Full Text
EXTRAORDINARY
PART III—Section 4
PUBLISHED BY AUTHORITY
No. 181] NEW DELHI, TUESDAY , MARCH 19, 2024 /PHALGUNA 29, 1945
CG-DL-E-20032024-253250
(1) (2) (3) (4) (5)
आई एस 4186 : 2024
आई एस 4186 : 1985
आई एस 6934 : 2024
आई एस 6934 : 2014
आई एस 10061 : 2024
आई एस 10061 : 1991
आई एस 10062 : 2024
आई एस 10062 : 1991
आई एस 10160 : 2024
आई एस ओ 5167 -3 : 2022
आई एस ओ 5167 -3 : 2003
BUREAU OF INDI AN S TANDARDS
(Department of Consumer Affairs )
NOTIFICATION
New Delhi , the 12th March , 2024
Ref: HQ-PUB013/1/2020 -PUB -BIS (810) .—In pursuance of Sub -rule (1) of Rule (15) of the Bureau of
Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of
which are given in the second column of the schedule hereto annexed have been established on the date indicated
against it in third column. The particulars of the standards, if any which are given in the fourth column shal l also
remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column.
SCHEDULE
Sl
No. No., Year & Title of the Indian
Standards Established Date of
Establishment No. , Year & Title of the
Indian Standards to be
withdrawn, if any Date of
withdrawal
(1) (2) (3) (4) (5)
IS 4186 : 2024
Preparation of Project Report for River
Valley Projects — Guide
(Second Revision) 12 March 2024 IS 4186 : 1985
Guide for Preparation of
Project Report for River Valley
Projects
(First Revision) 12 April
IS 4410 (Part 17) : 20 24
River Valley Projects — Glossary of
Terms
Part 17 Water Requirements of Crops
(First Revision) 12 March 2024
IS 4410 (Part XVII ) : 1977
Glossary of Terms Relating to
River Valley Projects
Part XVII Water Requirements
of Crops 12 April
3 IS 6934 : 2024
Hydraulic Design of Ogee Overflow and
Orifice Spillways — Recommendations
(Third Revision) 12 March 2024
IS 6934 : 2014
Hydraulic Design of High Ogee
Overflow and Orifice Spillways
— Recommendations
(Second Revision) 12 April
IS 10061 : 2024
Analysis of Unit Rate of Excavation of
Tunnels by Cyclic Drilling and Blasting
— Proforma
(Second Revision) 12 March 2024
IS 10061 : 1991
Proforma for Analysis of Unit
Rate of Excavation of Tunnels
by Cyclic Drilling and Blasting
(First Revision ) 12 April
IS 10062 : 2024
Analysis of Unit Rate of Quarrying
Rock by Mechanical Means —
Proforma
(Second Revision) 12 March 2024
IS 10062 : 1991
Proforma for Analysis of Unit
Rate of Quarrying Rock by
Mechanical Means
(First Revision) 12 April
IS 10160 : 2024
Analysis of Unit Rate of Earthwork
Used in Construction of River Valley
Projects — Proforma
(First Revision) 12 March 2024
IS 10160 : 1982
Proforma for Analysis of Unit
Rate of Earthwork Used in
Construction of River Valley
Projects
12 April
IS 10386 (Part 6) : 2024
Construction, Operation and
Maintenance of River Valley Projects
— Safety Code
Part 6 Constructions
(First Revision) 12 March 2024
IS 10386 (Part 6) : 1983
Safety Code for Construction,
Operation and Ma intenance of
River Valley Projects
Part 6 Construction 12 April
P. RAJESH , Scientist G & DDG (ITS, PRT & TNM )
[ADVT. -III/4/Exty./ 835/2023 -24]
Uploaded by Dte. of Printing at Governme nt of India Press, Ring Road, Mayapuri, New Delhi -110064
and Published by the Controller of Publication s, Delhi -110054. 8
IS 10386 (Part 8) : 2024
Construction, Operation and
Maint enance of River Valley Projects
— Safety Code
Part 8 Open Excavation
(First Revision) 12 March 2024 IS 10386 (Part 8) : 1 995
Safety Code for Construction,
Operation and Maintenance of
River Valley Projects
Part 8 Open Excavation 12 April
IS 13218 (Part 2) : 2024
Reporting Progress During Construction
for River Valley Projects — Proforma
Part 2 Hydel Works
(First R evision) 12 March 2024 IS 13218 (Part 2) : 1991
Proforma for Reporting
Progress During Construction
for River Valley Projects
Part 2 Hydel Works 12 April
IS 14615 (Part 3) : 2024
ISO 5167 -3 : 2022
Measurement of Fluid Flow by Means
of Pressure D ifferential Devices Inserted
in Circular Cross -Section Conduits
Running Full
Part 3 Nozzles and Venturi Nozzles
(First Revision) 12 March 2024
IS 14615 (Part 3) : 2018
ISO 5167 -3 : 2003
Measurement of Fluid Flow by
Means of Pressure Differential
Devices Inserted in Circular
Cross -Section Conduits
Running Full
Part 3 Nozzles and Venturi
Nozzles
12 April
Login to read full text