Full Text
7788 GI/202 3 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 5137] NEW DELHI, MONDAY , DECEMBER 18, 2023/ AGRAHAYANA 27, 1945
CG-DL-E-19122023-250749
(1) (2)
0.9
(i) 348.019 348.081 बडा पुल @348.050 61.24
(ii) 373.655 373.745 बडा पुल @373.700 90.60
का 100%, 61.24 मीटर 0.61
90.60 मीटर 0.90
(i) 339.467 339.532 फ्लाईओवर @ 339.500 65.00
(ii) 348.019 348.081 बड़ा पुल @348.050 61.24
(iii) 373.655 373.745 बड़ा पुल @373.700 90.60
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATI ON
New Delhi, the 1 8th December , 2023
S.O. 5 366(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways, number S.O. 465(E) dated 26th April, 2002, issued under Section 11 of the National Highways Authority of
India Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from Km. 140.00 to Km. 281.300 of
Radhanpur to Samakhyali Section of NH -15 (New NH -27) in the State of GUJRAT to the National Highways
Authority of India (hereinafter referred to as the "Authority");
And whereas, pursuant to the provision of Section 14 of the National Highways Authority of India Act, 1988
(68 of 1988), the Authority has entered into an agreement on 12/05/2023 (here in after referred to as "said agreement")
with M/s. Samakhiyali Tollway Private Limited having its registered office 11th floor, 1101, Hiranandani Know ledge
Park, Technology Street, Hill Side Avenue, Opp. Hiranandani Hospital, Powai, Mumbai, Maharashtra -400076)
(hereinafter referred to as the "Concessionaire"), the successful bidder for bids submitted on 30/01/2023 for the
development of Upgradation to 6 Lane with paved Shoulder of NH -27 from Samakhiyali to Santalpur section from
km. 339+200 to km. 430+100 in the State of Gujarat on BOT (Toll) Mode (hereinafter referred to as the "said
section") to Six Laning with Paved Shoulder) on Design, Build, Finance , Operate and Transfer (DBFOT) basis;
Now, therefore, in exercise of the powers conferred by section 8A of the National Highways Act, 1956 (48 of
1956), read with Rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules. 2008 and i ts
subsequent amendments up to the bid due date and in the supersession of the notification bearing S.O. 700(E) dated
26th March 2010, the Central Government, having regard to the expenditure involved in building, maintenance,
management and operation of t he said section of said National Highway, interest on the capital invested, reasonable
return, the volume of traffic and the period of the agreement entered into between the Authority and the
Concessionaire, hereby notifies that there shall be levied and c ollected fees at 75 % of the base rate specified in
column (2) of the Table I for net road section length of 90.248 km and for equivalent structure (with length more than
60 m) length of 1.5184 Km (having length of 0.15184 Km) during construction period an d at the base rate specified in
column (2) of the Table I for net road section length of 90.683 km and for equivalent structure (with length more than
60 m) length of 2.1684 Km (having length of 0.21684 Km) after completion of six laning for use of four o r more lane
sections on the type of vehicles specified in column (1) of the Table I below and authorises the said Concessionaire to
collect and retain the fee on and from the date of Commercial Operation (COD) from the Authority or publication of
this Noti fication in the Official Gazette, whichever is later, till the termination date as specified in the agreement. This
fee notification shall be effective from the Appointed Date of the aforesaid agreement:
Table 1
Type of vehicle Base rate of fee per km for the base
year 2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) o r Earth Moving Equipment (EME)
or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza, at the base rate mentioned in
Table 1 above, for the distance specified for such Fee Plaza(s), namely: -
Table 2
Location of Fee Plaza
(chainage) Length (in km) for
which Fee is payable
(During
Construction
Period) Rate at which fee is
payable Length (in km) for
which Fee is
payable
(After
Construction of
Six Laning) Rate at which fee is
payable
At Km/Ch 394+200 of NH -
27 near Makhel in Kutch
district of Gujarat State 90.248 Km
(Excluding length of
structures (>60m)) 75% for four or
more lanes, of the
base rates mentio ned
in Table -1 above,
without any amount
increase 90.683 Km
(Excluding length of
structures (>60m)) 100% for four or
more lanes, of the
base rates mentioned
in Table -1 above
2. In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60 m at the following Fee plaza(s), by converting the length of structures into an equipment length of
highway by multiplying the length of such structures by an equalisation factor of 10, at the bas e rate mentioned in
Table 1 above: -
Table 3
Location of Fee Plaza
(Chainage) Length^ of structures (in km) to
be converted into equivalent
road length (During
Construction Period) Equivalent road
length (in km) Rate at which fee is payable)
At Km/C h 394+200 of
NH-27 near Makhel in
Kutch district of Gujarat
State 61.24 Meter 0.61 75% for four or
more lanes, of the base rates
mentioned in Table -1 above,
without any amount increase 90.60 Meter 0.9
^The details of structures (> 6 0 m length) are as under: -
S.NO. Start Chainage (at km) End Chainage (at km) Type and Name of the Structure Total length (mtr.)
(i) 348.019 348.081 Major Bridge @348.050 61.24
(ii) 373.655 373.745 Major Bridge @373.700 90.60
Total length of struc ture 151.84
Table 4
Location of Fee Plaza
(Chainage) Length^ of structures
(in km) to be
converted into equivalent
road length
(After Construction of
Six Laning) Equivalent
road length
(in km) Rate at which fee is
payable)
At Km/Ch 394+200 of
NH-27 near Makhel in Kutch district of
Gujarat State 65.0 Meter 0.65 100% for four or more
lanes, of the base rates
mentioned in Table -1
above 61.24 Meter 0.61
90.60 Meter 0.90
^The details of structures (> 60 m len gth) are as under: -
S.NO. Start Chainage (at km) End Chainage (at km) Type and Name of the Structure Total length (mtr.)
(i) 339.467 339.532 Flyover @ 339.500 65.00
(ii) 348.019 348.081 Major Bridge @348.050 61.24
(iii) 373.655 373.745 Major Bridge @37 3.700 90.60
Total length of structure 216.84
3. No user fee shall be levied for the delayed period between the scheduled date of completion (730 days from the
Appointed Date) and the date of actual completion of the project, if it is delayed. For t he purposes of this rule, any
provisional completion of the project shall not be treated as completion of the project.
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial purposes and
resides within a distan ce of twenty kilometres from the fee plaza is Rs. 330/ - (Three Hundred Thirty Rupees) for the
year 2023 -24 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journey on the highway section, passes shall be issued at the following rates, namely: -
Table 5
Amount Payable Maximum number of one way
journeys allowed Period of validity
One and half times of the fee for one way
journey Two Twenty four hours from the time of
payment
Two-third of amount of the fee pay able for
fifty single journeys or more Fifty or more One month from date of payment
6. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in the district
where the fee plaza falls shall be 50% of the specified rate fo r that category of vehicle provided no service road or
alternative road is available for use of such commercial vehicles.
7. A mechanical vehicle which is loaded in excess of permissible load specified for its category under the
rules, shall not be permitt ed to use the National Highway for crossing the fee plaza until the excess load has been
removed from such mechanical vehicle. The driver or owner or a person in -charge of a mechanical vehicle which is
loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded
vehicle on the National Highway to the fee collecting agency as per the applicable provision in the said rules.
8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
9. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table 1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authori ty.
The same shall be got published by the Authority in at least one newspaper in English and vernacular language
through the Concessionaire and thereafter revised annually in accordance with the rule 5 of the said rules and
provisions of the Concession Ag reement and will be published; provided, however, that such revision shall not be
effected until a period of 6 (six) months from the date of preceding revision of fee.
[F. No. NHAI/PIU /Palanpur/Gazette NotificationforMakhelToll/Upgradation/BOT/2023 -24/E -230543]
SUMAN PRASAD SINGH , Jt. Secy .
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.