MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 20th March , 2024
S.O. 1502(E).—Whereas by notification of the Government of India in the Minist ry of Road Transport and
Highways number S.O. 30(E), dated the 5th January, 2017, issued under Section 11 of the National Highways
Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from km 199.2 to km
543.560 of NH -6 in the state of Jharkhand / Odisha to the National Highways Authority of India (hereinafter referred
to as the “Authority”);
And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988
(68 of 1988), the Authority has entered into an Agreement (hereinafter referred to as said agreement) with M/s
Malayagiri Highways Private Limited, having its registered office at B -376, Upper Ground Floor, Ni rman Vihar, New
Delhi – 110 092, (hereinafter referred to as the “Concessionaire”), on 13.01.2024 for the Tolling, Operation,
Maintenance and Transfer (ToT mode) of four lane Binjhabahal -Teleibani Section from km 414.982 to km 493.300
(Project length 78.31 8 km) of National Highway number 49 in the state of Odisha (hereinafter referred to as the said
section) of the National Highway.
Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 [GSR 838
(E) dt. 05.12.2008] read along with National Highways Fee (Determination of Rates and Collection) Amendment
Rules, 2010 [GSR 950(E) 03.12.2010], National Highw ays Fee (Determination of Rates and Collection) Amendment
Rules, 2011 [GSR 15(E) 12.01.2011], National Highways Fee (Determination of Rates and Collection) Second
Amendment Rules, 2011 [GSR 756 (E) 12.10.2011], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2013 [GSR 778(E) 16.12.2013], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2014 [GSR 26(E) 16.01.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2014 [GSR 831(E) 21.11.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rules, 2014 [GSR 02(E) 29.12.2014], National Highways Fee (Determination of Rates and Collection)
Amendment Rules 2015 [GSR 220(E) 23.03.2015], National Highwa ys Fee (Determination of Rates and Collection)
Amendment Rules 2016 [GSR 585(E) 08.06.2016], National Highways Fee (Determination of Rates and Collection)
Amendment Rules 2016 [GSR 1114(E) 02.12.2016], The National Highways Fee (Determination of Rates and
Collection) Amendment Rules, 2017 [GSR 248(E) 14.03.2017] , The National Highways Fee (Determination of Rates
and Collection) Amendment Rules, 2018 [GSR 427(E) 07.05.2018], The National Highways Fee (Determination of
Rates and Collection) Amendment Rules, 2018 [GSR 920(E) 25.09.2018], The National Highways Fee
(Determination of Rates and Collection) Amendment Rules, 2019 [GSR 942(E) 20.12.2019], The National Highways
Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 298(E) 15.05.2020], The National
Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 523(E) 24.08.2020], The
National Highways Fee (Determination of Rates and Collection) Amendment Rules, 2020 [GSR 804(E)
30.12.2020],and any other amendments till bid due date and in supersession of the Notification Number S.O. No.
1951(E) dated 24th May, 2021 except as respect things done or omitted to be done before such supersession, the
Central Government, having regard to the expenditure involved in building, m aintenance, management and operation
of the said Section of said National Highway, interest on the capital invested, reasonable return, the volume of traffic
and the period of said agreement entered between the Authority and the Concessionaire, hereby noti fies that there
shall be levied and collected fees on mechanical vehicles at the rate specified in column (2) of the Table 1 for total
length of 78.318 km [including 71.157 km net road length, 5.274 km net bypass length and 1.887 km structures
(having le ngth more than 60m) with equivalent length of 18.870 km] (hereinafter called as the “base rate”), on the
type of vehicles specified in column (1) of the Table 1 below and authorizes the said Concessionaire to collect and
retain the fee on and from the Appo inted Date or publication of this Notification in the Official Gazette, whichever is
later, till the date of termination as specified in the agreement. This fee notification shall be effective from the
Appointed Date of the ToT project.
Table 1
Type of ve hicle Base rate of fee per km for NH
section of four or more lanes for
the base year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck ( Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) or
Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected h ereunder shall be due and payable at the following Fee Plaza for the net
road length specified for such Fee Plaza:
Location of Toll Plaza Length (in km) for which Fee is Payable Rate at which Fee is
payable
At Design Km 439.515 of New NH -49
near Bideibadk udar village in Deogarh
District of Odisha. 71.157
(Excluding 5.274 km length of bypass and
1.887 km length of structure) 100% for four more lane,
of the base rates as per
Table -I below
2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs. 10
crore or more at the following fee plaza for net bypass length specified for such fee plaza:
Location of fee plaza Length (in km) for which Fee is
Payable Rate at which Fee is payable
At Design Km 4 39.515 of New NH -49
near Bideibadkudar village in Deogarh
District of Odisha. 5.274
(Excluding 0.196 km length of
structure) 150% for four more lane, of the base
rates as per Table -I below
The details of Bypass (> 10 Cr) are as under:
Location of fee pl aza From Chainage
(km) To Chainage (km) Name of Bypass Total Length (km)
At Design Km 439.515 of New
NH-49 near Bideibadkudar village
in Deogarh District of Odisha. 475.060 480.530 Deogarh Bypass 5.274
Total Length (km) 5.274
3. In addition t o above, the following fee shall also be due and payable for the use of the following structures
having length more than 60 m at the following toll plaza, by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10:
Location of fee plaza Length of structures (km) of
Road Length to be converted
into equivalent road length Total equivalent road
length (km) Rate at which fee is
payable
At Design Km 439.515 of New
NH-49 near Bideibadkudar village
in Deogarh District of Odisha. 1.887^ 18.870 100% for four more
lane, of the base rates
as per Table -I below
^The details of 4 lane structures (> 60 m length) are as under: -
Chainage (km) Type of Structure Length (km)
422.38 5 Flyover 0.196
423.074 Major Bridge 0.084
429.514 Major Bridge 0.082
443.923 Major Bridge 0.065
447.260 Major Bridge 0.656
448.270 Flyover om 0.196
463.665 Major Bridge 0.064
464.477 Major Bridge 0.080
479.897 Flyover 0.196
489.322 Major Bridge 0.072
492.435 Flyover 0.196
Total 1.887
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial
purposes and resides within a distance of twenty kilometers from the fee plaza is Rs. 330.00 (Rupees Three Hundred
Thirty only) for the year 2023 -24 which is subject to revision every year as per the provisions of the National
Highways Fee (Determination of Rates and Collection) Rules, 2008.
5. For multiple journeys on the highway section, pas ses shall be issued at the following rates, namely;
Amount Payable Maximum number of one way
journeys allowed Period of validity
One and half times of the fee for one way
journey Two
Twenty four hours from the time of
payment
Two-third of amount of the fee payable for
fifty single journeys Fifty One month from date of payment
6. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district where
the fee plaza falls shall be 50% of the prescribed rat e for that category of vehicle provided no service road or
alternative road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load spec ified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be
entitled to make use of th e highway section unless the excess load has been removed from such mechanical vehicle.
Percentage of excess load over Maximum
Permissible Gross Vehicular Weight Multiplying Factor to the base
rate Fees
(1) (2) (3)
0% to 20% Two [(Fees applicable for suc h category of
>20% to 40% Four mechanical vehicle under sub -rule (2)
of rule 4) x (Multiplying factor)] >40% to 60% Six
>60% to 80% Eight
>80% and above Ten
8. All definitions including category of mechanical vehicles, its permissible l oad, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the Rules.
9. The Fee rates shall be displayed for information of the users in accordance with rules 12 of the said Rules.
10. Based on the Base Rate of Fee per km for the base year 2007 -08 as mentioned in Table -1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of completed length of the Project Highway. The same shall be got published by the Authority through the
Concessionaire in at least one newspaper, each in English and vernacular language and thereafter revised annually in
accordance with the rule 5 of the said rules and provisi on of Concession Agreement and got published, provided that
no revision shall be effected within a period of 6 (six) months from the date of the preceding revision of Fee.
[F. No. NHAI/Fin/TOT/2023 -24/TOT14/FeeNotification/Binjhabahal -Teleibani/E -234627 ]
SUMAN PRASAD SINGH , Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text