Full Text
8151 GI/202 4 (1)
EXTRAORDINARY
PART II —Section 3 —Sub-section ( ii)
PUBLISHED BY AUTHORITY
No. 5043] NEW DELHI, TUES DAY , DECEMBER 17, 2024 / AGRAHAYANA 26, 1946
CG-DL-E-17122024-259480
(1) (2)
का 100 %
0.350 ^
3.50
100%
85+321.75 85+392.7 बड़ा पुल 0.071
96+223 96+289 बड़ा पुल 0.066
103+286 103+416 बड़ा पुल 0.130
114+824.5 114+907.5 आरओबी 0.083
क ु ल 0.350
दकमी 54.530 -दकमी 115.330/ई -233918 ]
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 13th December , 2024
S.O. 5 450(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways (S.O.2946(E) dated 18th June 2018) is sued under Section 11 of National Highways Authority of India
Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from 0.000 to kilometre 117.000 (Ara -
Mohania section) of National Highway No. 30 (New NH -319) in the State of Bihar to the National Highways
Authority of India(hereinafter referred to as the “Authority”);
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), the Central Government hereby levies the fee on mechanical vehicles at the
rate specified in column (2) of the Table 1 for net road section length of 60.362 km [Table -2] and for equivalent
structure length (having length more than 60m) of 3.50 km (having length of 0.350 km [Table -3]) on the type of
vehicles specified in column (1) of the Table 1 below for the use of four or more lane s of Pararia -Mohania section of
NH-319 from design Km. 54.530 to Km. 115.242 of National Highway number 319 (Old NH No. 30) in the State of
Bihar and authorises the Authority to collect, either through its officials or through a contractor, the said fee, as
under: -
Table 1
Type of vehicle Base rate of fee per km for the base year
2007 -08 (in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three -axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving
Equipment (EME) or Multi Axle Vehicle (MAV) (four to six axles) 3.45
Oversized Vehicles (seven or more axles) 4.20
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s), namely: -
Table 2
Location of Fee Plaza
(chainage) Length (in km) for which
Fee is payable Rate at which
Fee is payable
At Km/Ch.77.821 of NH -
319 near Village
Katiyara in Rohtas district of
State Bihar 60.362
(Excluding length of structures
(>60m)] 100% for four or more lane, of the
base rates mentioned in Table -1
above
2. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalisation factor of 10: -
Table 3
Location of Fee Plaza
(chainage) Length of structures (in
km) to be converted
into equivalent road
length Equivalent road
length (in km) Rate at which
Fee is payable
At Km/Ch.77.821 of NH -
319 near Village
Katiyara in Rohtas district of
State Bihar 0.350^ 3.50 100% for four or more
lane, of the base rates
mentioned in Table -1 above
^The details are as under: -
Average Chainage
Type of Structure Length (in km)
From Km To Km
85+321.75 85+392.7 Major Bridge 0.071
96+223 96+289 Major Bridge 0.066
103+286 103+416 Major Bridge 0.130
114+824.5 114+907.5 ROB 0.083
Total 0.350
3. The rate of monthly pass for a person who owns a mechanical vehicle registered for non -commercial
purposes and resides within a distance of twenty kilometers from the fee plaza is Rs. 340.000 (Three Hundred and
Forty Only) for the year 2024 -25 and is subject to revision every year as per the provisions of the said rules.
4. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table 4
Amount Payable Maximum number of on
way journeys allowed Period of validity
One and half times of the fee for one way
journey Two Twenty four hours from the time of
payment
Two-third of amount of the fee payable for
fifty single journeys. Fifty One month from date of
payment
5. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where
the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
6. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
to the fee collecting agency, equal to the fee specified in sub -rule 1A of rule 10 of the said rules, and shall not be
entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle.
7. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules.
8. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
9. Based on the base rate of fee per kilometer for the base year 2007 -08 as mentioned in Table -1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority
on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules
and the same shall be published in at least one newspaper in English and vernacular language.
10. The estimated capital cost of the project is Rupees 794.37 Crore and the capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. NHAI/13013/CO/23 -24/Fee Notification/ Pararia – Mohania Section
(Design km 54.530 -Km 115.330/E -233918 ]
KAMLESH CHATURVEDI, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring R oad, Mayapuri, New Delhi -110064
and Published by the Controller of Publications, Delhi -110054.
Login to read full text