Gazette Tracker
Gazette Tracker

Core Purpose

Bureau of Indian Standards notification establishing several revised Indian Standards for river valley projects and fluid flow measurement, with corresponding earlier standards to be withdrawn.

Detailed Summary

Pursuant to Sub-rule (1) of Rule 15 of the Bureau of Indian Standards Rules, 2018, under Ref. HQ-PUB013/1/2020-PUB-BIS(810) dated 12th March 2024, the Bureau of Indian Standards (Department of Consumer Affairs) notified the establishment, effective 12 March 2024, of IS 4186:2024 (Preparation of Project Report for River Valley Projects, Second Revision, replacing IS 4186:1985), IS 4410 (Part 17):2024 (Glossary of Terms Relating to River Valley Projects, Water Requirements of Crops, replacing IS 4410 (Part XVII):1977), IS 6934:2024 (Hydraulic Design of Ogee Overflow and Orifice Spillways, Third Revision, replacing IS 6934:2014), IS 10061:2024 (Analysis of Unit Rate of Excavation of Tunnels by Cyclic Drilling and Blasting, Second Revision, replacing IS 10061:1991), IS 10062:2024 (Analysis of Unit Rate of Quarrying Rock by Mechanical Means, Second Revision, replacing IS 10062:1991), IS 10160:2024 (Analysis of Unit Rate of Earthwork Used in Construction of River Valley Projects, First Revision, replacing IS 10160:1982), IS 10386 (Part 6):2024 and IS 10386 (Part 8):2024 (Construction, Operation and Maintenance of River Valley Projects Safety Code, replacing IS 10386 (Part 6):1983 and IS 10386 (Part 8):1995 respectively), IS 13218 (Part 2):2024 (Reporting Progress During Construction for River Valley Projects, Hydel Works, replacing IS 13218 (Part 2):1991), and IS 14615 (Part 3):2024 / ISO 5167-3:2022 (Measurement of Fluid Flow by Means of Pressure Differential Devices, Nozzles and Venturi Nozzles, replacing IS 14615 (Part 3):2018 / ISO 5167-3:2003); earlier standards remain in force concurrently until withdrawal on 12 April; issued under Advt.-III/4/Exty./835/2023-24, signed by P. Rajesh, Scientist G & DDG (ITS, PRT & TNM).

Full Text

EXTRAORDINARY PART III—Section 4 PUBLISHED BY AUTHORITY No. 181] NEW DELHI, TUESDAY , MARCH 19, 2024 /PHALGUNA 29, 1945 CG-DL-E-20032024-253250 (1) (2) (3) (4) (5) आई एस 4186 : 2024 आई एस 4186 : 1985 आई एस 6934 : 2024 आई एस 6934 : 2014 आई एस 10061 : 2024 आई एस 10061 : 1991 आई एस 10062 : 2024 आई एस 10062 : 1991 आई एस 10160 : 2024 आई एस ओ 5167 -3 : 2022 आई एस ओ 5167 -3 : 2003 BUREAU OF INDI AN S TANDARDS (Department of Consumer Affairs ) NOTIFICATION New Delhi , the 12th March , 2024 Ref: HQ-PUB013/1/2020 -PUB -BIS (810) .—In pursuance of Sub -rule (1) of Rule (15) of the Bureau of Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of which are given in the second column of the schedule hereto annexed have been established on the date indicated against it in third column. The particulars of the standards, if any which are given in the fourth column shal l also remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column. SCHEDULE Sl No. No., Year & Title of the Indian Standards Established Date of Establishment No. , Year & Title of the Indian Standards to be withdrawn, if any Date of withdrawal (1) (2) (3) (4) (5) IS 4186 : 2024 Preparation of Project Report for River Valley Projects — Guide (Second Revision) 12 March 2024 IS 4186 : 1985 Guide for Preparation of Project Report for River Valley Projects (First Revision) 12 April IS 4410 (Part 17) : 20 24 River Valley Projects — Glossary of Terms Part 17 Water Requirements of Crops (First Revision) 12 March 2024 IS 4410 (Part XVII ) : 1977 Glossary of Terms Relating to River Valley Projects Part XVII Water Requirements of Crops 12 April 3 IS 6934 : 2024 Hydraulic Design of Ogee Overflow and Orifice Spillways — Recommendations (Third Revision) 12 March 2024 IS 6934 : 2014 Hydraulic Design of High Ogee Overflow and Orifice Spillways — Recommendations (Second Revision) 12 April IS 10061 : 2024 Analysis of Unit Rate of Excavation of Tunnels by Cyclic Drilling and Blasting — Proforma (Second Revision) 12 March 2024 IS 10061 : 1991 Proforma for Analysis of Unit Rate of Excavation of Tunnels by Cyclic Drilling and Blasting (First Revision ) 12 April IS 10062 : 2024 Analysis of Unit Rate of Quarrying Rock by Mechanical Means — Proforma (Second Revision) 12 March 2024 IS 10062 : 1991 Proforma for Analysis of Unit Rate of Quarrying Rock by Mechanical Means (First Revision) 12 April IS 10160 : 2024 Analysis of Unit Rate of Earthwork Used in Construction of River Valley Projects — Proforma (First Revision) 12 March 2024 IS 10160 : 1982 Proforma for Analysis of Unit Rate of Earthwork Used in Construction of River Valley Projects 12 April IS 10386 (Part 6) : 2024 Construction, Operation and Maintenance of River Valley Projects — Safety Code Part 6 Constructions (First Revision) 12 March 2024 IS 10386 (Part 6) : 1983 Safety Code for Construction, Operation and Ma intenance of River Valley Projects Part 6 Construction 12 April P. RAJESH , Scientist G & DDG (ITS, PRT & TNM ) [ADVT. -III/4/Exty./ 835/2023 -24] Uploaded by Dte. of Printing at Governme nt of India Press, Ring Road, Mayapuri, New Delhi -110064 and Published by the Controller of Publication s, Delhi -110054. 8 IS 10386 (Part 8) : 2024 Construction, Operation and Maint enance of River Valley Projects — Safety Code Part 8 Open Excavation (First Revision) 12 March 2024 IS 10386 (Part 8) : 1 995 Safety Code for Construction, Operation and Maintenance of River Valley Projects Part 8 Open Excavation 12 April IS 13218 (Part 2) : 2024 Reporting Progress During Construction for River Valley Projects — Proforma Part 2 Hydel Works (First R evision) 12 March 2024 IS 13218 (Part 2) : 1991 Proforma for Reporting Progress During Construction for River Valley Projects Part 2 Hydel Works 12 April IS 14615 (Part 3) : 2024 ISO 5167 -3 : 2022 Measurement of Fluid Flow by Means of Pressure D ifferential Devices Inserted in Circular Cross -Section Conduits Running Full Part 3 Nozzles and Venturi Nozzles (First Revision) 12 March 2024 IS 14615 (Part 3) : 2018 ISO 5167 -3 : 2003 Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted in Circular Cross -Section Conduits Running Full Part 3 Nozzles and Venturi Nozzles 12 April

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free