Full Text
REGD. No. D. L.-33004/99
The Gazette of India
CG-DL-E-15022024-252123
No. 637]
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
NEW DELHI, TUESDAY, FEBRUARY 13, 2024/MAGHA 24, 1945
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 12th February, 2024
S.O. 673(E).— Whereas by notification of the Government of India in the Ministry of Road Transport and
Highways number S.O. 350(E) dated the 24th January, 2020 issued under Section 11 of the National Highways
Authority of India Act 1988 (68 to 1988), the Central Government has entrusted the stretch from Indore (Bhawarkua
Chowk) to Desghaon (junction with NH-347B) of National Highway no. 347BG and stretch of Khandwa to
Maharashtra/Madhya Pradesh Border of National Highway No. 753L in the State of Madhya Pradesh to the National
Highways Authority of India (hereinafter referred to as the "Authority");
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of
1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008
(hereinafter referred to as the "rules"), the Central Government hereby levies the fee at the rate specified in column (2)
of the Table 1 for net road section length of 39.300 km and for equivalent structure length (having length more than
60m) of 2.000 km (having length of 0.200 km) and at one and one half times the base rate for bypasses having length
of 18.500 km costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for
use of four lane of Dhangaon to Boregaon Section from design kilometer 81.000 to kilometer 139.000 (existing km
86.000 to km 143.000) of National Highway number 347BG& 753L in the State of Madhya Pradesh and authorises
the Authority to collect, either through its officials or through a contractor, the said fee, namely:-
TABLE 1
+=====================================================+===================================================+
| Type of vehicle | Base rate of fee per km for the base year 2007-08 |
| (1) | (in Rupees) |
| | (2) |
+=====================================================+===================================================+
| Car, Jeep, Van or Light Motor Vehicle | 0.65 |
+-----------------------------------------------------+---------------------------------------------------+
| Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 |
+-----------------------------------------------------+---------------------------------------------------+
| Bus or Truck (Two Axles) | 2.20 |
+-----------------------------------------------------+---------------------------------------------------+
| Three-axle commercial vehicles | 2.40 |
+-----------------------------------------------------+---------------------------------------------------+
| Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) | 3.45 |
| or Multi Axle Vehicle (MAV) (four to six axles) | |
+-----------------------------------------------------+---------------------------------------------------+
| Oversized Vehicles (seven or more axles) | 4.20 |
+-----------------------------------------------------+---------------------------------------------------+
1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length
specified for such Fee Plaza(s) namely: -
TABLE 2
+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+
| Location of Fee Plaza (chainage) | Length (in km) for which Fee is payable | Rate at which fee is payable |
+===================================================+===================================================+===================================================+
| At design Km. 115.250 of NH-753L near Chhegaon | 39.300 (Excluding 18.500 km length of Bypass | 100% for four or more lane of the base rates |
| Makhan village in Khandwa district of State Madhya| (costing >10 Cr.) and 0.200 km length of structures| mentioned in Table-1 above |
| Pradesh | (>60m)) | |
+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+
2 In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore
or more at the following Fee Plaza for net bypass length specified for such Fee Plaza(s) : -
TABLE-3
+--------------------------------+-----------------+-----------------+-----------------------------------+-------------------+-----------------------+-----------------------------------+
| Location of Fee Plaza | Name of the | Taking Off | Merging at | Length and Cost of bypass for | Rate at which |
| (chainage) | Bypass | | | which additional fee is payable | fee is payable |
| | | | +-------------------+-----------------------+ |
| | | | | Length (in Km) | Cost (in Rs. Crore) | |
+================================+=================+=================+===================================+===================+=======================+===================================+
| At design Km. 115.250 of NH-753L| Daudwa Bypass | Design km | Design km | 1.700 | 19.924 | 150% for four or more lane of the |
| near Chhegaon Makhan village in| of NH-347BG | 84.200 (existing| 85.900 (existing | | | base rates mentioned in Table-1 |
| Khandwa district of State | | km 89.500) | km 91.500) | | | above |
| Madhya Pradesh |-----------------|-----------------|-----------------------------------+-------------------+-----------------------|-----------------------------------|
| | Deshgaon Bypass | Design km | Design km | 3.700 | 43.364 | |
| | of NH-347BG | 98.000 (existing| 101.700 (existing | | | |
| | and NH-753L | km 104.000) | km 106.800) | | | |
| |-----------------|-----------------|-----------------------------------+-------------------+-----------------------|-----------------------------------|
| | Chhegaonmakahn | Design km | Design km | 4.500 | 52.74 | |
| | Bypass of NH- | 107.100 (existing| 111.600 (existing | | | |
| | 753L | km 112.200) | km 116.100) | | | |
| |-----------------|-----------------|-----------------------------------+-------------------+-----------------------|-----------------------------------|
| | Rustumpur | Design km | Design km | 3.500 | 41.02 | |
| | Bypass of NH- | 123.200(existing| 126.700(existing | | | |
| | 753L | km 129.000) | km 133.000) | | | |
| |-----------------|-----------------|-----------------------------------+-------------------+-----------------------|-----------------------------------|
| | KumthiBypassof | Design km | Design km | 2.600 | 30.472 | |
| | NH-753L | 129.000 (existing| 131.600 (existing | | | |
| | | km 134.300) | km 136.400) | | | |
| |-----------------|-----------------|-----------------------------------+-------------------+-----------------------|-----------------------------------|
| | Boregaon Bypass | Design km | Design km | 2.500 | 29.3 | |
| | of NH-753L | 134.700 (existing| 137.200 (existing | | | |
| | | km 139.500) | km 142.500) | | | |
+--------------------------------+-----------------+-----------------+-----------------------------------+-------------------+-----------------------+-----------------------------------+
3 In addition to above, the following fee shall also be due and payable for the use of the following structures having
length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of
highway by multiplying the length of such structures by an equalisation factor of 10:-
Table 4
+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+
| Location of Fee Plaza (chainage) | Length of structures (in km) | Equivalent road length (in km) | Rate at which fee is payable |
| | to be converted into equivalent road length | | |
+===================================================+===================================================+===================================================+===================================================+
| At design Km. 115.250 of NH-753L near Chhegaon | 0.200 | 2.000^ | 100% of the base rates mentioned in Table-1 above |
| Makhan village in Khandwa district of State Madhya| | | |
| Pradesh | | | |
+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+---------------------------------------------------+
The details are as under: -
+------------+-----------------------------------+-------------------+-----------------+
| Sl. No | Chainage | Type of Structure | Length (in km) |
+============+===================================+===================+=================+
| 1 | Design chainage 120.650 | Major Bridge | 0.100 |
| | (existing chainage 126/2) | | |
+------------+-----------------------------------+-------------------+-----------------+
| 2 | Design chainage 134.300 | Major Bridge | 0.100 |
| | (existing chainage 141/1) | | |
+------------+-----------------------------------+-------------------+-----------------+
| | Total | | 0.200 |
+------------+-----------------------------------+-------------------+-----------------+
4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and
resides within a distance of twenty kilometres from the fee plaza is Rs 330.00 (Rupees Three Hundred Thirty only) for
the year 2023-24 and is subject to revision every year as per the provisions of the said rules.
5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: -
Table 5
+-----------------------------------------------------------+-----------------------------------+---------------------------------------+
| Amount Payable | Maximum number of one way | Period of validity |
| | journeys allowed | |
+===========================================================+===================================+=======================================+
| One and half times of the fee for one way journey | Two | Twenty four hours from the time |
| | | of payment |
+-----------------------------------------------------------+-----------------------------------+---------------------------------------+
| Two-third of amount of the fee payable for fifty single | Fifty | One month from date of payment |
| journeys. | | |
+-----------------------------------------------------------+-----------------------------------+---------------------------------------+
6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the
fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative
road is available for use of such commercial vehicles.
7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load
specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the
fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to
make use of the highway section unless the excess load has been removed from such mechanical vehicle.
8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles,
service road, alternative road, etc. shall be as per definitions specified in the said rules.
9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules.
10. Based on the base rate of fee per kilometer for the base year 2007-08 as mentioned in Table-1 above, the actual
amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the
basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the
same shall be published in at least one newspaper in English and vernacular language.
11. The estimated capital cost of the project is Rupees 1019.08 crore. The capital cost is subject to variation as the
activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a
record of the recovery of capital cost through user fee realised.
[F. No. NHAI/13013/547/CO/23-24/Dhangaon-BoregaonFeeNotification/E-227353]
SUMAN PRASAD SINGH, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
Login to read full text