Gazette Tracker
Gazette Tracker

Core Purpose

The Central Government levies a fee for the use of the four or more lane Victor-Kagavadar-Una section of National Highway 8E in Gujarat, exercising powers under section 7 of the National Highways Act, 1956, and rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008.

Detailed Summary

The Ministry of Road Transport and Highways, through S.O. 4647(E) dated October 13, 2025, has levied a fee for the use of the four or more lane Victor-Kagavadar-Una section of National Highway 8E (design chainage from km 122.420 to km 181.450, existing chainage km 121.840 to km 180.478) in the State of Gujarat. This action is taken under section 7 of the National Highways Act, 1956 (48 of 1956), and rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008, superseding notification S.O. No.3184(E) dated 17th September, 2020. The Central Government had previously entrusted the stretch from km 7.090 to km 263.000 of the Bhavnagar-Talaja-Mahuva-Kagavadar-Una-Kodinar-Veraval section of NH 8E to the National Highways Authority of India (NHAI) via notification S.O. 3214(E) dated 18th October, 2016, under Section 11 of the National Highways Authority of India Act 1988 (68 of 1988). The fee is specified for a net road section length of 55.857 km, an equivalent structure length of 6.310 km (from 0.631 km of structures >60m), and at 150% of the base rate for bypasses of 2.542 km costing ten crore rupees or more. Base rates per km for the base year 2007-08 range from Rs 0.65 for cars to Rs 4.20 for oversized vehicles. The fee is payable at the Fee Plaza at Ch. design Km 152.050 of NH 51 (old NH 8E) near village Nageshri in Amreli district. A monthly pass for non-commercial vehicles residing within 20 km of the plaza costs Rs 350 for 2025-26. Provisions are also made for multiple journey passes, a 50% fee for district-registered commercial vehicles without alternative roads, and fees for overloaded vehicles as per sub-rule 1A of rule 10. The estimated capital cost of the project is Rupees 1501.06 crore, with fees to be annually revised under rule 5 and published.

Full Text

REGD. No. D. L.-33004/99 The Gazette of India CG-DL-E-14102025-266933 EXTRAORDINARY PART II-Section 3-Sub-section (ii) PUBLISHED BY AUTHORITY No. 4518] NEW DELHI, MONDAY, OCTOBER 13, 2025/ ASVINA 21, 1947 MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 13th October, 2025 S.O. 4647(E).—Wereas by notification of the Government of India in the Ministry of Road Transport and Highways number S.O. 3214(E) dated 18th October, 2016 issued under Section 11 of the National Highways Authority of India Act 1988 (68 of 1988); the Central Government has entrusted the stretch from km 7.090 to km 263.000 of Bhavnagar-Talaja-Mahuva-Kagavadar-Una-Kodinar-Veraval section of National Highway 8E in the State of Gujarat to the National Highways Authority of India (hereinafter referred to as the "Authority"). Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 (hereinafter referred to as the "rules"), and in supersession of the notification of the Government of India in the Ministry of Road Transport and Highways number S.O. No.3184(E) dated 17th September, 2020, the Central Government hereby levies the fee at the rate specified in column (2) of the Table 1 for net road section length of 55.857 km [Table-2] and for equivalent structure length (having length more than 60m) of 6.310 km (having length structure 0.631 km [Table-4]) and at 150 % of the base rate for bypasses having length of 2.542 km [Table-3] (excluding length of structures more than 60 m length ) costing rupees ten crore or more on the type of vehicles specified in column (1) of the Table 1 below for the use of four or more lane of Victor- Kagavadar-Una section of NH-8E design chainage from km 122.420 to km 181.450 (Existing chainage km 121.840 to km 180.478) of National Highway number 8E in the State of Gujarat and authorises the Authority to collect, either through its officials or through a contractor, the said fee, namely:- Table 1 +-------------------------------------------------------------+----------------------------------------------------------+ | Type of vehicle | Base rate of fee per km for the base | | | year 2007-08 (in Rupees) | +-------------------------------------------------------------+----------------------------------------------------------+ | (1) | (2) | +-------------------------------------------------------------+----------------------------------------------------------+ | Car, Jeep, Van or Light Motor Vehicle | 0.65 | | Light Commercial Vehicle, Light Goods Vehicle or Mini Bus | 1.05 | | Bus or Truck (Two Axles) | 2.20 | | Three-axle commercial vehicles | 2.40 | | Heavy Construction Machinery (HCM) or Earth Moving Equipment (EME) | 3.45 | | or Multi Axle Vehicle (MAV) (four to six axles) | | | Oversized Vehicles (seven or more axles) | 4.20 | +-------------------------------------------------------------+----------------------------------------------------------+ 1. The fee to be levied and collected hereunder shall be due and payable at the Fee Plaza for net road length specified for such Fee Plaza(s), namely: - Table-2 +-----------------------------------------------+---------------------------------------------------------------------------------------+-------------------------------+ | Location of Fee Plaza (chainage) | Length (in km) for which Fee is | Rate at which fee is payable | | | payable | | +-----------------------------------------------+---------------------------------------------------------------------------------------+-------------------------------+ | At Ch. design Km 152.050 of NH 51 (old | 55.857 [Excluding length of Bypasses | 100% for four or more lane, of| | NH 8E) near village Nageshri in Amreli | (≥ Rs.10 Cr.) and length of structures | the base rates mentioned in | | district of State Gujarat | (>60m)] | Table-1 above | +-----------------------------------------------+---------------------------------------------------------------------------------------+-------------------------------+ 2. In addition to above, the following fee shall also be due and payable for the use of the bypass costing Rs 10 crore or more at the following Fee Plazas for net bypass length specified for such Fee Plaza(s): - Table - 3 +--------------------------------+-----------+-----------+-------------+----------------------------------------------------+--------------------------------+ | Location of Fee Plaza | Name of the | | | Length and Cost of | Rate at which | | (chainage) | Bypass | Taking Off| Merging at | bypass for which | fee is payable | | | | | | additional fee is payable | | | | | | | [Excluding length of | | | | | | | Structure (>60m)] | | | | | | +---------------------+--------------------------+ | | | | | | Length (in | Cost (in | | | | | | | Km.) | Rs. | | | | | | | | Crore) | | +--------------------------------+-----------+-----------+-------------+---------------------+--------------------------+--------------------------------+ | At Ch. design Km | | | | | | 150% for four | | 152.050 of NH 8E near | | | | | | or more lane | | village Nageshri in | Samter | Design Km | Design Km | 2.542 km | More | of the base | | Amreli district of State | Bypass | 174.645 | 177.325 | | than 10 | rates | | Gujarat | | | | | crores | mentioned in | | | | | | | | Table-1 above | +--------------------------------+-----------+-----------+-------------+---------------------+--------------------------+--------------------------------+ 3. In addition to above, the following fee shall also be due and payable for the use of the following structures having length more than 60m at the following Fee Plaza(s), by converting the length of structures into an equivalent length of highway by multiplying the length of such structures by an equalisation factor of 10: - Table - 4 +------------------------------------------+---------------------------------------------------------------------+-----------------------------+--------------------------------+ | Location of Fee Plaza | Length of structures (in km) to be | Equivalent | Rate at which fee is | | (chainage) | converted into equivalent road length | road | Payable | | | | length (in km) | | +------------------------------------------+---------------------------------------------------------------------+-----------------------------+--------------------------------+ | At Ch. design Km 152.050 of NH | 0.631* | 6.310 | 100% for four or | | 51 (old NH 8E) near village | | | more lane, of the | | Nageshri in Amreli district of State | | | base rates | | Gujarat | | | mentioned in | | | | | Table-1 above | +------------------------------------------+---------------------------------------------------------------------+-----------------------------+--------------------------------+ *The details of 4 lane structures (>60 m) are as under: - +-------+------------------+------------------+-------------------+-----------------+ | Sr no.| Existing Chainage| Design | Type of Structure | Length (in km) | | | | Chainage | | | +-------+------------------+------------------+-------------------+-----------------+ | | At Km | At Km | | | +-------+------------------+------------------+-------------------+-----------------+ | 1 | 124.222 | 124.678 | Major Bridge | 0.072 | | 2 | 134.593 | 135.386 | Major Bridge | 0.252 | | 3 | 149.426 | 149.982 | Major Bridge | 0.069 | | 4 | 170.220 | 170.901 | Major Bridge | 0.100 | | 5 | 175.667 | 175.627 | Major Bridge | 0.138 | +-------+------------------+------------------+-------------------+-----------------+ | | Total | | | 0.631 | +-------+------------------+------------------+-------------------+-----------------+ 4. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-commercial purposes and resides within a distance of twenty kilometres from the fee plaza is Rs 350 (Rupees Three Hundred and Fifty Only) for the year 2025-26 and is subject to revision every year as per the provisions of the said rules. 5. For multiple journeys on the highway section, passes shall be issued at the following rates, namely: - Table - 5 +-------------------------------------------------+-------------------------------------------------+--------------------------------------+ | Amount Payable | Maximum number | Period of validity | | | of one-way journeys | | | | allowed | | +-------------------------------------------------+-------------------------------------------------+--------------------------------------+ | One and half times of the fee for one | Two | Twenty-four hours from the time of | | way journey | | Payment | +-------------------------------------------------+-------------------------------------------------+--------------------------------------+ | Two-third of amount of the fee | Fifty | One month from date of payment | | payable for fifty single journeys | | | +-------------------------------------------------+-------------------------------------------------+--------------------------------------+ 6. Fee for commercial vehicle (excluding vehicles plying under National permit) registered in the district where the fee plaza falls shall be 50% of the specified rate for that category of vehicle provided no service road or alternative road is available for use of such commercial vehicles. 7. The driver or owner or a person in charge of a mechanical vehicle which is loaded in excess of permissible load specified for its category, shall be liable to pay fee for entering the overloaded vehicle on the National Highway to the fee collecting agency, equal to the fee specified in sub-rule 1A of rule 10 of the said rules, and shall not be entitled to make use of the highway section unless the excess load has been removed from such mechanical vehicle. 8. All definitions including category of mechanical vehicles, its permissible load, category of exempted vehicles, service road, alternative road, etc. shall be as per definitions specified in the said rules. 9. The fee rates shall be displayed for information of the users in accordance with rule 12 of the said rules. 10. Based on the base rate of fee per kilometre for the base year 2007-08 as mentioned in Table-1 above, the actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by the Authority on the basis of the completed length of the section and revised annually in accordance with the rule 5 of the said rules and the same shall be published in at least one newspaper in English and vernacular language. 11. The estimated capital cost of the project is Rupees 1501.06 crore. The capital cost is subject to variation as the activities of land acquisition, utility shifting, tree cutting, etc. are yet to be completed. The Authority shall maintain a record of the recovery of capital cost through user fee realised. [F. No. GUJDIV-20015/5/2025-PIU Bhavnagar/E-256705] CHETNA NAND SINGH, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054. SARVESH KUMAR RUMAR SRIVASTAVARESH SRIVASTAVA +05:30 2025.10.14 22:34:24

Never miss important gazettes

Create a free account to save gazettes, add notes, and get email alerts for keywords you care about.

Sign Up Free