Gazette Tracker
Gazette Tracker

Core Purpose

The Bureau of Indian Standards notifies the establishment of ten new Indian Standards and the concurrent withdrawal of several older standards, effective from June 2, 2025, and December 2, 2025, respectively.

Detailed Summary

The Bureau of Indian Standards, under the Department of Consumer Affairs, issued Notification Ref: HQ-PUB013/1/2020-PUB-BIS (1249) on June 4, 2025, in pursuance of Sub-rule (1) of Rule (15) of the Bureau of Indian Standards Rules, 2018. This notification announces the establishment of ten new Indian Standards on June 2, 2025. These include: IS 1885 (Part 90): 2025 (Electrotechnical Vocabulary Part 90 Magnetic Materials and Components), IS 10954: 2025 (Catheter for Cow – Specification (First Revision)), IS 12670: 2025 (Veterinary Instruments – Stomach Pump - Specification (First Revision)), IS 19189: 2025 (Accessible Design – Information Contents, Figuration and Display Methods of Tactile Guide Maps), IS 19190: 2025 (Accessible Design – Application of Braille on Signage, Equipment and Appliances), IS 19230: 2025 (Ksharasutra – Methods of Test), IS 19233 (Part 1): 2025 (Implants for Surgery – Coatings on Metallic Surgical Implants Part 1 Plasma-Sprayed Coatings), IS/ISO/IEC 27006-1: 2024 (Information Security Management Systems Part 1 General (Second Revision)), IS/ISO/IEC 30105-3: 2024 (ITES-BPO Lifecycle Processes Part 3 Measurement Framework (MF) and Organization Maturity Model (OMM) (First Revision)), and IS/ISO/IEC 30105-5: 2024 (ITES-BPO Lifecycle Processes Part 5 Guidance (First Revision)). Concurrently, several existing standards are to be withdrawn on December 2, 2025, including IS 1885 (Part XXXI) – 1971, IS 1885 (Part XLI) – 1975, IS 10954 – 1984, IS 12670: 1989, IS/ISO 13179-1: 2014, IS/ISO/IEC 27006: 2015, IS/ISO/IEC 30105 (Part 3) : 2016, and IS/ISO/IEC 30105 (Part 5) : 2016. New standards IS 19189: 2025, IS 19190: 2025, and IS 19230: 2025 do not replace any existing standards. The notification was signed by CHITRA GUPTA, Scientist G & DDG (Hallmarking and Training).

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-16062025-263850 EXTRAORDINARY PART III—Section 4 PUBLISHED BY AUTHORITY No. 427] NEW DELHI, FRIDAY, JUNE 13, 2025/JYAISTHA 23, 1947 3814 GI/2025 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] BUREAU OF INDIAN STANDARDS (Department of Consumer Affairs) NOTIFICATION New Delhi, the 4th June, 2025 Ref: HQ-PUB013/1/2020-PUB-BIS (1249). In pursuance of Sub-rule (1) of Rule (15) of the Bureau of Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of which are given in the second column of the schedule hereto annexed have been established on the date indicated against it in third column. The particulars of the standards, if any which are given in the fourth column shall also remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column. SCHEDULE +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | SI| No., Year & Title of the Indian | Date of | No., Year & Title of the | Date of | | No| Standards Established | Establishment | Indian Standards to be | Withdrawal | | | | | Withdrawn, if any | | +===+============================================================+===============+============================================================+===============+ |(1)|(2) |(3) |(4) |(5) | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 1 | IS 1885 (Part 90): 2025 | 2 June 2025 | IS 1885 (Part XXXI) – 1971 | 2 December 2025| | | IEC 60050-221: 1990 | | Electrotechnical Vocabulary | | | | Electrotechnical Vocabulary | | Part XXXI Magnetism | | | | Part 90 Magnetic Materials and | | IS 1885 (Part XLI) – 1975 | | | | Components | | Electrotechnical Vocabulary | | | | | | Part XLI Non-Reciprocal | | | | | | Electromagnetic Components | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 2 | IS 10954: 2025 | 2 June 2025 | IS 10954 – 1984 | 2 December 2025| | | Catheter for Cow – Specification | | Specification for Catheter, | | | | (First Revision) | | Cow | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 3 | IS 12670: 2025 | 2 June 2025 | IS 12670: 1989 | 2 December 2025| | | Veterinary Instruments – | | Veterinary – Pump Stomach | | | | Stomach Pump - Specification | | Specification | | | | (First Revision) | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 4 | IS 19189: 2025 | 2 June 2025 | NA | NA | | | ISO 19028: 2016 | | | | | | Accessible Design – Information | | | | | | Contents, Figuration and Display | | | | | | Methods of Tactile Guide Maps | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 5 | IS 19190: 2025 | 2 June 2025 | NA | NA | | | ISO 17049: 2013 | | | | | | Accessible Design – Application | | | | | | of Braille on Signage, Equipment | | | | | | and Appliances | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 6 | IS 19230: 2025 | 2 June 2025 | NA | NA | | | Ksharasutra – Methods of Test | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 7 | IS 19233 (Part 1): 2025 | 2 June 2025 | IS/ISO 13179-1: 2014 | 2 December 2025| | | ISO 13179-1: 2021 | | Implants for Surgery – | | | | Implants for Surgery – Coatings | | Plasma | | | | on Metallic Surgical Implants | | Sprayed Unalloyed Titanium | | | | Part 1 Plasma-Sprayed Coatings | | Coatings on Metallic Surgical | | | | Derived from Titanium or | | Implants | | | | Titanium 6 Aluminum-4 | | Part 1 General Requirements | | | | Vanadium Alloy Powders | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 8 | IS/ISO/IEC 27006-1: 2024 | 2 June 2025 | IS/ISO/IEC 27006: 2015 | 2 December 2025| | | Information Security, | | Information Technology | | | | Cybersecurity and Privacy | | Security Techniques — | | | | Protection – Requirements for | | Requirements for Bodies | | | | Bodies Providing Audit and | | Providing Audit and | | | | Certification of Information | | Certification of Information | | | | Security Management Systems | | Security Management | | | | Part 1 General | | Systems | | | | (Second Revision) | | (First Revision) | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 9 | IS/ISO/IEC 30105-3: 2024 | 2 June 2025 | IS/ISO/IEC 30105 (Part 3) : 2016 | 2 December 2025| | | Information Technology — It | | Information Technology | | | | Enabled Services-Business | | IT Enabled Services-Business | | | | Process Outsourcing (ITES-BPO) | | Process Outsourcing (ITES- | | | | Lifecycle Processes | | BPO) Lifecycle Processes | | | | Part 3 Measurement Framework | | Part 3 Measurement | | | | (MF) and Organization Maturity | | Framework (MF) and | | | | Model (OMM) | | Organization | | | | (First Revision) | | Maturity Model (OMM) | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ | 10| IS/ISO/IEC 30105-5: 2024 | 2 June 2025 | IS/ISO/IEC 30105 (Part 5) : 2016 | 2 December 2025| | | Information Technology - It | | Information Technology | | | | Enabled Services-Business | | IT Enabled Services Business | | | | Process Outsourcing (ITES-BPO) | | Process Outsourcing (ITES- | | | | Lifecycle Processes | | BPO) Lifecycle Processes | | | | Part 5 Guidance | | Part 5 Guidelines | | | | (First Revision) | | | | +---+------------------------------------------------------------+---------------+------------------------------------------------------------+---------------+ CHITRA GUPTA, Scientist G & DDG (Hallmarking and Training) [ADVT.-III/4/Exty./160/2025-26]

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free