Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-23072025-264902
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 3276]
NEW DELHI, MONDAY, JULY 21, 2025/ASHADHA 30, 1947
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 21th July, 2025
S.O. 3349(E).โ Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988), the Central
Government has entrusted the following stretches in the State of Assam to the National Highways Authority of India
(hereinafter referred to as the โAuthority"):
| Sl. No. | Stretch | Section | Entrustment notification published vide |
|-------|----------------------------------------------|-------------------------------------------------------------|-----------------------------------------|
| 1 | Km 146.000 to Km 156.500 of NH-37 | Guwahati Bypass section | S.O. 1192 (E) dated 03.12.2001 |
| 2 | Km 156.500 to km 164.395 of NH-37 | Guwahati Bypass section | S.O. 196 (E) dated 06.03.2000 |
| 3 | Km.164.395 to Km.274.000 of NH-37 | Nagaon to Guwahati section (including Guwahati Bypass) | S.0 465 (E) dated 26.04.2002 |
| 4 | Km.963.000 to Km.1126.000 of NH-31 | Guwahati to Nalbari Bijni section | S.0 465 (E) dated 26.04.2002 |
| 5 | Km 0.000 to Km 38.000 of NH-36 | Daboka to Nagaon | |
| 6 | Km 0.000 to Km 83.400 of NH-54 | Silchar to Haflong to Lanka to Daboka section | |
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter
referred to as the "rules"), and in supersession of the notification of the Government of India in the Ministry of Road
Transport and Highways number S.O. No.743 (E) dated 17th February, 2020, the Central Government hereby levies the
fee on the type of mechanical vehicles specified in column (1) of Table-1 below, at hundred percent of the rates specified
in column (2) of the Table 1 for net road length of 281.2219 km (Table-2) and for equivalent structure length (having
more than 60 m length) of 64.2905 km (having length of 6.42905 km, Table-4), and at one hundred and fifty percent of
the base rate for bypass having length of 45.02505 km (Table-3) costing rupees ten crore or more for use of four laning
of Nalbari-Bijni - Guwahati โ Nagaon-Lanka- Hatikhali Section from km 1040.300 to km 1124.514 on NH-31 (new
NH-27), km 146.000 to km 205.000 km on NH-37 (new NH-27); km 205.000 to km 273.489 of NH-37 (new NH-27),
km 0.321 to km 5.500 to km 37.894 of NH-36 (new NH-27), km 0.000 to km 83.400 of NH-54 (new NH-27) in the
State of Assam on EPC Mode and authorize the Authority to collect, either through its officials or through a contractor,
the said fee, as under:-
Table-1
| Type of vehicle | Base rate of fee per km for the base year 2007-08 (in Rupees) |
|-------------------------------------------------------------------------------|---------------------------------------------------------------|
| (1) | (2) |
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
| Bus or Truck (Two Axles) | 2.20 |
| Three-axle commercial vehicles | 2.40 |
| Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) | 3.45 |
| Oversized Vehicles (seven or more axles) | 4.20 |
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza(s) for net road length specified
for such fee plaza(s), namely:
Table-2
| S.No. | Location of Fee Plaza (chainage) | Chainages of section | Road Length (in km) for which Fee is payable | Rate at which fee is payable |
|-------|-----------------------------------------------------------------------------------------------------------------------------------------------|--------------------------------------------------------------------------------------------------------------------------|----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|---------------------------------------------------------------|
| 1 | At km 1104.624 (design chainage) near village Madanpur in Kamrup district of NH-31 (New NH-27) (FP-1) | From Km.1040.300 to Km. 1119.814 (Nalbari-Bijni to Guwahati) of NH-31 | 76.782 (Excluding 1.3644 Km of Bypass & 0.1956 km length of structure >60m on Bypass road and 1.172 Km. length of structure >60 m) | 100% for four or more lanes of the base rates mentioned in Table-1 |
| 2 | At km 179.600 near village Nazirakhat in Kamrup (M) district) of NH-37 (New NH-27) (FP-2) | From Km.1119.814 to Km. 1124.514 (Nalbari-Bijni to Guwahati) of NH-31 Km.146.000 to Km.205.000 (Guwahati to Nagaon section | 43.4479 (Excluding 17.5446 Km. of Bypass & 0.3504 Km. length of structure >60 m on Bypass road and 2.3571 Km. length of structure >60m) | 100% for four or more lanes of the base rates mentioned in Table-1 |
| 3 | At Km 254.514 on NH-27(New)/NH-37(Old) near town Raha (Saragaon) in dist Nagaon (FP-3) | From Km 205.00 to Km 273.489 of NH-37 | 56.9978 (Excluding 10.51525 Km. of Bypass & 0.24875 Km. length of structure >60 m on Bypass road and 0.7272 Km. length of structure >60 m on road length) | 100% for four or more lanes of the base rates mentioned in Table-1 |
| 4 | At Km 33.625 on NH-27(New)/NH-36(Old) near village Mikirati Hawgaon in dist Hojai (FP-4) | From Km 0.321 to Km 5.500 of NH-36 & Km 5.500 to Km 37.894 of NH-36, Km 0.00 to 22.00 of NH-54 | 49.8842 (Excluding 9.4408 Km. of Bypass & 0.1702 Km. length of structure >60 m on Bypass & 0.0778 km length of structure >60m on road length) | 100% for four or more lanes of the base rates mentioned in Table-1 |
| 5 | At Km 62.400 on NH-27(New)/NH-54(Old) near village Manderdisa in dist Dima Hasao (FP-5) | From Km 22.00 to Km 83.400 of NH-54 | 54.11 Km (Excluding 6.16 Km. of Bypass & 0.140 Km. length of structure >60 m on Bypass and 0.99 Km. length of structure >60 m on road length) | 100% for four or more lanes of the base rates mentioned in Table-1 |
| | Grand Total | | 281.2219 | |
2. In addition to above, the following fee shall also be due and payable for the use of the following bypasses costing
Rs.10 crore or more, at the following Fee Plaza, for the length of bypass specified for such Fee Plaza: -
Table-3
| Location of Toll Plaza (chainage) | Name of Bypass | Design Chainages | Length & Cost of bypass for which additional fee is payable | Rate at which fee is payble |
|------------------------------------------------------------------------------------------------------------------------------------------------|------------------------------------------------------------------------------------|---------------------------------------------------------------------------------------------------------------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-------------------------------------------------------------------------------------------------------------------------------|
| | | Taking off at | Merging at | Length (in Km) | Cost (in Rs. Crore) |
| At km 1104.624 (design chainage) near village Madanpur in Kamrup district of NH-31 (New NH-27) (FP-1) | Baihata | Km. 1099.254 | Km. 1100.814 | 1.3644 (excluding 0.1956 km length of structures falling in such bypass of 1.56 Km) | 24.586 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| At km 179.600 near village Nazirakhat in Kamrup (M) district) of NH-37 (New NH-27) (FP-2) | Guwahati | Km. 146.000 | Km. 163.895 | 17.5446 (excluding 0.3504 Km length of structures falling in such bypass of 17.895 Km) | 185.14 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| At Km 254.514 on NH-27(New)/NH-37(Old) near town Raha (Saragaon) in dist Nagaon (FP-3) | Nagaon of NH-37(Old)/ NH-27 (New) | Km 262.725 | Km 273.489 | 10.51525 (excluding 0.24875 Km length of structures falling in such bypass of 10.764 Km) | 186.281 (For part of Nagaon Bypass i.e. under Raha Toll Plaza) | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| At Km 33.625 on NH-27 (New)/NH-36 (Old) near village Mikirati Hawgaon in dist Hojai (FP-4) | Nagaon of NH-36 (Old) / NH -27 (New) | Km 0.321 | Km 5.500 | 5.082 (excluding 0.097 Km length of structures falling in such bypass of 5.179 Km) | 89.627 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| | Daboka | Km 35.862 of NH-36 | Km 37.894 of | 4.3588 (excluding 0.0732 km length of structures falling in such bypass of 4.432 km) | 60.255 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| (Old)/NH-27 (New) and Km.0.000 of NH-54 | | | 36 (Old)/NH-27 (New) and NH-Km.2.400 of NH-54 | | |
| At Km 62.400 on NH-27 (New)/NH-54 (Old) near village Manderdisa in dist Dima Hasao (FP-5) | Lanka of NH-54 (Old) / NH-27 (New) | Km 22.337 | Km 26.937 | 4.60 | 47.612 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| (Old) near village Manderdisa in dist Dima Hasao (FP-5) | Lumdig of NH-54 (Old) / NH -27 (New) | Km.56.900 | Km 58.600 | 1.56 (excluding 0.140 km length of structures falling in such bypass of 1.700 km) | 30.260 | 150% for four or more lanes of the base rates mentioned at Table-1 above |
| Total | | | | 45.02505 | |
3. In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60 m at the following fee plaza(s), by converting the length of structures into an equivalent length of
highway by multiplying the length of such structures by an equalisation factor of 10: -
Table-4
| Location of Toll Plaza (chainage). | Length of structures (in km) to be converted into equivalent road length. | Equivalent Road length (in km). | Rate at which fee is payable. |
|-------------------------------------------------------------------------------------------------------------------------------------------------|---------------------------------------------------------------------------|---------------------------------|---------------------------------------------------------------|
| At km 1104.624 (design ch.) near village Madanpur in Kamrup district of NH-31 (New NH-27) (FP-1). | 1.3676* | 13.676 | 100% for four Or more lanes Of the base rates mentioned in Table-1above |
| At km 179.600 near village Nazirakhat in Kamrup (M) district of NH-37 (New NH-27) (FP-2). | 2.7075** | 27.075 | 100% for four Or more lanes Of the base rates mentioned in Table-1above |
| At Km 254.514 on NH-27 (New)/NH-37 (Old) near town Raha (Saragaon) in dist. Nagaon (FP-3). | 0.97595*** | 9.7595 | 100% for four Or more lanes Of the base rates mentioned in Table-1above |
| At Km 33.625 on NH-27 (New)/NH-36 (Old) near village Mikirati Hawgaon in dist. Hojai (FP-4). | 0.2480**** | 2.480 | 100% for four Or more lanes Of the base rates mentioned in Table-1above |
| At Km 254.514 on NH-27 (New)/NH-37 (Old) near town Raha (Saragaon) in dist. Nagaon (FP-3). | 1.13***** | 11.3 | 100% for four Or more lanes Of the base rates mentioned in Table-1above |
| Total length | 6.42905 | 64.2905 | |
\*Details of structure under FP-1 having length more than 60 m is as under:
| S.No. | Chainage (Km.) From | Chainage (Km.) To | Type of structure | Length(Km.) |
|-------|---------------------|-------------------|-------------------|-------------|
| 1 | 1059.7670 | 1059.8430 | Bridge | 0.0760 |
| 2 | 1066.2370 | 1066.3570 | Bridge | 0.1200 |
| 3 | 1068.2880 | 1068.3680 | Bridge | 0.0800 |
| 4 | 1082.7730 | 1083.0890 | ROB | 0.3160 |
| 5 | 1083.6460 | 1083.7260 | Bridge | 0.0800 |
| 6 | 1092.3680 | 1092.4880 | Bridge | 0.1200 |
| 7 | 1099.5011 | 1099.5989 | Flyover | 0.0978 |
| 8 | 1100.6011 | 1100.6989 | Flyover | 0.0978 |
| 9 | 1113.3680 | 1113.7480 | ROB | 0.3800 |
| | Total | | | 1.3676 |
\*\*Details of structure under FP-2 having length more than 60m is as under:
| S.No. | Chainage(Km.) From | Chainage(Km.) To | Type of structure | Length(Km.) |
|-------|--------------------|------------------|-------------------|-------------|
| 1 | 1121.851 | 1121.995 | Viaduct | 0.1440 |
| 2 | 1121.9957 | 1123.4892 | Bridge | 1.4935 |
| 3 | 1123.489 | 1123.597 | Viaduct | 0.1080 |
| 4 | 1124.6076 | 1124.8514 | Grade separator | 0.2438 |
| 5 | 150.5302 | 150.6178 | Flyover | 0.0876 |
| 6 | 152.9492 | 153.0368 | Flyover | 0.0876 |
| 7 | 157.0892 | 157.1768 | Flyover | 0.0876 |
| 8 | 161.9322 | 162.0198 | Flyover | 0.0876 |
| 9 | 164.3420 | 164.4480 | Flyover | 0.1060 |
| 10 | 183.6031 | 183.7430 | Bridge | 0.1399 |
| 11 | 184.5041 | 184.6260 | Bridge | 0.1219 |
| | Total | | | 2.7075 |
\*\*\*Details of structure under FP-3 having length more than 60 m is as under:
| S.No. | Chainage (Km.) From | Chainage (Km.) To | Type of structure | Length of structures(in km) to be converted into equivalent road length |
|-------|---------------------|-------------------|-------------------|-----------------------------------------------------------------------|
| 1 | 216.377 | 216.466 | Major Bridge | 0.0890 |
| 2 | 219.9748 | 220.0772 | Major Bridge | 0.1024 |
| 3 | 231.0046 | 231.1474 | Major Bridge | 0.1428 |
| 4 | 250.748 | 250.823 | Major Bridge | 0.0750 |
| 5 | 251.6665 | 251.7335 | Flyover | 0.0670 |
| 6 | 252.77575 | 252.83825 | Major Bridge | 0.0625 |
| 7 | 254.2859 | 254.3461 | Major Bridge | 0.0602 |
| 8 | 261.2665 | 261.3335 | Flyover | 0.0670 |
| 9 | 261.97935 | 262.04065 | Major Bridge | 0.0613 |
| 10 | 266.549 | 266.669 | Major Bridge | 0.1200 |
| 11 | 273.3356 | 273.4644 | Flyover | 0.12875 |
| | Total | | | 0.97595 |
\*\*\*\*Details of structure under FP-4 having length more than 60 m is as under:
| S.No. | Chainage(Km.) From | Chainage(Km.) To | Type of structure | Length of structures (in km) to be converted into equivalent road length |
|-------|--------------------|------------------|-------------------|-----------------------------------------------------------------------|
| 1 | 2.1015 | 2.1985 | ROB | 0.097 |
| 2 | 1.9814 | 2.0546 | Major Bridge | 0.0732 |
| 3 | 20.6611 | 20.7389 | Flyover | 0.0778 |
| | Total | | | 0.2480 |
\*\*\*\*Details of structure under FP-5 having length more than 60 m is as under:
| S.No. | Chainage(Km.) From | Chainage(Km.) To | Type of structure | Length of structures (in km) to be converted into equivalent road length |
|-------|--------------------|------------------|-------------------|-----------------------------------------------------------------------|
| 1 | 44.875 | 45.075 | Major Bridge | 0.200 |
| 2 | 51.575 | 51.715 | Major Bridge | 0.140 |
| 3 | 57.330 | 57.470 | Major Bridge | 0.140 |
| 4 | 58.585 | 58.855 | ROB | 0.270 |
| 5 | 61.585 | 61.685 | Major Bridge | 0.100 |
| 6 | 69.485 | 69.765 | Major Bridge | 0.280 |
| | Total | | | 1.130 |
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and
resides within a distance of twenty kilometers from the fee plaza is Rs.350 (Rupees Three Hundred and Fifty only) for
the year 2025-26 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table-5
| Amount Payable | Maximum number of one way journeys allowed | Period of validity |
|--------------------------------------------------------------------|--------------------------------------------|-------------------------------------------|
| One and half times of the fee for one way journey | Two | Twenty four hours from the time of payment |
| Two-third of amount of the fee payable for fifty single journeys | Fifty | One month from date of payment |
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee
plaza falls shall be 50% of the specified rate for that category of vehicle, provided no service road or alternative road is
available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in Sub-rule 1A of rule 10 of the said rules and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service
road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said Rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of completed length of the section and revised annually in accordance with the Rule 5 of the said rules and the
same shall be published in at least one newspaper, in English and vernacular language.
11. The estimated capital cost of the project is Rupees 6299.528 Crores. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. CODIV-13019/1/2024-PIU Guwahati/E-238423]
VINAY KUMAR, Addl. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.