Full Text
3558 GI/202 6 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 2455] NEW DELHI, MON DAY, MAY 1 8, 2026/VAISAKHA 28, 1948
CG-DL-E-22052026-272759
(1) )2 (
(1) (2) (3) (4)
125%* 2. दकमी.28+868
3. दकमी.47+240
4. दकमी.57+880
5. दकमी.67+216
6. दकमी. 70+730
.0+000,
9+400
से दकमी 0.000 28.868 47.240 57.880 67.216 84.709
पर िुल्क प्लाजा 0.000 0.000 28.393 46.440 57.080 65.561 81.902
िुल्क प्लाजा 28.868 28.393 0.000 18.047 28.687 37.168 53.509
पर िुल्क प्लाजा 47.240 46.440 18.047 0.000 10.640 19.121 35.462
पर िुल्क प्लािा 57.880 57.080 28.687 10.640 0.000 8.481 24.822
पर िुल्क प्लािा 67.216 65.561 37.168 19.121 8.481 0.000 16.341
प्लािा 84.709 81.902 53.509 35.462 24.822 16.341 0.000
(1) (2) (3) (4) (5)
1. दकमी. 9+400
125%*
2. दकमी. 28+868
3. दकमी. 47+240
28+868
से दकमी 0.000 28.868 47.240 57.880 67.216 84.709
पर िुल्क प्लाजा 0.000 0.000 0.475 0.800 0.800 1.655 2.807
पर िुल्क प्लािा 28.868 0.475 0.000 0.325 0.325 1.180 2.332
पर िुल्क प्लािा 47.240 0.800 0.325 0.000 0.000 0.855 2.007
पर िुल्क प्लािा 57.880 0.800 0.325 0.000 0.000 0.855 2.007
िुल्क प्लािा 67.216 1.655 1.180 0.855 0.855 0.000 1.152
िुल्क प्लाजा 84.709 2.807 2.332 2.007 2.007 1.152 0.000
0+971(आरएचएस) 0.078 0.780
0.126
5. दकमी. 67+216
6. दकमी. 70+730
3 आरओबी 20+719 0.093 0.930
आरओबी 31+410 0.172
[0.160
0.184
6 बड़ा पुल 32+410 0.153 1.530
8 बड़ा पुल 61+000 0.105 1.050
9 बड़ा पुल 69+315 0.413 4.130
11 बड़ा पुल 78+110 0.375 3.750
12 बड़ा पुल 81+492 0.200 2.000
13 फ्लाईओवर 83+202 0.063 0.630
कुल 2.807 28.070
0+000,
9+400
से दकमी 0.000 28.868 47.240 57.880 67.216 84.709
पर िुल्क प्लाजा 0.000 0.000 33.143 54.440 65.080 82.111 109.972
पर िुल्क प्लाजा 28.868 33.143 0.000 21.297 31.937 48.968 76.829
पर िुल्क प्लाजा 47.240 54.440 21.297 0.000 10.640 27.671 55.532
पर िुल्क प्लाजा 57.880 65.080 31.937 10.640 0.000 17.031 44.892
पर िुल्क प्लाजा 67.216 82.111 48.968 27.671 17.031 0.000 27.861
प्लाजा 84.709 109.972 76.829 55.532 44.892 27.861 0.000
1 0+000
2 28+868
(28.868) दकमी. 28+868
3 47+240
(47.240) दकमी. 47+240
4 57+880
(57.880) दकमी. 57+880
5 67+216
(67.216) दकमी. 67+216
1 84+709
2 67+216
(67.216) दकमी. 67+216
3 57+880
(57.880) दकमी. 57+880
4 47+240
(47.240) दकमी. 47+240
5 28+868
(28.868) दकमी.28+868
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 18th May, 2026
S.O. 2547(E).—Whereas by Gazette notification of the Government of India in the Ministry of Road
Transport and Highways number S.O. 5578 (E) dated 27.12.2024 issued under section 11 of the National Highways
Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch of NE -8 starting from its
junction with Sardar Patel Ring Road near Visalpur (Ahmedabad) connecting Tajpur, Bhat, Vasna Chacharavadi,
Kavitha, Chaloda, Juval Roopvati, Sindhrej, Lana, Jalalpur (Godhneshwar), Sarandhi, Kariyana, Rupgadh,
Keshargadh, Vejalka, Saragvala, Bholad, Anandpur, Valinda, Ambali, Dholera, Sandhida, Hebatpur and terminating
at its junction with NH -751 near Adhelai in the state of Gujarat to the National Highways Authority of India (herein
after referred to as the “Authority”).
And whereas, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008,
(hereinafter referred to as the "Rules"), the Central Government by notification of the Government of India number
S.O. 2135 (E) dated 13th May, 2025 authorized Authority for levying and collecting fee on mechanical vehicles for
the section from Km. 0+000 to Km.84+709 of National Expressway no. NE -8 in the state of Gujarat;
Now, upon provision of additional Interchange at Km.57.880 of National Expressway no. NE -8 and in
supersession of the notification bearing number S.O. 2135 (E) dated 13th May, 2025, the Central Government, hereby
levies the fee on mechanical vehicles at 125% of the rate specified in Column (2) of the Table 1 (hereinafter referred
to as “ base rate”) for net road section length of 81.902 Km [Table -3] and for equivalent structure length (having
length more than 60m) of 28.070 km (having length of 2.807 km [Table -5]), for the use of 4 lane section on the Type
of Vehicles specified in Column (1) of the Table 1 below for the use of section from Km. 0+000 to Km.84+709 of
NE-8 in the State of Gujarat and authorises the Authority to collect, either through its officials or through a contractor,
the said fee, namely: -
Table 1
Type of vehicle Base rate of fee per Km
for the
Base Year 2007 -08 (in
Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods
Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or Multi Axle
Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the following Fee Plaza (s) for net road
length specified between any two such Fee Plaza (s).
*The Authority shall ensure that the user fee levied and collected at the above Fee Plaza(s) shall be in accordance
with sub -rule (7) of Rule 4 of the said rules, including the proviso inserted by G.S.R. 107 (E) dated 04.02.2026.
Table 3
Distance matrix for net road length (Excluding length of structures >60 m)
To Starting point:
Km.0+000, Fee
plaza @ Fee plaza @
Km.28+868 Fee plaza @
Km.47+240 Fee plaza @
Km.57+880 Fee plaza @
Km.67+216 End point:
Km.84+709, Fee
plaza @ Table -2
Sl.
No. Location of Fee Plaza (chainage) Length (in Km) for which fee is
payable (Excluding Structures >
60m length) Rate at which fee
is payable
(1) (2) (3) (4)
3. Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)
as per the distance matrix in Table
No. 3 below 125%* of the base
rates mentioned in
Table No. - 1
above. 3. Km.28+868
(Interchange Toll Plaza)
(Jalalpur - Godhaneshvar Village in
Ahmedabad District)
4. Km.47+240
(Interchange Toll Plaza)
(Vejalka Village in Ahmedabad District)
5. Km.57+880
(Interchange Toll Plaza)
(Bholad Village in Ahmedabad District)
6. Km.67+216
(Interchange Toll Plaza)
(Pipli Village in Ahmedabad District)
7. Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District)
Km.9+400 Km.70+730
From Km 0.000 28.868 47.240 57.880 67.216 84.709
Starting point:
Km.0+000, Fee
plaza @
Km.9+400 0.000 0.000 28.393 46.440 57.080 65.561 81.902
Fee plaza @
Km.28+868 28.868 28.393 0.000 18.047 28.687 37.168 53.509
Fee plaza @
Km.47+240 47.240 46.440 18.047 0.000 10.640 19.121 35.462
Fee plaza @
Km.57+880 57.880 57.080 28.687 10.640 0.000 8.481 24.822
Fee plaza @
Km.67+216 67.216 65.561 37.168 19.121 8.481 0.000 16.341
End point:
Km.84+709, Fee
plaza @
Km.70+730 84.709 81.902 53.509 35.462 24.822 16.341 0.000
2. In addition to the above, the following fee shall also be due and payable for the use of the following structures
having a length more than 60 m at the following toll plaza, by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10:
Table -4
SL.
No. Location of Fee Plaza
(chainage) Length (in Km) for which
fee is payable Equivalent road
length (in km) Rate at which fee is
payable
(1) (2) (3) (4) (5)
1. Km.9+400
(Main Expressway Fee
Plaza)
(Bhat Village in Ahmedabad
District)
As per the distance matrix
for structures > 60 m length
at Table 5 below 10 times of the
distance as per
col.3 125%* of the base rates
mentioned in Table No.
- 1 above.
2. Km.28+868
(Interchange Toll Plaza)
(Jalalpur - Godhaneshvar
Village in Ahmedabad
District)
3. Km.47+240
(Interchange Toll Plaza)
(Vejalka Village in
Ahmedabad District)
4. Km.57+880
(Interchange Toll Plaza)
(Bholad Village in
Ahmedabad District)
5. Km.67+216
(Interchange Toll Plaza)
(Pipli Village in Ahmedabad
District)
6. Km.70+730
(Main Expressway Fee
Plaza)
(Valinda Village in
Ahmedabad District)
*The Authority shall ensure that the user fee levied and collected at the above Fee Plaza(s) shall be in accordance
with sub -rule (7) of Rule 4 of the said rules, including the proviso inserted by G.S.R. 107 (E) dated 04.02.2026.
Table - 5
Distance matrix for road length of structures^ (> 60m length) between Fee Plazas
To Starting
point:
Km.0+000,
Fee plaza @
Km.9+400 Fee plaza @
Km.28+868 Fee plaza @
Km.47+240 Fee plaza @
Km.57+880 Fee plaza @
Km.67+216 End point:
Km.84+709, Fee
plaza @
Km.70+730
From Km 0.000 28.868 47.240 57.880 67.216 84.709
Starting point:
Km.0+000, Fee
plaza @
Km.9+400 0.000 0.000 0.475 0.800 0.800 1.655 2.807
Fee plaza @
Km.28+868 28.868 0.475 0.000 0.325 0.325 1.180 2.332
Fee plaza @
Km.47+240 47.240 0.800 0.325 0.000 0.000 0.855 2.007
Fee plaza @
Km.57+880 57.880 0.800 0.325 0.000 0.000 0.855 2.007
Fee plaza @
Km.67+216 67.216 1.655 1.180 0.855 0.855 0.000 1.152
End point:
Km.84+709, Fee
plaza @
Km.70+730 84.709 2.807 2.332 2.007 2.007 1.152 0.000
^Details of structures having lengths more than 60m are as under:
Table - 5A
S. No. Type of structure Design Km Length of structure in Km Equivalent Road length in Km
(a) (b) (c) (d) (e) = (d) X 10
Package -1 Major Bridge 1+024(LHS)
0+971(RHS) 0.078 0.780
2 ROB 5+695 (LHS)
5+682(RHS)
0.126
[0.104 (LHS), 0.147 (RHS)] 1.260
3 ROB 20+719 0.093 0.930
Package -2 Major Bridge 22+561(LHS)
22+547(RHS) 0.178
[0.165 (LHS), 0.191 (RHS)] 1.780
ROB 31+410 0.172
[0.160
(LHS),
0.184
(RHS)] 1.720
6 Major Bridge 32+410 0.153 1.530
Package -3 Major Bridge 60+150 0.750 7.500
8 Major Bridge 61+000 0.105 1.050
9 Major Bridge 69+315 0.413 4.130
10 Package – 4 Major Bridge 77+083 0.101 1.010
11 Major Bridge 78+110 0.375 3.750
12 Major Bridge 81+492 0.200 2.000
13 Flyover 83+202 0.063 0.630
Total 2.807 28.070
3. The net effective length for which the fee shall be due and payable is as under:
Table 6
Distance matrix for total tollable road length (Including equivalent length of structures >
60 m length)
To Starting point:
Km.0+000, Fee
plaza @ Km.9
+400 Fee plaza
@ Km.28
+868 Fee plaza
@ Km.47
+240 Fee plaza
@ Km.57
+880 Fee plaza
@ Km.67
+216 End point: Km.84+
709, Fee plaza @ K
m.70+730
From Km 0.000 28.868 47.240 57.880
67.216 84.709
Starting point: Km.
0+000, Fee plaza @
Km.9+400 0.000 0.000 33.143 54.440 65.080 82.111 109.972
Fee plaza @ Km.28
+868 28.868 33.143 0.000 21.297 31.937 48.968 76.829
Fee plaza @ Km.47
+240 47.240 54.440 21.297 0.000 10.640 27.671 55.532
Fee plaza @ Km.57
+880 57.880 65.080 31.937 10.640 0.000 17.031 44.892
Fee plaza @ Km.67
+216 67.216 82.111 48.968 27.671 17.031 0.000 27.861
End point: Km.84+7
09, Fee plaza @ Km
.70+730 84.709 109.972 76.829 55.532 44.892 27.861 0.000
4. The various types of traffic movements for which the user fee will be charged on the basis of the actual distance
traveled is as under:
Table 7a - Traffic plying on LHS from Ahmedabad to Dholera
S/No. Km
(length) Entry From Exit To
1 0+000
(0.000) Km.0+000 (starting point)
{The entry from Km.0+000 (starting
point) shall be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)} Jalalpur - Godhaneshvar Interchange at Km.28+868
Vejalka Interchange at Km.47+240
Bholad Interchange at Km.57+880
Pipli Interchange at Km.67+216
Exit at interchanges in DSIR at Km.74+974, Km.80+580
and Km.84+709
{The exit from interchanges in DSIR at Km.74+974,
Km.80+580 and Km.84+709 shall be recorded at
Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length up to Km.84+709 for exit from said 03
interchanges}
2 28+868
(28.868) Km.28+868
(Interchange Toll Plaza)
(Jalalpur - Godhaneshvar Village in
Ahmedabad District) Vejalka Interchange at Km.47+240
Bholad Interchange at Km.57+880
Pipli Interchange at Km.67+216
Exit at interchanges in DSIR at Km.74+974, Km.80+580
and Km.84+709
{The exit from interchanges in DSIR at Km.74+974,
Km.80+580 and Km.84+709 shall be recorded at
Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length up to Km.84+709 for exit from said 03
interchanges}
3 47+240
(47.240) Km.47+240
(Interchange Toll Plaza)
(Vejalka Village in Ahmedabad
District) Bholad Interchange at Km.57+880
Pipli Interchange at Km.67+216
Exit at interchanges in DSIR at Km.74+974, Km.80+580
and Km.84+709
{The exit from interchanges in DSIR at Km.74+974,
Km.80+580 and Km.84+709 shall be recorded at
Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length up to Km.84+709 for exit from said 03
interchanges}
4 57+880
(57.880) Km.57+880
(Interchange Toll Plaza)
(Bholad Village in Ahmedabad
District) Pipli Interchange at Km.67+216
Exit at interchanges in DSIR at Km.74+974, Km.80+580
and Km.84+709
{The exit from interchanges in DSIR at Km.74+974,
Km.80+580 and Km.84+709 shall be recorded at
Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length up to Km.84+709 for exit from said 03
interchanges}
5 67+216
(67.216) Km.67+216
(Interchange Toll Plaza)
(Pipli Village in Ahmedabad District) Exit at interchanges in DSIR at Km.74+974, Km.80+580
and Km.84+709
{The exit from interchanges in DSIR at Km.74+974,
Km.80+580 and Km.84+709 shall be recorded at
Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length up to Km.84+709 for exit from said 03
interchanges}
Table 7b - Traffic plying on RHS from Dholera to Ahmedabad
S/No. Km
(length) Entry From Exit To
1 84+709
(84.709) Entry from interchanges in DSIR at Km.84+709,
Km.80+580 and Km.74+974
{The Entry from interchanges in DSIR at
Km.84+709, Km.80+580 and Km.74+974
shall be recorded at Km.70+730
(Main Expressway Fee Plaza)
(Valinda Village in Ahmedabad District) considering
influence length from Km.84+709 for entry from said
03 interchanges} Pipli Interchange at Km.67+216
Bholad Interchange at Km.57+880
Vejalka Interchange at Km.47+240
Jalalpur - Godhaneshvar Interchange at
Km.28+868
Km.0+000 (starting point)
{The exit from Km.0+000 (starting point) shall
be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)}
2 67+216
(67.216) Km.67+216
(Interchange Toll Plaza)
(Pipli Village in Ahmedabad District) Bholad Interchange at Km.57+880
Vejalka Interchange at Km.47+240
Jalalpur - Godhaneshvar Interchange at
Km.28+868
Km.0+000 (starting point)
{The exit from Km.0+000 (starting point) shall
be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)}
3 57+880
(57.880) Km.57+880
(Interchange Toll Plaza)
(Bholad Village in Ahmedabad District) Vejalka Interchange at Km.47+240
Jalalpur - Godhaneshvar Interchange at
Km.28+868
Km.0+000 (starting point)
{The exit from Km.0+000 (starting point) shall
be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)}
4 47+240
(47.240) Km.47+240
(Interchange Toll Plaza)
(Vejalka Village in Ahmedabad District) Jalalpur - Godhaneshvar Interchange at
Km.28+868
Km.0+000 (starting point)
{The exit from Km.0+000 (starting point) shall
be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)}
5 28+868
(28.868) Km.28+868
(Interchange Toll Plaza)
(Jalalpur - Godhaneshvar Village in Ahmedabad
District) Km.0+000 (starting point)
{The exit from Km.0+000 (starting point) shall
be recorded at Km.9+400
(Main Expressway Fee Plaza)
(Bhat Village in Ahmedabad District)}
5. The vehicle entering the project highway will be recorded at the Entry fee Plaza and user Fee will be collected at
Exit Fee Plaza for the road section used by the vehicle between Entry and Exit Fee Plazas as per details mentioned
under para (4).
6. For multiple journeys on the highway section, passes shall be issued at the following rates, namely:
Table -8
Amount Payable Maximum number of one - way
journeys allowed Period of Validity
One and half times of the fee for one -way
journey* Two Twenty -four hours from the
time of payment
Two-third of amount of the fee payable
for fifty single journeys* Fifty One month from date of
payment
* Provided that the user uses the same entry and exit fee plazas while performing the return journey.
7. The driver or owner or a perso n in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in rule 10 of the said rules.
8. All definitions including the category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the rules.
9. The fee rates shall be displayed for the information of the users in accordance with rule 12 of the said rules.
10. Based on the Base rate of fee per km for the base year 2007 -08 as mentioned in Table 1 above, the actual amount
of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of
the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same
shall be published in at least one newspaper, each in English and vernacular language accordingly.
11. The estimated capital cost of the project is Rs. 4798.24 Cr. The capital cost is subject to variation as the activities
of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of
the recovery of capital cost through user fees realised.
[F. No. CODIV -13018/1/2024 -PIU Ahmedabad/ E -248301 ]
CHETNA NAND SINGH , Jt. Secy .
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text