Gazette Tracker
Gazette Tracker

Core Purpose

Amends notification S.O. 5415(E) regarding toll fee collection on National Highway 11, revising fee calculation tables due to project changes.

Detailed Summary

This notification amends the Ministry of Road Transport and Highways' notification S.O. 5415(E) dated December 27, 2021, concerning toll collection on National Highway 11 (Rewari-Narnaul section and Rewari Bypass) in Haryana and Rajasthan. The changes are due to project scope revisions and ROB GAD modifications under Hybrid Annuity Mode in Haryana. It substitutes Tables 2, 3, and 4 of the original notification, detailing revised lengths for fee applicability, additional bypass fees, and structure lengths for equivalent road length conversion. The estimated project capital cost is revised to ₹3829.57 crore, subject to change, and NHAI will track capital cost recovery via user fees.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-20032025-261713 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 1230] NEW DELHI, TUESDAY, MARCH 18, 2025/PHALGUNA 27, 1946 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 18th March, 2025 S.O. 1243(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 5415(E) dated 27th December 2021 has authorised National Highway Authority of India (hereinafter referred to as the “Authority”) to collect, either through its officials or through a contractor for the use of Rewari to Narnaul Section from design kilometer 0.00 to kilometer 44.50 (existing km 11.78 to km 56.90) of National Highway Number 11 and Rewari Bypass from design km 0.00 to km 14.40 (existing km 0.00 to km 14.40) of National Highway Number 11 in the State of Haryana and Rajasthan. And whereas the Authority has taken up the work of various structures under Change of Scope as well as due to revision in GADs of ROB in the state of Haryana on Hybrid Annuity Mode. Now, in exercise of the powers conferred by Section 7 of the National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules 2008, the Central Government hereby makes following amendment in the Notification of the Government of India in the Ministry of Road Transport and Highways S.O. 5415(E) dated 27th December 2021 (hereinafter referred to as "said notification"), published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (ii), namely:- (i) In paragraph 2 of the said notification, the phrases "for net road section length of 33.968 km for the use of four and more lane section and for equivalent structure length (having length more than 60m) of 8.56 km (having length of 0.856 km) and at one and one half times the base rate for bypasses having length of 24.068 km costing rupees ten crore or more” shall be substituted with the following phrases:- "for net road section length of 36.573 km [Table-2] and for equivalent structure length (having length more than 60m) of 12.88 Km (having length of 1.288 km[Table-4]) and at one and one half times the base rate for bypasses having length of 21.039 Km [Table-3] costing rupees ten crore or more for use of four or more lane section" (ii) In the said notification, for Table-2 specified under Serial No. 1, the following Table shall be substituted:- Table 2 +---------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------+ | Location of Fee Plaza | Length (in Km) for | Rate at which fee is payable | | (chainage) | which Fee is payable | | +=============================================+=========================================================+===========================================================+ | At Design Km 22.100 (Existing | 36.573 | 100% for four or more lane of the | | km 35.100 of NH-11) near | (Excluding length of Bypass (costing >10 | base rates mentioned in Table-1 | | Kathuwas village in Alwar district | Cr.) and length of structures(>60m) | above | | of Rajasthan | | | +---------------------------------------------+---------------------------------------------------------+-----------------------------------------------------------+ (iii) In the said notification, for Table-3 specified under Serial No. 2, the following Table shall be substituted:- Table 3 +---------------------------------------------+----------------+--------------+-------------+---------------------+-------------------+-----------------------------------------------------------+ | Location of Fee | Name of | Taking Off | Merging at | Length and Cost of bypass for | Rate at which fee | | Plaza (chainage) | the Bypass | | | which additional fee is payable | is payable | | | | | +---------------------+-------------------+-----------------------------------------------------------+ | | | | | Length (in Km.) | Cost (in Rs Crore | | +=============================================+================+==============+=============+=====================+===================+===========================================================+ | At Design Km 22.100 (Existing | Rewari Bypass | Km 0.000 | Km 14.400 | 13.489 | 429.22 | 150% for four or | | km 35.100 of NH-11) near Kathuwas | | | | | | more lane of the base | | village in Alwar district of Rajasthan | | | | | | rates mentioned in Table -1 | | | | | | | | above | +---------------------------------------------+----------------+--------------+-------------+---------------------+-------------------+-----------------------------------------------------------+ | | Ateli Bypass | Km 30.45 | Km 38.00 | 7.550 | 176.18 | | +---------------------------------------------+----------------+--------------+-------------+---------------------+-------------------+-----------------------------------------------------------+ | | Total | | | 21.039 | 605.40 | | +---------------------------------------------+----------------+--------------+-------------+---------------------+-------------------+-----------------------------------------------------------+ (iv) In the said notification, for Table-4 including Sub-table specified under Serial No. 3, the following shall be substituted:- Table 4 +---------------------------------------------+-----------------------------------------------------+---------------------------------+-----------------------------------------------------------+ | Location of Fee Plaza | Length of structures (in | Equivalent | Rate at which payable | | (chainage) | Km) to be converted | road length (in | Fee is | | | into equivalent road | Km.) | | | | length | | | +=============================================+=====================================================+=================================+===========================================================+ | At Design Km. 22.100 (Existing km | 1.288^ | 12.88 | 100% for four or more | | 35.100 of NH-11) near Kathuwas village in | | | lanes of the base rates | | Alwar district of Rajasthan | | | mentioned in Table- | | | | | above | +---------------------------------------------+-----------------------------------------------------+---------------------------------+-----------------------------------------------------------+ ^Details are as under:- +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | S. | Type of structure | From | To | Length of structure in | Equivalent Road length | | No. | | Km | Km | km | in km | +=====+======================================+=======+=======+========================+========================+ | (a) | (b) | (c) | (d) | (e) | (f) | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 1 | Major bridge (Pkg-IV) | 4.157 | 4.262 | 0.105 | 1.05 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 2 | Railway Under Bridge (Pkg-4) (DFCCIL | 5.379 | 5.520 | 0.141 | 1.41 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 3 | Railway Over Bridge (PKG-4) | 8.469 | 8.632 | 0.163 | 1.63 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 4 | Viaduct | 10.318| 10.592| 0.274 | 2.74 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 5 | Railway Over Bridge (PKG-4) | 12.511| 12.739| 0.228 | 2.28 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 6 | Railway Over Bridge (PKG-3) (PWD) | 12.145| 12.315| 0.170 | 1.7 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | 7 | Railway Over Bridge (PKG-3) (DFCCIL) | 7.396 | 7.603 | 0.207 | 2.07 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ | | Total | | | 1.288 | 12.88 | +-----+--------------------------------------+-------+-------+------------------------+------------------------+ (v) In the said notification, Serial No. 11 shall be substituted with the following:- "11. The estimated capital cost of the project is Rupees 3829.57 crore. The capital cost is subjected to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised." [F. No. PROJ-18015(73)/1/2024-PIU Rewari/E-240634] KAMESH CHATURVEDI, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free