be encashed for proportionate quantum of the GNA relinquished by the CTU;
(e) If the full quantum of GNA is sought to be relinquished by a Cross Border Customer who has
been granted GNA on existing margins with no augmentation in the Indian Grid, before the
effectiveness of such GNA and relinquishment is permitted by CTU, the Application Bank
Guarantee shall be encashed, and the Access Bank Guarantee shall be returned by the CTU;
(f) If part quantum of GNA is sought to be relinquished by a Cross Border Customer who has
been granted GNA on existing margins with no augmentation in Indian Grid, before the
effectiveness of such GNA and relinquishment is permitted by CTU, the Application Bank
Guarantee shall be considered for the balance quantum of the GNA and the Access Bank
Guarantee shall be returned by the CTU in proportion to such quantum GNA;
(g) If the full quantum of GNA is sought to be relinquished by a Cross Border Customer who has
been granted GNA with augmentation or without augmentation, after the effectiveness of such
GNA, and relinquishment is permitted by CTU, the subsisting Application Bank Guarantee
and Access Bank Guarantee shall be encashed by the CTU. In the event of no subsisting
Access Bank Guarantee, one month transmission charges payable by such entity under the
Sharing Regulations shall be payable as relinquishment charges;
(h) If part quantum of GNA is sought to be relinquished by a Cross Border Customer who has
been granted GNA with augmentation or without augmentation, after the effectiveness of such
GNA, and relinquishment is permitted by CTU, subsisting Application Bank Guarantee shall
be considered for the balance quantum of the GNA and the Access Bank Guarantee shall be
encashed by the CTU in proportion to such quantum of the GNA. In case of no subsisting
Access Bank Guarantee, one month transmission charges payable by such entity under the
Sharing Regulations shall be payable in proportion to the quantum of GNA relinquished as
relinquishment charges.
(5) In case there is a delay in achieving the commercial operation date of the generating station or unit
thereof and associated dedicated transmission system beyond the timelines agreed in the GNA
Agreement, and the GNA has been made effective, the transmission charges if not paid for more than three
months from due date by the Cross Border Customer as provided in Clause (3) of Regulation 14, shall be
recovered by CTU by encashing the Access Bank Guarantee submitted in terms of Clause (1) or Clause
(2), as the case may be."
(6) The quantum of Access Bank Guarantee submitted in terms of Clause (1) or Clause (2), as the case
may be, shall be progressively reduced each year after the Cross Border Customer begins to avail of
GNA corresponding to one-fifth of its total value. On completion of each year, one-fifth of the value of
the Access Bank Guarantee shall be returned to the Cross Border Customer each year.
(7) Application Bank Guarantee submitted along with the application for GNA shall be returned within a
period of 30 days of the Commercial Operation declaration of the generating station or start of drawal
of power, as the case may be, under the GNA by the entity which has been granted GNA.
(8) In case an electricity trading licensee of India is making an application for a grant of GNA, it may
furnish the Access Bank Guarantee issued by the entity on whose behalf such trading licensee has sought
GNA, subject to a condition that the Access Bank guarantee shall be issued by any scheduled
commercial bank in India recognised by the Reserve Bank of India.
(9) The amount received from the encashment of Application Bank Guarantee and Access Bank
Guarantee shall be used for reducing the Monthly Transmission Charges under the Sharing
Regulations."
15. Amendment to Regulation 16 of the Principal Regulations:
(1) The title of Regulation 16 of the Principal Regulations shall be substituted as "Effectiveness of GNA".
(2) The words "operationalisation" shall be replaced with the word "effectiveness" and the words "long-term
access (appearing multiple times) and “Long Term Transmission Access" shall be replaced with the word
"GNA" in Clause (1) of Regulation 16 of the Principal Regulations.
(3) The words "operationalisation" shall be replaced with the word “effectiveness", the words "long-term
access" (appearing multiple times) shall be replaced with the word “GNA", and the words "Long Term
Transmission Access Customer" shall be substituted with the words "Cross Border Customer" in Clause
(2) of Regulation 16 of the Principal Regulations.
16. Amendment to Regulation 18 of the Principal Regulations:
(1) Clause (2) of Regulation 18 of the Principal Regulations shall be substituted as under:
"(2) All Participating Entities shall ensure that the voice and data communication facilities to telemeter
power system parameters such as power flow, voltage, and status of switches or transformer taps, etc.,
are installed in line with interface requirements as per the Communication Regulations and Central
Electricity Authority (Technical Standards for Communication System in Power System Operations)
Regulations, 2020 and amendment thereof. The associated voice and data communication system to
facilitate voice and data flow up to the appropriate data collection point on the CTU system shall be
established by the concerned Participating Entities as specified by CTU in the Connection Agreement.”
17. Amendment to Regulation 21 of the Principal Regulations:
(1) Clause (1) of Regulation 21 of the Principal Regulations shall be substituted as under:
"(1) All Participating Entities shall have in place a cyber-security framework in accordance with the
Information Technology Act, 2000; CEA (Technical Standards for Connectivity) Regulations, 2007;
CEA (Cyber Security in Power Sector) Guidelines, 2021 and any such regulations issued from time to
time, by an appropriate authority, to identify the critical cyber assets and protect them and shall conduct
Cyber Security Audit, so as to support reliable operation of the grid. NLDC shall monitor the progress
in this regard."
18. Amendment to Regulation 23 of the Principal Regulations:
(1) The words "costly" shall be replaced with the words "critical" in sub-clause (c) of Clause (2) of Regulation
23 of the Principal Regulations.
(2) Clause (5) of Regulation 23 of the Principal Regulations shall be substituted as under:
"(5) The Control Centres of the System Operators and the Substation Control Rooms at either end of the
Cross Border Transmission Link or at the participating entity control centres shall be manned by adequate
and trained manpower at all times to facilitate the round-the-clock operation of the cross border
interconnections or the dedicated transmission system."
19. Amendment to Regulation 25 of the Principal Regulations:
(1) The words "Part-6" shall be deleted in Clause (2) of Regulation 25 of the Principal Regulations.
20. Amendment to Regulation 26 of the Principal Regulations:
(1) The words "DSM Regulations in India" shall be replaced with the words “charges for the general seller and
buyer under the DSM Regulations in India for injecting and buying entities respectively" in Clause (6) of
Regulation 26 of the Principal Regulations.
21. Amendment to Regulation 27 of the Principal Regulations:
(1) Clause (2) of Regulation 27 of the Principal Regulations shall be substituted as under:
"(2) The curtailment shall be carried out in terms of provisions of the Grid Code, with T-GNA to be
curtailed first (within transactions under T-GNA, bilateral transactions shall be curtailed first followed
by collective transactions under day ahead market followed by collective transactions under real time
market), followed by the GNA:
Provided that amongst the grantees of access to a particular category, curtailment shall be carried out
on a pro-rata basis."
22. Amendment to Regulation 29 of the Principal Regulations:
(1) The words ", or earlier as per requirements” shall be added after the word “meetings”, and the words "and
cyber security issues" shall be added at the end in Regulation 29 of the Principal Regulations.
23. Amendment to Regulation 30 of the Principal Regulations:
(1) Clause (1) of Regulation 30 of the Principal Regulations shall be substituted as under:
"(1)
(a) Transmission charges towards the use of ISTS of India shall be payable for drawal from the
Indian Grid by the Cross Border Customer as per provisions of the Sharing Regulations.
(b) The transmission charges for the Cross Border Transmission Link(s) covered under Clauses (1)
and (2) of Regulation 7 of these regulations (except dedicated transmission lines), shall be payable
as per Government to Government agreements.
(c) The transmission charges for the use of the Cross Border Transmission Link covered under
Clauses (2-i) and (2-ii) of Regulation 7 of these regulations shall be recovered as detailed at
Annexure-II to these regulations.”
24. Amendment to Regulation 31 of the Principal Regulations:
(1) Regulation 31 of the Principal Regulations shall be substituted as under:
"31. Transmission Losses
In line with the provisions of Scheduling and Despatch Procedure of Grid Code and Regulation 10
of the Sharing Regulations, the transmission losses shall be applied at the rate of the Average all
India ISTS losses for drawal schedules at the Indian end of the Cross Border Transmission Link."
25. Amendment to Regulation 32 of the Principal Regulations:
(1) The word "2009" shall be replaced with the word "2024" in Clause (1) of Regulation 32 of the Principal
Regulations.
26. Amendment to Regulation 33 of the Principal Regulations:
(1) The words "long-term access and medium-term open access" shall be replaced with the word "GNA" in
Clause (2) of Regulation 33 of the Principal Regulations.
27. New Regulation 33-A of the Principal Regulations:
(1) A new Regulation namely (33-A) shall be inserted after Regulation 33 of the Principal Regulations as under:
A "(33-A) Nodal Agency, I.E., Ctu Shall Issue The 'Detailed Procedure For Connectivity And Gna' In Line
With These Regulations, Including The Following Formats After Stakeholders' Consultation Within A Period
Of 3 Months Of Notification Of These Regulations And Submit The Same For Information Of The Central
Commission:
A) Application For Connectivity;
B) Intimation For Grant Of Connectivity;
C) Format For Bank Guarantees;
D) Application For The Grant Of Gna;
E) Grant Of Gna;
F) Relinquishment Of Gna:
B Provided That Till The Formats For Connectivity And Gna Are Issued By The Nodal Agency, The
Application For Connectivity Or Gna Under These Regulations Shall Be Made Utilising The Formats Under
The Gna Regulations Along With The Submission Of Necessary Details As Required Under These
Regulations. Post Issuance Of The Formats Under These Regulations, The Same Shall Be Utilised For Making
The Application For Connectivity Or Gna Under These Regulations.
28. Annexure-I and Annexure-II:
(1) Annexure-I and Annexure-II shall be added at the end of the Principal Regulations as under:
"
Annexure-I
Modalities for Connectivity, GNA, T-GNA for an entity under Regulation 10(7) of these regulations
(a) Such entity shall take approval from the Government of India for such additional connectivity and
access to the Indian Grid. The Applicant shall be required to make a separate application for a grant of
connectivity to the Indian Grid and Access to the Indian Grid (GNA or T-GNA).
(b) The application for a grant of connectivity to the Indian Grid shall be accompanied by an application
fee of Rs 5 lakh along with applicable taxes, an Application Bank Guarantee of Rs 50 lakh.
(C) CTU, within 60 days of receipt of an application for connectivity, shall grant the connectivity.
(d) Grant of connectivity to such applicant shall not confer the right for the transaction of power into the
Indian Grid. Such Applicant shall separately apply for GNA or T-GNA for transaction power into the
Indian Grid.
(e) The application for a grant of GNA shall be accompanied by an application fee of Rs 5 lakh in Indian
Rupees and an Access Bank Guarantee as per Regulation 15(1) of these regulations.
(f) In case the grant of GNA requires augmentation of ISTS, CTU, within 90 days of receipt of an
application for GNA, shall inform the applicant of the amount of Access Bank Guarantee to be
furnished by the Applicant as per Regulation 15(2) of these regulations. The applicant shall be required
to furnish such an Access Bank Guarantee within one month of such intimation by CTU, and upon
submission of a revised Access Bank Guarantee, the Access Bank Guarantee submitted along with the
application shall be returned.
(g) Applicant may seek T-GNA under an Advance application or Exigency Application as per timelines
provided in the GNA Regulations for the purpose of injection in the Indian Grid or drawal of power
from the Indian Grid (drawal only for the purpose of startup power or auxiliary consumption). Each
application for T-GNA shall be accompanied by a non-refundable application fee of Rs. 5,000 along
with applicable taxes in Indian Rupees per application.
(h) The grant of GNA or T-GNA shall be limited to the quantum of connectivity granted.
(i) Applicant shall develop, operate, and maintain the dedicated transmission system up to the ISTS point,
along with associated bay(s) at the ISTS substation.
(j) Applicant shall submit one-time connectivity charges for Rs. One lakh per MW for the quantum of
connectivity granted one month prior to a physical connection to the Indian Grid.
(k) The one-time charges paid by such entity shall be adjusted in Monthly Transmission Charges under the
Sharing Regulations.
(l) In case the entity withdraws the connectivity and GNA (if any), the subsisting Application Bank
Guarantee and Access Bank Guarantee shall be encashed.
(m) Application Bank Guarantee shall be returned within one month of the effective date of GNA. If GNA
is not obtained for any capacity, the Application Bank Guarantee shall be returned after five years from
the date of connection with the Indian Grid.
(n) Access Bank Guarantee shall be returned in five equal parts over five years after the effective date of
GNA.
(o) The mode of operation of the dedicated transmission system connecting to the Indian Grid shall be as
per the Standard Operating Procedure (SOP) issued in this regard.
Annexure-II
(a) The transmission charges for the use of the Indian portion of the Cross Border Transmission Link
(CBTL) under Clause (2-i) of Regulation 7 of these regulations, if utilised for open access, shall be recovered in
the following manner:
(i) The capital cost of such Indian portion of CBTL shall be approved by the Commission, and
Yearly transmission charges (YTC) shall be determined for the full capacity of the Indian
portion of CBTL.
(ii) The YTC corresponding to the capacity under open access shall be determined on a pro-rata
basis. A per unit rate shall be determined by the NLDC considering the capacity under open access by
dividing the prorated YTC by the anticipated yearly energy transaction over the link for the
capacity under open access. Such anticipated yearly energy transactions shall be determined by
the Designated Authority. In case of uncertainty in the determination of energy transaction,
energy corresponding to surge impedance loading shall be used for the determination of per
unit rate.
(iii) The per unit rate shall be payable by the:
a. Participating entity drawing power through the CBTL based on scheduled drawal;
b. Participating entity injecting power into the Indian grid under collective transactions at
Indian Power exchanges using such CBTL shall also pay transmission charges for such
CBTL at a per unit rate as determined under sub-clause (ii) of this Clause.
(iv) Actual drawal over and above the approved access quantum shall be payable at 1.25 times the rate under
sub-clause (ii) of this Clause.
(v) Actual injection over and above approved access quantum shall be payable at 1.25 times the rate under
sub-clause (ii) of this Clause.
(vi) If over recovery of transmission charges on an annual basis is more than the approved tariff for the CBTL
(for the capacity under open access) for a block period of 5 years, the same shall be shared between in the
ratio of 20:80 between the owner of CBTL and entities that are scheduled for injection/drawal through the
CBTL under open access.
(b) The transmission charges for the use of the Indian portion of the Cross Border Transmission Link,
developed under Clause (2-ii) of Regulation 7 of these regulations shall be recovered in the following manner:
(i) The capital cost of such Indian portion of CBTL shall be approved by the Commission, and
Yearly transmission charges (YTC) shall be determined for the full capacity of the CBTL.
(ii) The capacity of such transmission system may be booked on a dedicated basis by
Participating entities, in which case YTC corresponding to such booked capacity shall be
paid by such Participating entity to such transmission licensee.
(iii) The YTC corresponding to the capacity under open access shall be determined on a pro-rata
basis. A per unit rate shall be determined by the NLDC, considering the capacity under open access by
dividing the prorated YTC by the anticipated yearly energy transaction over the link for the
capacity under open access. Such anticipated yearly energy transactions shall be determined by
the Designated Authority.
(iv) The per unit rate shall be payable by the:
a. Participating entity drawing power through the CBTL based on scheduled drawal;
b. Participating entity injecting power into the Indian grid under collective transactions at
Indian Power exchanges using such CBTL shall also pay transmission charges for such
CBTL at a per unit rate as determined under sub-clause (iii) of this Clause.
(v) Actual drawal over and above the approved access quantum shall be payable at 1.25 times the rate
under sub-clause (iii) of this Clause.
(vi) Actual injection over and above approved access quantum, shall be payable at 1.25 times the rate under
sub-clause (iii) of this Clause.
(vii) If the average recovery of transmission charges on an annual basis is more than the approved tariff for the
CBTL (for the capacity under open access) for a block period of 5 years, the same shall be shared in the
ratio of 20:80 between the owner of CBTL and entities that scheduled drawal through the CBTL.
(c) If agreed between governments of the two countries, and where the entity owning the portion of Cross
Border Transmission Link located in a neighbouring country approaches the Commission, the Tariff for a
portion of CBTL located in the neighbouring Country shall be determined by the Commission and, the steps
under sub-clauses (a) and (b) of this Annexure, as the case may be, shall be applicable for a portion of CBTL
located in the neighbouring country also. "
HARPREET SINGH PRUTHI, Secy.
[ADVT.-III/4/Exty./554/2025-26]
Note:
(1) The Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019,
were published on 14.05.2019 in Part III, Section 4 of the Gazette of India (Extraordinary) No. 160.
(2) The Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (First Amendment)
Regulations, 2023, were published on 26.12.2023 in Part III, Section 4 of the Gazette of India
(Extraordinary) No. 857.