Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-17072024-255506
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 2656]
NEW DELHI, TUESDAY, JULY 16, 2024/ASHADHA 25, 1946
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 15th July, 2024
S.O 2792(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 4203 (E) dated 11th October, 2021 issued under section 05 of the National Highway Act, 1956
(48 of 1956), the Central Government has entrusted the stretch of National Highway No. NH-89 (New-NH-58)
situated within the State of Rajasthan to the State Government of Rajasthan.
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), and in supersession to Notification published vide S.O. 2492 (E) dated
24.09.2014, the Central Government hereby levies the fee at hundred percent of the base rate specified in column (2) of
the Table 1 for net 4-Lane road section length of 2.050 km, sixty percent of the base rate specified in column (2) of
the Table 1 for net 2 Lane with paved shoulders road section length of 104.715 km, ninety percent of the base rate
specified in column (2) of the Table 1 for 2 Lane with paved shoulders bypasses (costing > 10 Cr.) excluding length of
structure > 60 m having length of 41.336 km and sixty percent of the base rate specified in column (2) of the Table 1
for 2 Lane with PS structure length more than 60m having equivalent length of 1.49 Km (having length of 0.149 m)
for the use of Ajmer-Nagaur Section from design kilometer 0.000 to kilometer 148.250 (existing km 0.000 to km
148.250) of National Highway NH-89 (New NH-58) in the state of Rajasthan and authorises the National Highway
Authority of India to collect, either through its officials or through a contractor, the said fee, namely:-
Table-1
+-------------------------------------------------------------------+------------------------------------------+
| Type of vehicle | Base rate of fee per km for the base |
| | year 2007-08 (in Rupees) |
+===================================================================+==========================================+
| (1) | (2) |
+-------------------------------------------------------------------+------------------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-------------------------------------------------------------------+------------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
+-------------------------------------------------------------------+------------------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+-------------------------------------------------------------------+------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-------------------------------------------------------------------+------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment | 3.45 |
| (EME) or Multi Axle Vehicle (MAV) (four to six axles) | |
+-------------------------------------------------------------------+------------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+-------------------------------------------------------------------+------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified
for such Fee Plaza, namely: -
Table-2
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
| Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable | Rate at which fee is payable |
+===================================================================+====================================================================================================+=================================================================+
| At km 25+000 design Chainage of NH-58 | 44.465 | 60% for two lane with paved |
| near Badi Ghati in Nagaur district | (Excluding length | shoulders, of the base rates |
| Rajasthan. | of structure > 60 m & length of Bypass costing >10 cr.) | mentioned in Table-1 above |
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
| | 1.00 | 100% for four or more lane, of |
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
| At km 111+000 design Chainage of NH-58 | (Excluding length | the base rates mentioned in |
| near Butati in Nagaur district Rajasthan. | of structure > 60 m & length of Bypass Table-1 above | |
| | costing >10 cr.) | |
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
| | 60.25 | 60% for two lane with paved |
| | (Excluding length | shoulders, of the base rates |
| | of structure > 60 m & length of Bypass | mentioned in Table-1 above |
| | costing >10 cr.) | |
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
| | 1.050 | 100% for four or more lane, of |
| | (Excluding length | the base rates mentioned in |
| | of structure > 60 m & length of Bypass | Table-1 above |
| | costing >10 cr.) | |
+-------------------------------------------------------------------+----------------------------------------------------------------------------------------------------+-----------------------------------------------------------------+
2. In addition to above, the following fee shall also be due and payable for the use of the bypass Costing Rs. 10 Cr,
or more at the following fee plaza for net bypass length specified for such fee plaza (s): -
Table-3
+-------------------------------+---------------+----------+----------+----------------+----------------------------------------------------------------+
| Location of fee plaza | Name of the | Taking | Merging | Length | Rate at which fee is |
| (Chainage) | Bypass | off | at | (in Km.) | payable |
+===============================+===============+==========+==========+================+================================================================+
| At km 25+000 design | Ajmer-Puksar | 0.000 | 22.310 | 22.230 | 90% for two lane |
| Chainage of NH-58 | Bypass | | | | with paved shoulders, |
| near Badi Ghati in | Thanwala Bypass| 28.600 | 31.950 | 3.350 | of the base rates |
| Nagaur district | | | | | mentioned in Table-1 |
| Rajasthan. | Padukala Bypass| 50.05 | 53.05 | 3.00 | above |
+-------------------------------+---------------+----------+----------+----------------+----------------------------------------------------------------+
| At km 111+000 | Ren Bypass | 87.675 | 92.00 | 4.256 | 90% for two lane |
| design Chainage of | Kuchera Bypass| 114.050 | 118.250 | 4.200 | with paved shoulders, |
| NH-58 near Butati in | | | | | of the base rates |
| Nagaur district | Innana Bypass | 140.450 | 144.750 | 4.300 | mentioned in Table-1 |
| Rajasthan. | | | | | above |
+-------------------------------+---------------+----------+----------+----------------+----------------------------------------------------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60m at the following Fee Plaza, by converting the length of structures into an equivalent length of
highway by multiplying the length of such structures by an equalisation factor of 10: -
Table-4
+-------------------------------------------------------------------+-------------------------------------------------------------------+-------------------------------+----------------------------------------------------------------+
| Location of Fee Plaza (chainage) | Length of structures (in km) to be converted into | Equivalent Road length | Rate at which fee is payable |
| | equivalent road length | (in km) | |
+===================================================================+===================================================================+===============================+================================================================+
| At km 25+000 design Chainage of | 0.080* | 0.80 | 60% for two lane with paved |
| NH-58 near Badi Ghati in Nagaur | | | shoulders, of the base rates |
| district Rajasthan. | | | mentioned in Table-1 above |
+-------------------------------------------------------------------+-------------------------------------------------------------------+-------------------------------+----------------------------------------------------------------+
| At km 111+000 design Chainage of | 0.06928** | 0.6928 | 60% for two lane with paved |
| NH-58 near Butati in Nagaur district | | | shoulders, of the base rates |
| Rajasthan. | | | mentioned in Table-1 above |
+-------------------------------------------------------------------+-------------------------------------------------------------------+-------------------------------+----------------------------------------------------------------+
*The details are as under:
+--------+------------+------------+-------------------+-------------+
| Sl. No.| Chainage | | Type of Structure | Length (Km) |
| | From Km | To Km | | |
+========+============+============+===================+=============+
| 1. | 20.460 | 20.540 | Major Bridge | 0.080 |
+--------+------------+------------+-------------------+-------------+
| Total | | | | 0.080 |
+--------+------------+------------+-------------------+-------------+
**The details are as under:
+--------+------------+------------+-------------------+-------------+
| Sl. No.| Chainage | | Type of Structure | Length (Km) |
| | From Km | To Km | | |
+========+============+============+===================+=============+
| 1. | 90.846140 | 90.915460 | ROB | 0.06928 |
+--------+------------+------------+-------------------+-------------+
| Total | | | | 0.06928 |
+--------+------------+------------+-------------------+-------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and
resides within a distance of twenty kilometers from the fee plaza is Rs 340.00 (Rupees Three Hundred and Forty
Rupees only) for the year 2024-25 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table-5
+-----------------------------------------------------------+----------------------------------------------+-------------------------------------+
| Amount Payable | Maximum number of one way journeys allowed | Period of validity |
+===========================================================+==============================================+=====================================+
| One and one-half times of the fee for one way journey | Two | Twenty four hours from the time of |
| | | payment |
+-----------------------------------------------------------+----------------------------------------------+-------------------------------------+
| Two-third of amount of the fee payable for fifty single | Fifty | One month from date of payment |
| journeys | | |
+-----------------------------------------------------------+----------------------------------------------+-------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the
fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the National
Highways Authority of India on the basis of the completed length of the section and revised annually in accordance
with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular
language.
11. The estimated capital cost of the project is Rupees 442.84 crore. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The National Highway
Authority of India shall maintain a record of the recovery of capital cost through user fee realised.
[F. No. RJ/DPP/AP/2019-20/1154(CoS) /E-211301]
SUMAN PRASAD SINGH, Jt. Secy.
Login to read full text