REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-15092025-266163
EXTRAORDINARY
PART II-Section 3-Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 4045]
NEW DELHI, MONDAY, SEPTEMBER 15, 2025/BHADRA 24, 1947
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 12th September, 2025
S.O. 4160(E).—Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 3690(E) dated 09th December 2016 issued under section 11 of the National Highway
Authority of India Act 1988 (68 of 1988), the Central Government has entrusted the stretch from km. 11.8 to km.
138.635, entire National Highway No.119 in the state of Uttar Pradesh to the National Highway Authority of India
(hereinafter referred to as the “Authority");
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), (the Central Government hereby levies the fee at the Sixty percent rate
specified in column (2) of the table 1 for net road section length of 15.487 Km. (Table-2) and equivalent structure
length (having length more than 60m) of 0.735Km. (Having length of 0.0735km., Table-4) for the use of two lane
with paved shoulder and at rate specified in column (2) of the Table 1 for equivalent structure length (having length
more than 60m) of 3.6 km. (having length of 0.36 km., Table-4) and at one and one-half times the base rate for
bypasses having length of 10.404 km. costing rupees ten crore or more for use of four or more lane on the type of
vehicles specified in column (1) of the table 1 below of Najibabad Bypass from design kilometer 0.000 to kilometer
10.764 (existing kilometer 112.545 to kilometer 122.200) & Najibabad-Kotdwar section (from km.122.200 to
Km.137.760) of National Highway number 119 (New NH-534) in the state of Uttar Pradesh and authorises the
Authority to collect, either through its officials or through a contractor, the said fee, namely:-
Table-1
+-------------------------------------------------------------+---------------------------------------+
| Type of Vehicles | Base rate of fee per km. for the base |
| | year 2007-08 |
| | (in Rupees) |
+-------------------------------------------------------------+---------------------------------------+
| (1) | (2) |
+-------------------------------------------------------------+---------------------------------------+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
| Light Commercial Vehicle, Light Goods Vehicle | 1.05 |
| or Mini Bus | |
| Bus or Truck (Two Axles) | 2.20 |
| Three-axle commercial vehicles | 2.40 |
| Heavy Construction Machinery (HCM) or Earth | 3.45 |
| Moving Equipment (EME) or Multi Axle | |
| Vehicle (MAV) (four to six axles) | |
| Oversized Vehicles (seven or more axles) | 4.20 |
+-------------------------------------------------------------+---------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza namely: -
Table-2
+-------------------------------------------------------------+---------------------------------------------+------------------------------------+
| Location of Toll Plaza | Length (in km.) for which fee is | Rate at which fee is payable |
| (chainage) | payable | |
+-------------------------------------------------------------+---------------------------------------------+------------------------------------+
| At Design km. 14+864 of new NH-534 (at | 15.487 | 60% for two lane with paved |
| existing chainage Km. 126+300 of old | [Excluding length of Bypass | shoulders, of the base rates |
| NH-119) near village Badia, in District | (costing-Rs.10 Crores) and | mentioned in Table-1 above |
| Bijnor, Uttar Pradesh. | length of Structure (>60m)] | |
+-------------------------------------------------------------+---------------------------------------------+------------------------------------+
2. In addition to above, the following fee shall also be due and payable for the use of bypass costing Rs 10
crore or more at the following Fee Plaza for net bypass length specified for such Fee Plaza:-
Table-3
+------------------------------+------------+------------+-----------+-----------------------------------+--------------------+
| Location of Fee Plaza | Name of | Taking Off | Merging at| Length and Cost of bypass | Rate at which |
| (chainage) | Bypass | | | for which additional fee is | fee is payable |
| | | | | payable | |
| | | | | Length (in | Cost (in Rs.| |
| | | | | Km.) | Crore) | |
+------------------------------+------------+------------+-----------+------------+-------------+--------------------+
| At Design km. | Najibabad | Design km. | Design km. | 10.404 | 233.59 | 150% for |
| 14+864 of new NH- | Bypass NH- | 0.000 to | 10.764 | (Excluding | | four or more |
| 534 (at existing | 119 (new NH-| (existing km.| (existing km.| length of | | lane, of the |
| chainage Km. | 534) | 112.545) | 122.200) | Structures>60m | | base rates |
| 126+300 of old NH- | | | | length) | | mentioned in |
| 119) near village | | | | | | Table-1 |
| Badia, in District | | | | | | above |
| Bijnor, Uttar Pradesh. | | | | | | |
+------------------------------+------------+------------+-----------+------------+-------------+--------------------+
3. In addition to above, the following fee shall also be due and payable for the use of the following structures
having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent
length of highway by multiplying the length of such structures by an equalization factor of 10: -
Table-4
+-------------------------------------------------------------+-----------------------------+---------------------------+---------------------------------------+
| Location of Fee Plaza (chainage) | Length of | Equivalent | Rate at which fee is payable |
| | structures^(km.) to | road length (in | |
| | converted | km.) | |
| | equivalent | | |
| | length | | |
+-------------------------------------------------------------+-----------------------------+---------------------------+---------------------------------------+
| At Design km 14+864 of new NH-534 | 0.360^ | 3.6 | 100% for four or more lane, |
| (at existing chainage Km. 126+300 of | | | of the base rates mentioned |
| old NH-119) near village Badia, in | | | in Table-1 above |
| District Bijnor, Uttar Pradesh. | | | |
| At Design km 14+864 of new NH-534 | 0.0735^^ | 0.735 | 60% for two lane with paved |
| (at existing chainage Km. 126+300 of | | | shoulder, of the base rates |
| old NH-119) near village Badia, in | | | mentioned in Table-1 above |
| District Bijnor, Uttar Pradesh. | | | |
+-------------------------------------------------------------+-----------------------------+---------------------------+---------------------------------------+
^The details are as under: -
+--------+-----------+---------+-------------------+-----------------+
| Sl. No.| From km. | To km. | Type of Structure | Length (in km.) |
+--------+-----------+---------+-------------------+-----------------+
| 1. | 0.035 | 0.115 | Flyover | 0.080 |
| 2. | 6.562 | 6.667 | Major Bridge | 0.105 |
| 3 | 8.28 | 8.38 | Major Bridge | 0.100 |
| 4 | 9.608 | 9.683 | Flyover | 0.075 |
+--------+-----------+---------+-------------------+-----------------+
| | Total | | | 0.360 |
+--------+-----------+---------+-------------------+-----------------+
^^The details are as under: -
+--------+-------------+-------------+-------------------+-----------------+
| Sl. No.| From km. | To km. | Type of Structure | Length (in km.) |
+--------+-------------+-------------+-------------------+-----------------+
| 1. | 134+873.25 | 134+946.75 | Major Bridge | 0.0735 |
+--------+-------------+-------------+-------------------+-----------------+
| | Total | | | 0.0735 |
+--------+-------------+-------------+-------------------+-----------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial
purposes and resides within a distance of twenty kilometers from the toll plaza is Rs. 350.00 (Rupees Three Hundred
and Fifty Only) for the year 2025-26 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table-5
+-------------------------------------------+------------------------------------------------+----------------------------------------+
| Amount Payable | Maximum number of one-way | Period of validity |
| | journeys allowed | |
+-------------------------------------------+------------------------------------------------+----------------------------------------+
| One and half times of the fee for | Two | Twenty-four hours from the time of |
| one-way journey | | payment |
| Two-third of amount of the fee | Fifty | One month from date of payment |
| payable for fifty single journeys | | |
+-------------------------------------------+------------------------------------------------+----------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district
where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or
alternative road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of mechanical vehicle which is loaded in excess of permissible
load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway
of the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be
entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicles.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted
vehicles, service road, alternative road etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rules 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority
on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules
and the same shall be published in at least one newspaper, each in English and vernacular language.
11. The estimated capital cost of the project is Rupees 678.41 crores. [The capital cost is subject to variation
as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed]. The Authority shall
maintain a record of the recovery of capital cost through user fee realized.
[F. No. PROJ-17013(41)/1/2025-PIU Najibabad E/252301]
VINAY KUMAR, Addl. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. SARVESH KUMAR KUMAR SRIVASTAVA
SRIVASTAVA
Digitally signed by SARVESH
Date: 2025.09.15 21:30:09
+0530